Skip to the record
Accept no substitutions.

Council archive · source document

Appendix 6. Odour Buffer Assessment [As Published] · 132007.2399

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Figure 2.2: Location of Proposed Precinct J Development Relative to 600 m
                                STP Buffer




2.2 Odour Complaints
Historically the Noosa STP was the cause of numerous odour complaints. However,
a major upgrade of the treatment plant several years ago resulted in a dramatic
reduction in the number of complaints. Since 2000 the plant has received only rare
odour complaints, all associated with abnormal activity on site (e.g. equipment
failure).

For its earlier stages, the Noosa Springs development noted and investigated any
odour events that may be attributed to the STP over a period of at least 18 months.
During that period only one event (one of the three previously mentioned) was
sourced to the STP.




1898b Report.doc                                                                      3
Noosa Springs Precinct J Development StarCo Developments Limited
PAE Job 1898b

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix 6. Odour Buffer Assessment [As Published].pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.