Original source · versioned page text
Minor Change Report OPW19 0266.02
APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW19/0266.02 Development Approval Development Permit for Operational Works – Earthworks, Landscaping, Stormwater Applicant Hutchinson Builders Request Received On 13 September 2022 Report Reviewed By Daniel Epps Decision Due Date 19 October 2022 PROPERTY DETAILS Property Address 215 David Low Way Peregian Beach Qld 4573215 David Low Way Peregian Beach Qld 4573 RP Description Lot 1 SP 286680 Land Area 17,805m² Existing Use of Land Commercial, residential (under construction) STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Tourist Accommodation and Local Centre Precinct Not applicable Local Area Plan Coastal Communities Overlays Acid Sulfate Soils, Biodiversity, Bushfire Assessment Type Minor Change to Development Approval PROPOSAL The applicant seeks approval to change to an existing development approval for Operational Works – Earthworks, Landscaping, Stormwater The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan background A development approval for Operational Works – Earthworks, Landscaping, Stormwater was approved on 13 October 2020. The works are associated with the development in the rear portion of the site. The subject application has been submitted to address construction changes to the stormwater drainage system, the carparking area adjacent to the “hotel” building, changes to sections of landscaping and some gate modifications. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and The Noosa Plan 2020. Statutory Process The applicant has requested to make a minor change to a development approval under s78 of the Planning Act 2016. An application for a minor change to a development approval can only be made in circumstances where a change would constitute a ‘minor change’. The proposed change to the development approval requested by the applicant is determined to constitute a minor change on the grounds that: the development would not result in substantially different development; the change does not include prohibited development; the change would not require the application to be referred to an additional referral agency or cause a referral agency to have regard to new matters prescribed by regulation; where the original application was code assessable, the change would not cause the application to become impact assessable. Statutory Instruments – Planning Scheme The following codes from the Noosa Plan 2020 are applicable to this development: Works Codes; Landscaping Code. Assessment The items in the subject application has been assessed as follows: Stormwater – referred to Council’s external consultant. The consultant is supportive of the changes Carparking – referred to a planning officer. The planning officer is supportive of the changes and the layout is functional Landscaping and gate modifications - referred to a planning officer. The planning officer is supportive of the changes. The applicant has not specifically described the conditions that require amendment to reflect the changes. Council has determined that the following changes are applicable Condition 1 – Approved Plans Assessment of Request It is recommended that the approved plans table be amended to reflect the new plan versions and add an additional plan: Plan No. Rev. Plan/Document Name Date 18164/C01 C Bulk Earthworks Layout Plan Prepared by Morgan Consulting Engineers 22/11/2019 18164/C02 B Bulk Earthworks Layout Plan – Sheet 1 Prepared by Morgan Consulting Engineers 17/09/2019 18164/C03 C Bulk Earthworks Layout Plan – Sheet 2 Prepared by Morgan Consulting Engineers 22/11/2019 18164/C04 B Bulk Earthworks Sections Prepared by Morgan Consulting Engineers 17/09/2019 18164/C10 H Siteworks and Drainage Layout Plan Prepared by Morgan Consulting Engineers 20/6/2022 18164/C11 H Siteworks and Drainage Plan – Sheet 1 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C12 I Siteworks and Drainage Plan – Sheet 2 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C13 D Siteworks and Drainage Details Prepared by Morgan Consulting Engineers 12/03/2020 18164/C14 F Bio-Retention Basin Details Prepared by Morgan Consulting Engineers 20/6/2022 18164/C15 G Detention Tank Details – Sheet 1 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C16 G Detention Tank Details – Sheet 2 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C21 F Stormwater Longitudinal Sections Prepared by Morgan Consulting Engineers 20/6/2022 18164/C24 C Stormwater Drainage Manhole Details Prepared by Morgan Consulting Engineers 20/6/2022 18164/C50 C Retaining Wall Plan – Sheet 1 Prepared by Morgan Consulting Engineers 17/09/2019 18164/C51 D Retaining Wall Plan – Sheet 2 Prepared by Morgan Consulting Engineers 22/11/2019 18164/C52 B Retaining Wall Details Prepared by Morgan Consulting Engineers 17/09/2019 WD-A-100 8 Site Plan – Ground Floor Detail Prepared by Red Door Architecture April 2019 SK-B-001 2 Ground Floor Plan Prepared by Red Door Architecture 2019 WD-B-740 1 Entry Gates Details Prepared by Red Door Architecture 2019 1 G Landscape Work Notes Prepared by Andrew Gold Landscape Architect 2/9/2022 2a G Planting Schedule and Images Prepared by Andrew Gold Landscape Architect 2/9/2022 2b G Planting Schedule and Images Prepared by Andrew Gold Landscape Architect 2/9/2022 3 G Overall Landscape Plan Prepared by