2018-07-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General Committee
Meeting
Monday, 16 July 2018
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 40 sections
Section 2
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE 2
1. MCU16 0079 02 REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 5
MEMORIAL DRIVE, TEWANTIN
(Planning & Environment Committee Agenda, Item 3, Page 23)
Reason for referral – for a further report (refer Item 5 below).
2. OPW17/0555 - REPRESENTATIONS TO CONDITIONS - DEVELOPMENT PERMIT FOR
OPERATIONAL WORKS FOR SIGNAGE, LOCATED AT 4-24 GIBSON ROAD,
NOOSAVILLE
(Planning & Environment Committee Agenda, Item 5, Page 46)
Reason for referral – significance of the issue.
3. DRAFT NOOSA RIVER PLAN FOR COMMUNITY CONSULTATION
(Planning & Environment Committee Agenda, Item 8, Page 83)
Reason for referral – significance of the issue.
ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE 2
4 NOOSA TRANSPORT STRATEGY - 12 MONTH PROGRESS REPORT
(Services & Organisation Committee Agenda, Item 4, Page 16)
Reason for referral – significance of the issue.
REPORTS DIRECT TO GENERAL COMMITTEE 3
5 FURTHER REPORT MCU16/0079.02 REQUEST TO CHANGE A DEVELOPMENT
APPROVAL FOR EXTENSIONS TO RSL CLUB AT 5 MEMORIAL DRIVE
TEWANTIN 3
6 CAPITAL PROGRAM DELIVERY STATUS - JUNE 2018 6
7 FINANCIAL PERFORMANCE REPORT - JUNE 2018 INTERIM 18
8 YEAR IN REVIEW 2017-18 29
CLOSED SESSION -
Page 2 of 41
Section 3
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
REPORTS DIRECT TO GENERAL COMMITTEE
5 FURTHER REPORT MCU16/0079.02 REQUEST TO CHANGE A DEVELOPMENT
APPROVAL FOR EXTENSIONS TO RSL CLUB AT 5 MEMORIAL DRIVE TEWANTIN
OCUMENT INFORM AT ION
Author Development Planner, Wilhelm Koschade
Environment and Sustainable Development Department
Index ECM/ Applications/ MCU16/0079.02
Attachments Nil.
EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 10 July 2018 and the Further Report to the General Committee dated
16 July 2018 regarding Application No. MCU16/0079.02 for a minor change to Development
Permit for Material Change of Use of Premises for extensions to RSL Club situated at 5 Memorial
Avenue, Tewantin, described as Lot 10 on SP 273411 and:
A. Agree to amend condition 3 to read as follows:
3. The proposed development provides for an extension to the Gaming Area (providing
for a maximum of 195 gaming machines and limited to a total floor area of 565m 2),
Smokers Terrace, Store, Children’s Lounge, basement carpark area and other
internal modifications as shown on the approved plans.
B. Investigate the development of a policy for gaming machines to minimise the potential
harm associated with gambling.
REPORT
A report on this application was considered by the Planning & Environment Committee meeting
on 10 July 2018. The application was referred to the General Meeting for further information,
requested by councillors. Officers advised at the meeting that a further report would be prepared
for the General Committee meeting providing detail and discussion around the matters raised at
the Planning and Environment Committee.
The matters raised at committee are discussed below.
1. What are the requirements and best method for Council to develop/adopt a policy on
gaming machines?
Advice has been sought from the Department of State Development, Manufacturing,
Infrastructure and Planning with respect to the development of such a policy or planning scheme
provision. The Department has advised that they are not aware of any other Council in
Queensland who has attempted to influence or regulate this matter in any way and requires
further time to investigate this matter. The Department has advised that they are unlikely to be
able to provide advice to Council prior to Council’s Ordinary Meeting in July 2018.
2. What is the approximate annual turnover of a single electronic gaming machine?
No statistics were found with respect to the average turnover of a single electronic gaming
machine annually. However, as a broad indication, in July 2017 there were 42,757 operational
Page 3 of 41
Section 4
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
poker machines in Queensland at 1156 sites. In July alone, Queenslanders lost $216 million
playing electronic gaming machines in clubs and hotels. This equates to approximately $5,051
per gaming machine for the month of July 2017, on average.
These figures were published by the Brisbane Times newspaper on 18 September 2017.
3. Is gambling a separate use to the current Tewantin RSL?
The RSL has been approved as an undefined use under The Noosa Plan. This is because the
existing uses collectively do not fit neatly with any of the uses under the Noosa Plan, these being
a combination of community and entertainment and dining uses.
