Note 17. Provisions (continued)
2018 2017
Notes $'000 $'000
Council has the following restoration provisions:
Landfill sites
The provision represents the present value of the anticipated future costs associated with the closure of the
Eumundi Rd landfill sites, decontamination and monitoring of historical residues and leaching on the site.
The calculation of this provision requires assumptions such as application of environmental legislation, site
closure dates, available technologies and engineering cost estimates. These uncertainties may result in future
actual expenditure differing from amounts currently provided. Because of the long-term nature of the liability,
the most significant uncertainty in estimating the provision is the costs that will be incurred.
The provision recognised for the Eumundi Rd landfill sites is reviewed at least annually and updated based on
the facts and circumstances available at the time. Management estimates that the site will fully close in 2070
and that site restoration will occur progressively over the subsequent thirty years. The provision recognises the
costs associated with closure and rehabilitation of historical and existing cells as well as the rehabilitation of
the site following full closure in 2070.
Quarry Sites
The provision represents the present value of the anticipated future costs associated with the closure of the
Ringtail Creek quarry site, reclamation and rehabilitation of the site.
The calculation of this provision requires assumptions such as application of environmental legislation, site
closure dates, available technologies and engineering cost estimates. These uncertainties may result in future
actual expenditure differing from amounts currently provided. Because of the long-term nature of the liability,
the most significant uncertainty in estimating the provision is the costs that will be incurred. The provision
recognised for quarry sites rehabilitation is reviewed at least annually and updated based on the facts and
circumstances available at the time.
2018 2017
Notes $'000 $'000
Current
Long Service Leave 4,364 4,076
Landfill Sites 284 273
TOTAL CURRENT PROVISIONS 4,648 4,349
Non-current
Long Service Leave 618 534
Quarry Rehabilitation 50 50
Landfill Sites 9,069 8,986
TOTAL NON-CURRENT PROVISIONS 9,737 9,570
Page 30
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2017-18(PDF, 10MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.