SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2003.00221172.002 [As Published] · 132003.221172.2
Officer: Jack Lewis
Direct Telephone: (07) 5449 5294
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 23657 DA
Your Reference:
9 December 2008
Harman Family Trust
CARE Karen Harman
35 Lorilet Street
PEREGIAN BEACH QLD 4573
Dear Sir/Madam
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 9 December 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 23657 DA
Street address: 61 Elanda Street, Sunshine Beach
Real property description: Lot 408 RP 48112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 14 October 2004 decided to issue the following type of approval:-
Preliminary Approval for Material Change of Use - Duplex Dwelling
In relation to representations, Council on 16 December 2004 decided to:
A. Grant a development permit subject to the conditions contained in the preliminary approval
issued on 14 October 2004
B. Agree to delete Condition 1, 12 & 13
C. Agree to amend Condition 2. As a result of the deletion of Condition 1, Condition 17 was
subsequently amended
In relation to your request to extend the relevant period for the above development approval, Council
on 9 December 2008 decided to:
A. Extend the relevant period until 16 December 2010
B. Approve a change to Condition 17
C. Issue a Change to an Existing Approval
Page 1 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
2003/221172
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Deleted.
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered 4/1918/S1E 1 & 2,
prepared by Adrian Pooley & Associates and dated 15 November 2004, and as may be
amended by these conditions.
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. The development must not exceed 40% maximum site cover, as defined by the Schedule to
the Planning Scheme.
2
5. The development is to provide a minimum 264m of landscaped open space, as defined by
the Schedule to the Planning Scheme.
6. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter and to include the
following:-
6.1 Dense landscaping is to be implemented along the southern boundary, specifically to
the area where the basement wall extends to 0.900 metres from the southern boundary.
The landscaping shall include understorey plantings and a diverse range of trees
ranging from 45 to 75 Litres and whereby an average height of 3 metres is achieved.
6.2 Screening vegetation in the form of native trees and understorey plantings is required to
be planted along the full length of the northern boundary.
6.3 The Eucalyptus Intermedia located at the front of the site is to be retained.
6.4 All retained trees are to be protected from filling works and barricaded to prevent
damage occurring during construction.
6.5 The two Eucalyptus located at the rear of the site shall be replaced with the same
species during the landscaping of the development.
6.6 Two street trees endemic to the Sunshine Beach locality are to be planted in the road
reserve.
7. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. The landscaped
plans referred to above are to denote areas of existing vegetation or existing trees proposed to
be retained.
8. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing to be setback 2 metres. The area of land between the fence and the front
property boundary shall be densely landscaped to screen any fencing.
9. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus
remaining as open structures.
10. Balustrading is to be of open and transparent materials.
Page 2 of 11
Page 3
2003/221172
11. The development must not exceed a building height of three (3) storeys and twelve (12)
metres measured vertically at any point from both the natural ground level and the finished
ground level, in accordance with the requirements of the Schedule to the Planning Scheme.
12. Deleted.
13. Deleted.
14. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow
of 9 litres per min. Dishwashers and washing machines are excluded from this requirement.
15. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
16. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
17. This Development Permit for a Material Change of Use lapses if:-
17.1. the use has not commenced by 16 December 2010, unless application is made and
approved by Council for an extension; or
17.2. the use of any premises pursuant to the Development Permit ceases.
18. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Land Development
Vehicle Access
19. A 4.5 metre wide vehicular access driveway to serve the development shall be constructed
from the Elanda Street frontage of the site.
The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
20. All vehicles shall enter and leave the site in a forward direction.
Carparking
21. Carparking shall be provided within the site as shown on drawing number 4/1918/S1c dated
2/8/04 by Adrian Pooley & Associates Pty Ltd, except as modified herein.
22. A minimum of 4 covered carpark spaces shall be provided on site and the carparking area
shall be designed to comply with the provisions of AS 2890.1-1993 with a minimum head
clearance (headroom) at any point of 2.2m.
23. The column located to the south west of carpark space number 3 (in-line with the garage wall
to the west of carpark space 3) largely inhibits the forward manoeuvre of vehicles that have
reversed from spaces 3 & 4. As such, this column shall be relocated so that it does not inhibit
any vehicle manoeuvres.
Page 3 of 11
Page 4
2003/221172
Vegetation Protection
24. Existing trees to be retained shall be protected during the construction phase by providing
temporary fencing around the trees. Plans submitted for Operational Works approval shall
clearly show this.
Roadworks Contributions
25. A roadworks contribution of $1,061 towards the Coastal Major Road Network shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount will
be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date
of payment.
Roadworks Widening
26. The Elanda Street frontage of the development shall be provided with kerb & channelling and
bitumen road widening. The new kerb & channel shall be aligned so that it is located 8 metres
off the existing kerb & channel on the western side of the road measured from the nominal
face of the kerb.
All associated and ancillary work including pavement correction to the existing pavement,
drainage works, modification of the footpath, and adjustments to any existing infrastructure
shall be undertaken to complete the roadworks widening.