Under The Noosa Plan, the operation of electronic gaming machines is best characterised as an
entertainment and/or amusement activity, consistent with The Noosa Plan definition of an
Entertainment and dining business – Type 2 Recreation, amusement & fitness. The various
entertainment and dining business uses under the planning scheme are listed below for Council’s
reference:
The existing approval includes entertainment and dining uses and on this basis it is considered
the proposed additional gaming machines are in keeping with the approved use for the site and
does not constitute a new use or a material increase in the intensity or scale of the approved use
of the premises.
4. Should the proposed change be publicly notified for comment, as the proposal may
give rise to social impacts?
Pursuant to the Planning Act 2016, minor change means a change that:
“for a development approval—
(i) would not result in substantially different development; and
(ii) if a development application for the development, including the change, were made when
the change application is made would not cause—
(A) the inclusion of prohibited development in the application; or
(B) referral to a referral agency, other than to the chief executive, if there were no referral
agencies for the development application; or
(C) referral to extra referral agencies, other than to the chief executive; or
(D) a referral agency to assess the application against, or have regard to, matters
prescribed by regulation under section 55(2), other than matters the referral agency
must have assessed the application against, or have had regard to, when the
application was made; or
(E) public notification if public notification was not required for the development
application.”
Page 4 of 41
Section 5
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
The definition of minor change no longer includes a provision around whether a person is likely to
make a submission to the proposed change as previously provided for under the Sustainable
Planning Act 2009.
The proposed change to the development approval requested by the applicant meets the
Planning Act 2016 requirements for a minor change as detailed in the report to the Planning &
Environment Committee meeting. The proposed change will not result in a substantially different
development to the approved development.
While an increase in the number of gaming machines may arguably increase the severity of
known social impacts, the proposal does not materially change the intensity of the approved use
given the current Noosa Plan does not regulate gaming machines. The proposed change raises
no conflict with the Noosa Plan and therefore there are no appropriate grounds to refuse the
requested change and require the applicant to lodge a new development application in order to
publicly notify the requested change on these grounds. Council could only reasonably regulate
gaming machines through the development assessment process if there were specific planning
scheme provisions for gaming machines and there is currently nothing to this effect in The Noosa
Plan.
5. Can Council consider the issue of need in the community services zone and if so
what criteria could apply?
The proposed use is specifically contemplated for the site by The Noosa Plan and therefore is
not required to demonstrate need given the uses consistency with the site’s community services
zoning.
CONCLUSION
It is concluded that while it is concerning that the RSL is continuing to increase the number of
gaming machines within the club, the proposed increase is consistent with their current state
licence. The proposed increase is a moderate increase of 15 machines representing an 8.1%
increase and does not raise any conflict with The Noosa Plan. Therefore, officers confirm their
previous recommendation to Council to change the condition to reflect the number of gaming
machines currently approved by the state and investigate the potential for Council to develop a
policy and/or introduce planning scheme provisions in the future.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 5 of 41
Section 6
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
6 CAPITAL PROGRAM DELIVERY STATUS - JUNE 2018
DOCUMENT INFORM AT ION
Author Asset Planning Manager, Bryan O’Connor &
Infrastructure, Planning, Design & Delivery Manager, Craig Eldridge
Infrastructure Services Department
Index ECM/ Subject/ 2017-2018 Annual Capital Works Program
Attachments 1. Capital Projects Delivery Status, 30 June 2018
EXECUTIVE SUMMARY
The project delivery status report is presented regularly to Council for consideration. This report
particularly highlights the projects that have been delivered throughout the 2017/2018 financial
year.
This report also provides a capital project delivery spreadsheet (Attachment 1) that gives a
general overview of the financial status of all projects as they were delivered.
RECOMMENDATION
That Council note the report by the Asset Planning Manager to the General Committee Meeting
dated 16 July 2018 providing an update on the status of the projects being delivered throughout
the 2017/18 Capital Works Program and note that the anticipated 2017/18 Financial Year capital
expenditure final result will be $27.8M, equivalent to 90% of the $30.9m capital works budget.
REPORT
The purpose of this report is to inform Council of the overall status and associated activities of
the Capital Works Program to the end of June 2018. The report provides an opportunity to
highlight and discuss projects within the program and confirm the delivery status of projects
delivered throughout the 2017/2018 financial year.
There were 126 active projects in the 2017/18 capital program as of 30 June 2018 (including the
carryover projects from 2016/2017) with a value of $30.9m.
