Council archive · source document
MCU14/0067 Driveway and Stormwater Layout
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
fo be confirmed
PROPERTY BOUNDARY
‘00 ~ 1600) 280,
| Top of extend
detention Gila,
20mm Filter Hedia (Sandy
‘Saturated hyraute
conduct “nn?
0mm Tonsten Loyer
Ionrce Sand (05 ~ 7.0mm Neninal Sie)
inn Pefotated Pie at 05%
longitudinal grace towards evetlow pt
Refer lst of landscope plants
on tandsape designers pls
ing
‘ad 300 lng eats to Be
‘Din below suroce
tr snare E.S.L.
/
280mm Drainage layer (Fine grovel
‘Som heninal Sze
BIO-RETENTION BED DETAIL
ferret PROPERTY BOUNDARY
[ee] AREA OF BIORETENTION BED.
conpark
QMS AREA OF GRASSED OR LANDSCAPED SWALE
LANDSCAPED SWALES
ROCK RETAINING WALL BRIDGING DETAIL
Project
UL ju
Hy yy
varies
300
GRASSED SWALES
minim
TIMBER RETAINING WALL BRIDGING DETAIL
CARPARK/DRIVEWAY BRIDGING DETAIL
Ho-retention basing,
DHETENTION #a5w ovERFLOW PIT NOTES
BIORETENTION CELL
INFORMATION
‘THIS BIORETENTION BASIN HAS BEEN
DESIGNED TO CAPTURE AND TREAT RUNOFF
IFROM THE SITE THEREBY REDUCING NEGATIVE|
IMPACTS OF THIS RUNOFF AND PROTECTING
THE HEALTH OF THE AQUATIC
WATERSYSTEM
800
INFORMATION SIGN - 1 OFF REQUIRED
PROPERTY BOUNDARY
Trin ae me Sr |
i 25 ut sie
a Chess st PvE
BIO-RETENTION BED - PIT DETAIL
ete Wen Sort only DS
LINDSAY CONSULTING PTY LTD
Project Number
LOT 2 RENE ST, NOOSAVILLE
Client
RAINFALL VOLUME CALCULATIONS
60036006510 deep Stormwater Pit
BIO-RETENTION BED - PIT DETAIL
140821
RON LOGAN
Le
SITE INFORMATION
\
Fieretenton meio spatiotin sal bein occrdone ih the fsiy for Afvoncng BHtratbn.
“Cuielines "Sol Fifer Hedi in Bnretentbn Syste". retention hyrauiccondatily shal bein
Sestve Ubon DesgeCestruin and Estobiehnen Gude - Seales, Sretantin Systene ond
Mellons (water by Desig
2. Under ltd rig pe uPVC or sir to AS 2438.1 or opprovad aminaan, 5% ML
grade. Refer project sawigs fer damatet ord inert level Typo ‘DOD. Pye shuld vet be
instoled whe filer sck surrounding pipe Undr-onoge pps sell be soled ini gis shy grout
ce ota opproved watertight #40
3. Refer to projet roving fr vetted batter los It 3 MAK, 1 typical end tater topo
requrenents
4 Filer lth — sen-woven gett. Fier lth rot tobe pled between ont fier loys apes
line noy te rege suber! fe 2 fectng reqranenis i cttdore withthe "Water Sective
Ubon Design Teta Design Guidelines” (Woe by Desig.
5. Basin ised surfve lee is Yop of fhe neda. Surface to be mulch ond planted as pr
landscape down.
4. Coretta folrones of acunnted in te “Woter Sensitive Urbon Design Centrcton ne
{stobehnen Guidnes~ Swales, Brenton Systeme of Melons” Woter by Dei ert be
xcieved. Construction fleraces ast berated on project plans. vert level of ps, pipes ond bose
Tevls must e noted on project rans
1. Rafe landscape rowing fer port spetotin, flan epctcten nd dest shall be in
corde withthe "Woler Sensitive Ubon Design Techel Design ueles” Water by Design
4 AL nein ve Wy mlinetres unless ofarvice note
SWPSOL DRAW CLEANOUT NOTES
1 Biren
“Guiles for Sol Fifer Mein Biretenin Sytens™ Boreenhon hydraute cond hall en
accardnce th the Faity fo Advosing Sfratin * Procce Note ily Measurement of
Hyrouic Condy". Te number of sompes te be Tested shal be In occordonce wh the "water
Seretive Uton Dein Cre trtivn od Estobichnent Guidelines ~ Swale, Biretentien Syctene oad
Wetlands (woter by Dei,
co apeiento shall bef otcordorce wth fhe foty fer Aden Bitrate
2. Underrated ri pipe 0 4S 243.1 o approved equal, D5Y% HR. grade Rete projet
‘owingy fr daneter ond ver level (Typkally UNO), Pipe is stad be ued uring plunbing
fenett ips should wot be istled wih fie! cok surrounding pipe, Ubt-tahage pet shall be
Seale inte ps usng peut or other oppeved watertight sea
2 Refer te project cringe for vetoed otter slop tin 3 MAX, "in 6fypel od Hater tepe
regiments
4 Basin sed surfce level i op of titer nadia, Surface fo be nuthed ond lnted as per
Torscape dawg.
