Council archive · source document
Appendix 6. Odour Buffer Assessment [As Published] · 132007.2399
[3]
Odour Buffer Assessment
StarCo Developments
STP
Noosa Springs
Development
Offices
Area of
Interest
Approximate
Location of
Current Buffer
Figure 2.2: Location of Proposed Development
2.3 Complaints
Historically the Noosa STP has been the cause of numerous odour complaints. However, a recent
major upgrade of the treatment plant has resulted in a dramatic reduction in the number of
complaints. Since the beginning of 2000 the plant has received only three odour complaints, all
associated with abnormal activity on site (e.g. equipment failure).
The Noosa Springs development has also been noting and investigating any odour events that may
be attributed to the STP for the previous 18 months. During that period only one event (one of the
three previously mentioned) was sourced to the STP. Of particular note is the location of the
Noosa Springs development offices, to the east of the existing tennis courts.
3 ODOUR ASSESSMENT CRITERIA
The recently released Queensland EPA Guideline on ‘Odour Impact Assessment from Developments’
contains a detailed discussion of issues associated with odour response and assessment. This
section of the Guideline briefly describes the basic factors associated with odour response, known
as the FIDOL factors, and then identifies assessment criteria.
1898a report final.doc PAE Job Number 1898a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 6. Odour Buffer Assessment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.