1. Current Projects
The major focus in the final quarter of the financial year was to complete the construction phase
of projects. However, some significant projects are programmed as multi-year projects, meaning
they will be delivered over two or more financial years. Additionally, the majority of design only
projects in the financial year are completed in preparedness for the construction phase
throughout the 2018/19 financial year.
Projects currently underway or being delivered across multiple years of the capital program
include:
Noosa Heads Main Beach Boardwalk renewal
Noosa Heads Park Road Boardwalk renewal
Noosaville Noosa River Holiday Park small & large amenities renewal
Tewantin Hilton Terrace & Ernest Street Intersection upgrade
Black Mountain Black Mountain Road rehabilitation (design only)
Cooroy Donnellys Road upgrade
Pomona Station Street bus turnaround
Cooran Pioneer Park upgrade
Castaways Beach Castaways Beach carpark upgrade (design only)
Cooroy Mary River Road Bridge replacement
Page 6 of 41
Section 7
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Cooran Old Noosa Road Bridge replacement
Sunrise Beach Orealla Crescent Bridge refurbishment (design only)
Noosaville Noosaville Library refurbishment
Cooroy Hinterland Playground – Planning Stage
Noosaville - Library Refurbishment
Cooroy – Hinterland Playground (Planning Stage)
The above projects will continue to be delivered throughout the 2018/19 financial year with the
Tewantin - Hilton Tce upgrade and the Cooroy - Hinterland Playground projects to continue
through the 2019/20 financial year as well.
Page 7 of 41
Section 8
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
2. Completed Projects
A major milestone for Noosa Council was the delivery of $25.8m of capital works in a single
financial year. This a great achievement and demonstrates that Council has matured in delivering
a large capital works program consistently. The establishment of a capital works framework that
has project control groups and a capital works executive, have created organisational efficiencies
and enabled staff and Councillors to make informed decisions that relate to projects that are
delivered throughout the year. This is aided by having valuable resources within the design and
delivery teams.
Some of the projects completed across the capital program throughout 2017/18 include:
Peregian Beach Digital Hub Project
Noosaville Wallace Park Pathway Renewals
Noosa Heads Noosa Spit SLSQ Storage Facility
Cootharaba Kinmond Creek Culvert upgrades
Noosaville Weyba Road Corridor Improvements
Tewantin Boat Ramp Upgrade
Cooroy Cooroy Library LED Lighting Renewal
Six Mile Creek Flood Gauge Monitoring Systems
Sunshine Beach Skate Park Renewal
Tewantin Cooroy Noosa Road Stage 1 & 2
Noosa Heads Seahaven retaining wall
Noosaville Gympie Tce upgrade
Whole of Shire Bus Stop upgrade program
Noosaville Lake Weyba Drive bus turnaround
Black Mountain Landslip
Peregian Beach – Digital Hub Project - Completed
Noosaville – Wallace Park Pathway renewals - Completed
Before After
Page 8 of 41
Section 9
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Cootharaba – Kinmond Creek Culvert Upgrade - Completed
In addition to the above-mentioned completed projects, delivery of the 2017/18 road reseal
program of approximately $3m was completed across both coastal and hinterland sealed road
networks.
Noosaville – Weyba Road Upgrade – Completed
5. Summary
The current capital delivery expenditure to 30 June 2018 is $25.8m, or 83% of the capital
program. The final financial processing of invoices for goods received and works undertaken for
the 2017/18 program is still in progress with an estimated value of $2m of invoices yet to be
recognised for 2017/18 year. This is anticipated to improve the year to date actuals to $27.8m or
90% of the $30.9m budget for the 2017/18 financial year.
It is important to note that there are $16.8m in outstanding commitments. This amount not only
reflects those projects that are delivered, but also new contracts awarded for 2018/19 works that
are yet to commence. A review of these commitments identifies an estimated $3.8m outstanding
commitments related to the 2017/18 year with the remaining $13.8m related to projects being
delivered in the 2018/19 financial year.
The outcome of the 2017/18 capital works program will be reported to Council in the first budget
review of 2018/19 financial year and will confirm the significant achievement of delivering the
largest capital works program to date for Noosa Council.
Page 9 of 41
Section 10
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
The table and graph below provide a breakdown of expenditure as at 30 June 2018.
YTD Current Budget $ 30,939,428
YTD Actual Expenditure $ 25,752,982
Remaining Capital Expenditure $ 5,186,446
Full Year Budgeted Expenditure $30,939,428
Capital Works Program Expenditure as of 30/06/2018
Remaining Capital
Expenditure
16.76%
YTD Actual
Expenditure
83.24%
Previous Council Consideration
Nil.
