SPA Decision Notice - 010.2010.00000661.001 [As Published] · 142010.661
2010/661
2. Structures shall be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
3. Jetties shall have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
4. A rigid handrail shall be fitted on one side of the walkway.
5. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
6. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without prior Council approval.
7. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
8. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
9. Rock scour protection, wrapped in geotextile, extends 750 mm from the face of the revetment
wall in this locality. Piles are to be located clear of this rock protection.
10. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
11. Boat repair activities are not permitted on site.
12. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
13. The mooring facility shall not be utilised for live-aboard purposes.
14. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 1997.
15. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangement to ensure adequacy of design and work. Any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does it absolve the owner of the land from complying with all the conditions of this approval
and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory
regulations in the execution and/or performance of said works. Council does not accept any
responsibility for the accuracy of such plans and specifications as approved.
16. Certification by a Registered Professional Engineer of Queensland that states that the jetty is
constructed in accordance with best practice methods and is structurally sound shall be
submitted to Council prior to the return of any bond monies held by Council. A final inspection
and approval of the structure by Council’s Inspector is also required prior to the return of any
bond monies held by Council. Please contact Council’s Land Development Section to arrange
the inspection.
17. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
Relevant Period
18. The Development Permit for Operational Works (Operational Works – Jetty) lapses if the
works have not been completed by 1 June 2012, unless an application to extend the relevant
period is approved by Council.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000661.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 53 KB (small file)
- File type
No other editions are linked here.