Andrew Gold Landscape Architect 2/9/2022 4 G Proposed Fences Plan Prepared by Andrew Gold Landscape Architect 2/9/2022 11 G Planting Plan 1 Prepared by Andrew Gold Landscape Architect 2/9/2022 12 G Planting Plan 2 Prepared by Andrew Gold Landscape Architect 2/9/2022 13 G Planting Plan 3 Prepared by Andrew Gold Landscape Architect 2/9/2022 14 G Planting Plan 4 Prepared by Andrew Gold Landscape Architect 2/9/2022 15 G Planting Plan 5 Prepared by Andrew Gold Landscape Architect 2/9/2022 16 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 17 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 18 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 Condition 38 The 150mm diameter collector pipe and riser sections of the sub-soil drains of the bioretention device are to be provided as solid-walled pipes and not slotted Applicant’s Request Not specifically requested to change Assessment of Request Council’s external consultant has assessed the amended plans and has recommended that Condition 38 be reworded as follows: The 150mm diameter collector pipe and riser sections of the sub-soil drains of the bioretention device are to be provided as solid-walled pipes and not slotted. The Sub-soil pipes may be laid on zero grade for a saturated zone system. The drainage layer is to be increased to a minimum depth of 350mm. cONSULTATION Referral Agencies Not applicable Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Planning Other Referrals The application was forwarded to the following external experts for review and/or comment: Council’s external Stormwater consultant conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No. OPW19/0266.02, to make a minor change to an existing approval for Operational Works – Earthworks, Landscaping, Stormwater situated at 215 David Low Way Peregian Beach Qld 4573 described as Lot 1 SP 286680, Council on 25 October 2022 decided to: A. Approve the change. B. Amend conditions 1 and 38 to read as follows: 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 18164/C01 C Bulk Earthworks Layout Plan Prepared by Morgan Consulting Engineers 22/11/2019 18164/C02 B Bulk Earthworks Layout Plan – Sheet 1 Prepared by Morgan Consulting Engineers 17/09/2019 18164/C03 C Bulk Earthworks Layout Plan – Sheet 2 Prepared by Morgan Consulting Engineers 22/11/2019 18164/C04 B Bulk Earthworks Sections Prepared by Morgan Consulting Engineers 17/09/2019 18164/C10 H Siteworks and Drainage Layout Plan Prepared by Morgan Consulting Engineers 20/6/2022 18164/C11 H Siteworks and Drainage Plan – Sheet 1 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C12 I Siteworks and Drainage Plan – Sheet 2 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C13 D Siteworks and Drainage Details Prepared by Morgan Consulting Engineers 12/03/2020 18164/C14 F Bio-Retention Basin Details Prepared by Morgan Consulting Engineers 20/6/2022 18164/C15 G Detention Tank Details – Sheet 1 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C16 G Detention Tank Details – Sheet 2 Prepared by Morgan Consulting Engineers 20/6/2022 18164/C21 F Stormwater Longitudinal Sections Prepared by Morgan Consulting Engineers 20/6/2022 18164/C24 C Stormwater Drainage Manhole Details Prepared by Morgan Consulting Engineers 20/6/2022 18164/C50 C Retaining Wall Plan – Sheet 1 Prepared by Morgan Consulting Engineers 17/09/2019 18164/C51 D Retaining Wall Plan – Sheet 2 Prepared by Morgan Consulting Engineers 22/11/2019 18164/C52 B Retaining Wall Details Prepared by Morgan Consulting Engineers 17/09/2019 WD-A-100 8 Site Plan – Ground Floor Detail Prepared by Red Door Architecture April 2019 SK-B-001 2 Ground Floor Plan Prepared by Red Door Architecture 2019 WD-B-740 1 Entry Gates Details Prepared by Red Door Architecture 2019 1 G Landscape Work Notes Prepared by Andrew Gold Landscape Architect 2/9/2022 2a G Planting Schedule and Images Prepared by Andrew Gold Landscape Architect 2/9/2022 2b G Planting Schedule and Images Prepared by Andrew Gold Landscape Architect 2/9/2022 3 G Overall Landscape Plan Prepared by Andrew Gold Landscape Architect 2/9/2022 4 G Proposed Fences Plan Prepared by Andrew Gold Landscape Architect 2/9/2022 11 G Planting Plan 1 Prepared by Andrew Gold Landscape Architect 2/9/2022 12 G Planting Plan 2 Prepared by Andrew Gold Landscape Architect 2/9/2022 13 G Planting Plan 3 Prepared by Andrew Gold Landscape Architect 2/9/2022 14 G Planting Plan 4 Prepared by Andrew Gold Landscape Architect 2/9/2022 15 G Planting Plan 5 Prepared by Andrew Gold Landscape Architect 2/9/2022 16 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 17 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 18 G Details Prepared by Andrew Gold Landscape Architect 2/9/2022 38. The 150mm diameter collector pipe and riser sections of the sub-soil drains of the bioretention device are to be provided as solid-walled pipes and not slotted. The Sub-soil pipes may be laid on zero grade for a saturated zone system. The drainage layer is to be increased to a minimum depth of 350mm. [word/footer1.xml] Page 4 of 4 [word/header1.xml] 3 [Attachment: image2.png (image text)] EXISTING COMMERCIAL, DEVELOPMENT SITEWORKS_AND DRAINAGE NOTES a sar ar afr FFomco (woz087) PTY L10 syiseam: [se seme [PROPOSED MIXED USE een DEVELOPMENT [215 DAvIO Low Way, PEREGIAN [SITEWORKS AND ORAINAGE Cavour PLAN 181647010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original