Finance
Nil.
Risks & Opportunities
Nil.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Project delivery staff within the Infrastructure Services Department were consulted in the
preparation of this report.
Page 10 of 41
Section 11
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development X Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Community Engagement Building & Plumbing Services X Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 11 of 41
Section 12
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 12 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 10-Jur2018 141206
s00500 500500 - Cooroy Mary Fiver Road Timber Bridge Rehabilitation a 6 o a 6 21s = o00%
so0so3 ‘500503 - Whole of Shire ridge replacement program - Planning and des 1,500,000 1,500,000 o a 6 o oo 0.00%
$00813 500510 - Mary River Road Eridge Replacement a 6 401350 354,200 364,200 T3356 1520,633 0 2.71%
s00814 500811 - Cid Noosa Road Bridge Repiscement a o 254,400 130,200 130,200 68.508 1201,7630 52.62%
s00812 500812 - Oreatia Crescent Overpass Refurbishment a ° 33,600 33,600 33,600 21042 T4650 62.62%
s00416 500818 - Weybe Creek Sridge deck joints a 6 60.000 soo 0 398 oo 73.81%
Total Bridges 1,600,000 1,600,000 ‘748,260 618,600 618,600 186,500 2,780,061 21.82%
s00510 500510 - Nocss Main Beach - Sand Pumping Pipe Replacement Program a 6 o a 6 17 = 0.00%
Soov77 SOUTT7 - Noosaville Noosa Waters Lock & Weir Annual Renewal Program 12,000 12,000 o a o o oo 0.00%
soorss 500784 - Noosa River Bathymezy Survey 60,000 60,000 6o,0c00 a 6 53% 09 0.00%
so0s81s 500816 - Seamaven Retaining Wall a o 43,550 43,550 43,550 45734 oo 105.05%
soo4is 500815 - Noosa North Shore 3rd Cutting Beach Access 0 6 23,500 23,500 23,500 18,143 oo 77.20%
S00820 500820 - Renewal of revetment wal at O-Goats Gympie Tce, Noosavile a 6 225,000 1,085 1,085 2061 14,5500 189.95%
Total Coactal Canaic and Waterways 72,000 72,000 362,060 28,136 88,146 72442 14,860 106.17%
soosss 500545 - Graveside Safety Fence a 6 o 15,680 15,580 15,680 = 100.00%
Total Cemeteries o 6 o 16,880 16,880 16.880 o 100.00%
Commerical Land & Property
s00207 SO0207 - Rufous St Design & Development Phase a o o a o 620 oo 0.00%
s006s3 500653 - Peregian Seach, 5 Rufous St Redevelopment Construction 2,900,000 2568,735 2,568,735 2662,718 2682,718 (2,748,336 oo 102.45%
S00730 500730 - Peregian Beach, Rufous St Civil Works a 50,853 550,293 550,893 550,853 531,615 oo 3.50%
soor7s ‘SO077S - Carpenters Lane industrial Development a 6 o a 6 37755 06 o0%
500851 500855 - Peregian Digital Hud - FRout a o o a o 5a278 a6 1.00%
Total Commerioal Land & Property 2,000,000 3,118,628 3,118,428 328,011 3233,611 3,388,204 21,784 14.17%
Community FCM
0072s 100726 - Peregian Sur’ Cub Public Amenities - Planning & Design 36,000 35,000 35.000 36,000 35,000 730 3530 2a
500538 - Nocss Heads Demolition of Litequard Service’ SLSQ operations a o o a o 272 oe 00%
500651 ‘500651 - Nocsavilie Litrary, Refurbishment Planning and Design a a7.347 AA13,127 306,531 906,931 704220 [email protected]%
500553 - Noosa Heads, Lions Park Public Amenities Returbishment a oe o a 6 617 oo o00%
‘500656 - Cooroy trary, Repairs t Stip Lighting a e304 $3084 me e304 67570 oo 107.18%
