Council archive · source document
Appendix 6. Odour Buffer Assessment [As Published] · 132007.2399
ES1 EXECUTIVE SUMMARY The proposed development of Precinct J at Noosa Springs will occur within a 600 metre buffer that has been established around the Noosa Sewage Treatment Plant (STP). An assessment of odour impacts is required to determine whether development within the buffer would be adversely affected by odour emissions from the STP. A similar issue arose for previous residential development within part of Precinct G (associated with the recently approved development application for resort residential uses in Precinct F), and StarCo commissioned PAE to prepare a detailed odour assessment based on a combination of advanced modelling, source odour measurements, field observations and a small community survey. The same modelling has been used to show the predicted impact of the STP on odour levels in Precinct J. The results show that the predicted odour levels in Precinct J are within the 2.5 odour unit guideline set by the Queensland EPA. This result in conjunction with the other information gathered for the Precinct G assessment leads us to conclude that the odour impacts in Precinct J are acceptable. 1898b Report.doc iii Noosa Springs Precinct J Development StarCo Developments Limited PAE Job 1898b
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 6. Odour Buffer Assessment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.