5 Ingernaoble or - HOPE, benoit, cenpacted cay ot oppoved equivalent te bose ond si,
instoled os per monfacarrs ond/er geletnlerghesr'sspeiation, Where congotted clay
liner is pte, fer cloth is fo be ase as pe toe & on PWEAD droweg WSUD-ON Refer 1 the
dat SemtveUrbon Design Centruction ond Extoblshmant Guidelines - Soles, Bireentn
Systems ond Wetlands” (wofer by Dei for dsl
6 Conetacton tolerances chcaented in he "water Senite Ubon Dein Cnetuctin and
{efablehnent Guidlines - Swoles,Biereteton Systems od Wellode” (water by Desi wart be
ttheved Construction flores wurt beefed on poet plot,
1 Refer landscape drawing for pont speiicatin. Pont speiotion ond dete shal in
xcardance itt the “Water Serie Ubun Design Techical Design Caelies” water by Desig
A neni ore in wilintre une oars nate
iter th estan 50 pater ade ‘cat ben
seco
SWALE SUBSOIL DRAIN CLEANOUT
NOT TO STALE
Project LOT 2 RENE STREET, NOOSAVILLE Total Site Area 4005 sqm
Comments Rainfall Calculations Limiting runoff from Site (Dia 450) 999 m/sec (999 wids this check)
Permeable Pavement Area 0 sqm
ARR Intensity Calculation Data - As obtained from BOM IFD program Storage in bio-retention basins 0 chm
Tnput Data Roof Area into Detention Tank 0 sqm
Duration Effective Site area (Site-Less
ARL_[hr [en [rane Permeable Pavement Area) 4005 sqm
2 B23 «1025 «| Travel length 7 om
50 93.96 23.81 8.66 Site Slope 0.01
Surface Roughness 02
skewness 07] Map7 Land Description L UMD
|Geographical Factor (F2) 4.4) Map 8 Soil Permeability LHigh/Medium/Low (H/M/L)
[Geographical Factor (F50) 17.6] Map9 Light cover bushland, o poor grass cover, or lw density pasture or low cover bare falows
Medium Density Bush, or good grass cover o high densty pasture, oF zero ling eropping
Dense Bushland
Un-Developed Fraction Impenious 0.45 From Fig. 4.05.1 in QUDM (2007)
Developed Fraction Impenious 09 From Fig. 4.05.1 in QUDM (2007)
One Hr rainfall intensity for Q10 72.2511 mmihe
Calculated Travel Time 16 Min —_-Must equal time selected for intensity
Adopted Storm Time 10 min
Detention Tank Provided 18000 It
Retum interval (ARI)
7 2 3 70 20 50 700
Intensity (for Return Interval) 3972 726.5 Te5 oT, 772.69, 75.88, 26.13 249.12
C10 value 0790 0880 0780 0880 0790 0.880 0790 0880 0780 0680 0700 0880 0.700 0.880
Fy Factor 0.80 080 085 «0.85095 0.95 1.00 1001.05 1.05 4.15 1.15 1.201.20
oy 0632 0.704 OB718 0.748 0.7505 0.836 0.79 0.88 0.8295 0.924 0.9085 1.012 0.948 1.056
Q (maisec) 0.07 008 «009s Ott 038 0.15 O17 018 = 0.20 023025) 028 29
Total Rainfall for event (m3) 47 o4 66 102 124 153 176
Total Non-Worsening Volume for Storm (m3) 48 65 9 104 124 5.7 18
Roof Area Runoff for Storm (m3) 0 0 0 0 0 ° 0
LINDSAY CONSULTING {7
7
RPEO 4928
OFF, 2¢782 PARKE/STREET, MAROQHIVDORE PH Su 792 118
THIS DRAWING REMAINS THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
RON LOGAN
PROPOSED DEVELOPMENT
LOT 2 RENE STREET
NOOSAVILLE
DRAWING TITLE
BIORETENTION AND
STORMWATER CALCULATIONS
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVISION LIST
ORIGINAL ISSUE 27/08/14,
[Fomputer Fle
140821CP.dwg
DRAWING NUMBER SHEET] REV.
14-0821-C3 3/A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0067 Driveway and Stormwater LayoutRelated documentApplication case desk ↗
About this file
- File size
- 983 KB (small file)
- File type
No other editions are linked here.