so006s5 ‘S005S5 - Noosa Heads, The J Upgrade Theatre Seating Capacity a ° o o 6 S263 06 o00%
s00731 ‘500731 - Sunshine Beach, NAC Overfiow Carpark Orainage a o o a o 4512 06 0.00%
soorss ‘SO07SS - Pomona School of Arts Roof Rectficaton a 6 o a 6 320 oo o00%
Soares ‘SO0TSS - Girraween Sports Complex - condition assessment priority wor 53,500 $3,500 $3,500 53,500 53,500 55264 oo 103.48%
so00so3 ‘SO078S - Noosa Community Support - Carport and internal Auto Door a 31,000 31,000 31,000 21,000 28,708 oo 32.60%
so00s0s ‘500805 - Nocss Community Support a 120,000 120,000 120,000 120,000 06,578 oo S8.82%
so0842 ‘500560 - Tewantn SES Termte Damage a 6 o 6,300 6,300 1333 oo Ess
so0sss 5008468 - Noosa Aquatic Centre 50 Metre Circuiaton Pump a 6 o 20,000 20,000 o 00 0.00%
Page 12 of 41Section 13
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 13 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report rum date: 10-Jur-2018 14-1206
s00sss 500550 - NAC 25m Poo! Slanket Replacement a 6 o 25,000 25,000 “ass oo 59.58%
s008s7 500851 - NAC & NLC Roo? Restoration (to Support Solar Panets) a 6 o 72,500 72,500 o oo o0%
so0sss 500856 - Noosa Leisure Cenire - Cate Fridge a 0 o a 6 5519 06 0.00%
500895 - Noosa Aquatic Centre - infiatabie a 6 o a 6 73% 06 coos
so0s02 500800 - NAC - Heat Pump a o o a o 7,100 06 0.00%
s00s03 500501 - Cooroy Library Compactus Unk a o o a 6 Tass oo 0.00%
500502 - NAC Stove a 6 o a 6 sis oo o0%
Total Communtty Fscilites #5600. a70a81 ~~ *1a1ea71 ~*~‘ Cee ~* iE ~C* OT ~*~SNS eT ~SC*CS
Corporate Bu
S00727 500727 - Noosa Depot Workshop Electrical Replacement a 3.293 3293 3,233 3233 o oo 0.00%
S00761 SO0761 - Nocsavilie Depot - Replacement of ducted air con system a 40,527 40527 40,527 40,527 35,500 06 7.20%
soo77e SOOTTE - Tewantin Adminiration Sullding - masterpian 100,000 100,000 100,000 20,000 20,000 a 06 O.12%
soo77s S0077S - Doonella House - Emergent works 60,000 60,000 o a 6 o 06 0.00%
eu 500539 - Nocsavilie Depot Ofice Roof Restoration a 6 o a 6 Ts 00 oo
s00843 500841 - Tewantn Admin Buliding Autornatic Transter Switch a o o 17,637 17,637 eso oo 3.73%
so0s4 500544 - Nocsavilie Depot OHS Compilance Works a o o 12,000 12,000 3.5068 oo 23.23%
so00sss 500852 - Tewantin Administration Bulicing Roof a 6 o $0,000 $0,000 o oo o0%
Total Corporate Buldings 180,000 208,820 148,420 148,617 148,617 0478 o 20T%
so07rrs SO07T4 - Tewantin Bost Ramp access upgrade a 154,000 154,000 148,903 148,103 153408 = 103.58%
Total Car Parks 0 164,000 164,000 148,103 148,103 163,408 o 103.68%
Environmental Asests, Bushland, Tracks and Tralee
SO0773 SO077T3 - Land Aquisition - Johns Landing a 2,117,187 2,417,187 2,117,487 2,117,187 2,118,506 oo 100.08%
Total Environmental Accets, Buchiand, Tracks and Traiic 0 2,117,187 2.417,187 2,117,187 2.117,187 2,118,206 o 100.08%
500519 500515 - Whole of Shire Gravel Resheeting - Annual Program 300,000 32455 362485 362,485 362,485 283,688 1b 73.25%
500841 ‘S007 SS - Hirtertand - Priority Safety Upgrade Grave! Road Sectons $00,000 $00,000 250,000 $00,000 $00,000 302,406 142,734 © 60.48%
Total Gravel Road Network 800,000 ($82,485 012485 (822,486 ($82,485 (686.084 142,784 27.86%