Plans detailing this work shall be prepared and submitted to Council for approval prior to
obtaining a Development Permit for Operational Works.
Frontage Works
27. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
28. A new 1.2 metre wide concrete path shall be constructed along the frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant
vegetation or any underground services. The path shall be designed and constructed to
ensure pedestrian safety using non-slip materials and to produce an evenly graded surface
finish.
Pathway Contributions
29. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment.
Stormwater Drainage
30. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site. Plans of the drainage design shall be prepared by a
Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
Any stormwater discharged to Council’s street drainage system shall have a maximum
discharge at any one location of 25 litres/second.
31. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
32. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Page 4 of 11
Page 5
2003/221172
Town Water Supply
33. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
34. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units are served by a single service, multiple water meters to
each individual unit shall be installed. All fees for the supply of water meters shall be paid to
the Council.
Service Easements
35. A registered easement shall be created over the existing sewer main that crosses the rear of
the site. The easements shall generally be parallel to and centred over the sewer main and be
equivalent in width to twice the depth to invert level of the sewer at the deepest point within the
allotment (measured from the finished surface) and be no less than 3.0 metres wide.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
36. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s underground
must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1 metre below a
line of influence measured 1 metre in the direction of the foundation from the centreline of the
closest underground service and along the natural angle of repose of the foundation soil
type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed by
a registered practicing Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Headworks
37. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of June 2004 under the current policies is as follows:
Water Supply $ 4,255
Sewerage $ 2,905
TOTAL $ 7,160
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned.
Page 5 of 11
Page 6
2003/221172
Earthworks
38. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with any natural watercourses.
39. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences that border the development site unless it is intended to replace such fences. In this
regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
Erosion and Sediment Control
40. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
41. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
42. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
43. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
44. A Registered Professional Engineer of Queensland shall certify engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
Building Services
45. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
Environmental Health
46. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers. A wash down area is required with a cold-water tap, hose and
drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry
to the sewerage system.
47. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
48. All lift plant including motors, shall be situated within the building or suitably provided with
noise reduction measures and located as to prevent a noise nuisance beyond the subject land
in accordance with the nuisance provisions of the Environmental Protection Regulation 1998.
On the spot fines apply for such offences.
49. Noise emission from air conditioning equipment shall comply with the following requirements:
Page 6 of 11
Page 7
2003/221172
49.1 The equipment shall be installed and located in a manner which prevents noise
nuisance beyond the subject land in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of
Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
49.2 Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is
required immediately after installation of the equipment and prior to any occupation of
the building, and in a format approved by Council.
49.3 A person must not use equipment on any day if it makes or causes noise to be made –
49.3.1 Before 7am or after 10pm: More than the lower of either –
40 d(B)A
3 d(B)A above the background noise level
49.3.2 From 7am to 7pm: More than the lower of either –
50 d(B)A
5 d(B)A above the background noise level
49.3.3 From 7pm to 10pm: More than 3 d(B)A above the background noise level.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Building is to comply with the Building Code of Australia Section C Fire Resistance in regard to
distances or protection required.
2. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit.
3. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
making noise from:-
3.1. Monday to Saturday, before 7:00am or after 6:30pm
3.2. Sunday or public holiday, at any time.
A maximum penalty of $1,500 applies to an offence under these provisions.
4. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
course. On the spot fines apply for such offences.
Page 7 of 11
Page 8
2003/221172
5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service levy is required to
be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
that confirms that the requirements of the Act have been satisfied. A statutory declaration
outlining the cost of the operational works must be submitted to Council with the lodgement of
any application for operational works over the site.
6. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access
and the provision of disabled facilities, and that access to this building and the provision of
sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
F Clause F2.4 of the Building Code of Australia.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works Duplex Dwelling
Development Permit for Operational Landscaping, Carparking and Access, Frontage
Works Works, Stormwater Disposal, Sediment and Erosion
Controls and Filling of the Site
11 SELF ASSESSABLE CODES
Not applicable
12 SUBMISSIONS
There were no properly made submissions about the application.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
Page 8 of 11
Page 9
2003/221172
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
DECISION NOTICE HISTORY
Original Decision Notice issued 14 October
2004.
Negotiated Decision Notice issued 16
December 2004 with amendment to
Conditions 2 & 17 and deletion of Conditions
1, 12 & 13.
Change to an Existing Approval issued 9
December 2008 with amendment to Condition
17.
Yours faithfully,
Denis Wallace
PLANNING OFFICER
Page 9 of 11
Page 10
2003/221172
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must be Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
(co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be started
following notices have been given may appeal to the
at any time after the last day a decision on the matter
court against the decision in the notice-
should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
(b) a notice giving a decision on a request to make a
appeal to the court about-
minor change to an approval.
(a) the giving of a development approval, including any
(2) The appeal must be started within 20 business
conditions (or lack of conditions) or other provisions
days after the day the notice of the decision is given to
of the approval; or
the person.
(b) the length of a relevant period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 10 of 11
Page 11
2003/221172
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 11 of 11
Used in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2003.00221172.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.