my
500030 500030 - Noosa River Holday Pk- intemal returb a o o a 6 160 oo 0.00%
500561 500661 - Noosa North Shore Campground Redevelopment 250,000 260,500 250,500 260,500 260,500 R417 2730 6.08%
S00562 - Nocsavilie, Noosa River Holiday Park Small Amenities Replace 600,000 600,000 800,000 601,304 601,304 s75.S17 445216 6.78%
Total Holiday Parks 1,050,000 1,080,600 1,080,500 (881,804 221,804 800.204 470,784 22.85%
100730 100730 - Gympie Terrace Park Fummure Renewal program a o o a o ss 5 1 1 3 33 17 2976 2082 64 18 20 o.00%
4 1 1 3 34 0 490 2108 2550 32 -1
5 1 1 3 34 1 490 2110 73 30 43 500551
5 1 1 3 34 2 649 2110 80 30 91 500551
5 1 1 3 34 3 736 2120 11 5 91 -
5 1 1 3 34 4 749 2110 63 30 72 Noosa
5 1 1 3 34 5 814 2110 105 30 31 Hinterland
5 1 1 3 34 6 924 2110 73 30 53 Priority
5 1 1 3 34 7 996 2110 113 30 55 Playground
5 1 1 3 34 8 1115 2120 9 5 92 -
5 1 1 3 34 9 1126 2110 88 30 77 Planning
5 1 1 3 34 10 1220 2114 16 17 93 &
5 1 1 3 34 11 1244 2110 68 30 41 Design
5 1 1 3 34 12 1656 2114 13 17 50 a
5 1 1 3 34 13 1788 2110 68 30 50 8442
5 1 1 3 34 14 2015 2110 66 30 53 18442
5 1 1 3 34 15 2231 2110 83 30 93 36,000
5 1 1 3 34 16 2414 2110 78 30 81 35,000
5 1 1 3 34 17 2598 2110 75 30 55 $4663
5 1 1 3 34 18 2853 2108 41 25 55 oo
5 1 1 3 34 19 2954 2114 86 17 38 184.81%
4 1 1 3 35 0 480 2138 2560 32 -1
5 1 1 3 35 1 480 2138 86 31 15 sooss4
5 1 1 3 35 2 657 2138 73 31 24 500554
5 1 1 3 35 3 737 2149 10 4 93 -
5 1 1 3 35 4 750 2138 79 31 69 Botanic
5 1 1 3 35 5 828 2138 78 31 95 Garden
5 1 1 3 35 6 905 2138 68 31 95 Shade
5 1 1 3 35 7 975 2138 68 31 96 House
5 1 1 3 35 8 1656 2142 13 18 53 a
5 1 1 3 35 9 1779 2138 73 32 84 18,343
5 1 1 3 35 10 2015 2138 67 32 40 18333
5 1 1 3 35 11 2239 2138 72 32 60 $0,000
5 1 1 3 35 12 2416 2138 78 32 89 $0,000
5 1 1 3 35 13 2599 2138 77 32 52 S738
5 1 1 3 35 14 2853 2140 44 24 8 oo
5 1 1 3 35 15 2965 2142 75 18 31 STS
4 1 1 3 36 0 483 2170 2557 30 -1
5 1 1 3 36 1 483 2170 85 30 16 s00542
5 1 1 3 36 2 655 2170 73 30 68 500527
5 1 1 3 36 3 737 2180 10 5 93 -
5 1 1 3 36 4 750 2170 50 30 92 Lake
5 1 1 3 36 5 802 2170 111 30 70 Macdonsid
5 1 1 3 36 6 912 2170 83 30 26 Sctanic
5 1 1 3 36 7 995 2170 85 30 95 Gardens
5 1 1 3 36 8 1082 2170 68 30 96 Shade
5 1 1 3 36 9 1152 2170 93 30 87 Structure
5 1 1 3 36 10 1247 2170 73 30 95 Design
5 1 1 3 36 11 1656 2174 13 17 58 a
5 1 1 3 36 12 1839 2174 13 17 56 6
5 1 1 3 36 13 2067 2174 15 17 73 o
5 1 1 3 36 14 2297 2174 14 17 66 a
5 1 1 3 36 15 2480 2174 14 17 50 6
5 1 1 3 36 16 2627 2170 50 30 78 403
5 1 1 3 36 17 2853 2172 36 24 6 oo
5 1 1 3 36 18 2976 2174 64 17 0 oo
4 1 1 3 37 0 477 2201 2563 32 -1
5 1 1 3 37 1 477 2201 92 31 26 S0086S
5 1 1 3 37 2 643 2201 86 32 43 S00566
5 1 1 3 37 3 737 2212 10 5 91 -
5 1 1 3 37 4 750 2201 107 32 79 Nocsavilie,
5 1 1 3 37 5 864 2201 70 32 38 Gympie
5 1 1 3 37 6 939 2201 83 32 93 Terrace
5 1 1 3 37 7 1022 2201 54 32 96 Park
5 1 1 3 37 8 1075 2201 91 32 0 Furniture
5 1 1 3 37 9 1166 2201 102 32 12 Renewals
5 1 1 3 37 10 1656 2205 13 18 79 a
5 1 1 3 37 11 1793 2201 60 31 46 5,000
5 1 1 3 37 12 2022 2201 63 31 71 5.000
5 1 1 3 37 13 2236 2201 78 31 89 20,000
5 1 1 3 37 14 2414 2201 84 31 69 20,000
5 1 1 3 37 15 2597 2201 79 31 57 32,062
5 1 1 3 37 16 2853 2203 43 25 46 oo
5 1 1 3 37 17 2955 2205 85 18 81 160.31%
3 1 1 4 0 0 1918 2288 283 44 -1
4 1 1 4 1 0 1918 2288 283 44 -1
5 1 1 4 1 1 1918 2288 105 44 96 Page
5 1 1 4 1 2 2041 2288 46 35 96 13
5 1 1 4 1 3 2103 2288 42 35 96 of
5 1 1 4 1 4 2159 2289 42 33 96 41Section 14
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 14 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 1¢-Jur2018 14.1206
S00567 500567 - Pomona, Skate Park Shade Sail 60,000 o o a o o oo 0.00%
s00s6s SO0566 - Sunshine Geach, Skate Part Refurbishment 200,000 211,008 400,368 403,258 403,355 401,065 oo 3.43%
S00720 500720 - Nocsavilie Gympie Terrace - Sarbers Thomas Memorial Garden a 6 a a o 308 70 1.00%
s00781 50071 - Cooran Pioneer Park upgrade - Design & Construction (inci 100,000 100,000 100,000 45,000 45,000 70,540 23736 156.76%
so07é2 50072 - Pomona Stan Topper Park Sollerd instaiiston 50,000 $0,000 35,000 36,000 35,000 33,030 76 S378
soo7s3 500783 - Lake Macdonald Botanic Gardens Master Pian 10,000 10,000 10,000 10,000 10,000 o oo 0.00%
500815 500615 - Pelican Seach Park Revetment Wall Renews! a 6 20,000 47,000 47,0 46052 oo 38.00%
s00821 500821 - BBQ renewals along Gympie Terrace a o 18,525 18,525 18,525 16,161 oo a7 me
Total Parke & Playgrounds £40,000 413,383 026.288 283,883 883,882 7121s 73,373 107.28%
500103 500103 - Cooroy Nooss Road Corridor improvement a o o a o a S 0.00%
500526 - Nocss Heads Part Road, Scardwak Design and consufaton a 6 o a 6 37,520 06 o00%
S00625 500514 - Tewantin Poincians Avenue Shared Path Upgrade Design & Const a o o a o a 70 0.00%
s00623 500515 - Nocsavilie Eenie Creek Road Of-Ramp to Underpass Design & a 6 o 18,000 18,000 o oo 0.00%
500616 - Whole of Shire - Noosa Pedestrian and Cycie Oats Counters a T3586 73,666 73,666 T3566 St 70,525 @ O73%
500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design a 103,553 103,659 103,659 103,653 56555 sree SS%
s00671 S007! - Noosa Heads, Park Road Scardwsk Construction 6,500,000 6,993,573 14655,3680 3.286,629 3285,629 1,552,060 5226,058@ aS
so0s72 500572 - Noosa Heads, Main Seach Boardaaik Construction $00,000 o 25.000 33,500 33,500 177281 12,1539 $529.20%
so0073s 500736 - Nocsavilie Wallace Part Patway Renesas 180,000 180,000 180,000 260,000 260,000 261728 oo 100.56%
S00740 500740 - Botanic Gardens Pathway Replacement a S327 S227 o 6 o oo o00%
S00807 SOOSCT - Blakesley Street Footpath Upgrade Stage 1 a 90,000 ‘90,000 63,338 63,338 T4856 od 118.20%
500817 500514 - Jacaranda Park, Tewantin - Pathway Renewal a 6 ‘0,000 $0,000 $0,000 56399 24% @ 267%
S00822 500822 - Pedestrian Bridge renews! at Alec Loveday Park, Tewantn a 6 22.000 3,000 3,000 345 6 196.50%
so00823 500623 - Boardwalk renewal st Gympie Tre, Noosaville a 6 31,000 31,000 4,000 20,033 oo ome
s00824 S00624 - Pathway renewal at Em St, Cooroy (train to school) a 6 13,000 13,000 13,000 WAT 220g 8.75%
soos2s S00825 - Pathway renewal at David Low Way -Castaways Beach a o 20,000 20,000 20,000 28,533 5030 142.55%
S00826 SO0E26 - Pathway renewal at Goodwin Street+-Tewantn a 6 24.000 24,000 0 22400 oo 33.33%
SOO827 S00827 - Pathway renewal at Pactic Av - Sunshine Seach a 6 $.coo $3,000 3,000 7.715 oo 85.72%
SO0E26 - Pathway renewal st Gympie Terrace a 6 93,683 33,883 $3,883 6148 £0,000 © 655%
SOos2S 500828 - Pathway renewal at James St, Noosaville a o 25.000 25,000 25,000 13.203 oo 2.81%
500830 ‘S00630 - Noosaville, William Street Smared Zone Footpath a 6 6.coc 6,000 6,000 o 706 o00%
500831 500631 - Tewantn Diyan Street New Footpath a 6 11,300 11,300 11,300 o 06 o00%
Total Pathways & Boardwalk 7,180,000 7 448,225 2202216 4183,876 4,163,875 2,320,202 654,078 72%
Public Transport infrastructure
s00312 500528 - Whole of Shire Bus Sheer Disabled Compliant Program 600,000 600,000 ‘600,000 600,000 600,000 621,140 13,230 103.52%
soo7o2 SO07TG2 - Nocsavilie, Lake Weyba Orive Sus Turnaround a 137,547 137.587 215,000 215,000 214210 oo 39.53%
Total Publ Trancport Intractructure 809,000 737 847 737,047 $16,000 216,000 836.250 128,208 102.60%
500530 - Whole of Shire Reseai & Rehabilitation Program 3,000,000 2468,535 2463,536 2.468,536 2,468,536 2.352457 — BSI
500531 500531 - Whole of Stire Pavement surveys and investigations 2015/2016 a 6 o a 6 eo oo 000%
500515 - Black Mountain Fid Landsip a 204,188 215,188 250,000 (250,000 251,332 13370 100.77%
s00741 500741 - Nocsavile - Mary Street toopath, roadworks & drainage impr a 6 o a 6 1200 oo o00%
SO0747 SO0747 - Sunrise Road Cycie Lanes Design a o o a o 20,742 oo 0.00%
s00840 SO07S7 - Black Mountain - Road Priority Sections and Fioad Reconstruct 510,000 510,000 245,000 $0,000 $0,000 115,137 Bg 17.53%
Ssoo762 SOOTE2 - Emergent Works - Lake Weybe Rd Noosaville a 6 o 45,136 45,135 45135 oo 100.00%
Page 14 of 41Section 15
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 15 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 10-Jur-2018 14.1206
s00806 500806 - Weybe Road Corridor improvements a 1,700,000 1,700,000 1,700,000 1,700,000 1423331 so 83.73%
so0sos 500808 - Middle Creek Road Signage Upgrade a 17,500 17,500 ‘7,000 7,000 7.766 70° 190. 34%
S00837 500637 - Eumund Rid, Gibson Rd, Hifon Tce, Gympie Tce Roundabout res a o 236775 236,775 236,775 204.054 r7ss® 86.18%
S00845 500845 - Peregian Seach, Oavic Low Way Guardral Renewal a o o 75,000 ‘75,000 1438 13,8106 245%
Ssoos47 500547 - Sunshine Beach Resurfacing Preparation Works a o o 155,400 155,400 o 70 0.00%
soosss 500853 - Cooroy Bell Creek Road Silp (Ex TC Debtie Setierment Ciaim) a o o 38,000 $9,000 3,100 oo 3.13%
Total Sealed Roads Network 3,610,000 4,901,224 4,883,908 6.127,847 6.127.847 4,428,203 4242,203 2.23%
‘Sports Ground anc Fact
soo7ss 500745 - Tewantin, Sports Complex Stage 1 Carpark a 12,000 12,000 44,000 44,000 43,765 oo 39.47%
Total Sports Grounc anc Facilities o 12,000 12,000 44,000 (44,000 S376 o 2.47%
sooass 500058 - Re-ining of Ben Lexcen stormester a o o a o sos a ; 0.00%
s00050 500060 - Whole of Shire - stormwater structures a 69,619 69,619 68,619 65,619 17,311 oo STR
so0s34 500534 - Whole of Stire Stormwater Pit Structure renewal program a o o a 6 $332 oo 0.00%
s00674 500574 - Cootharaba, Kinmond Creek Road Sandy Creek Culvert a o 2,005,000 2,005,000 2,005,000 1,954221 3,358 STATS
soos7s SO057E - Nocsavilie, Thomas Sreet & Gympie Terrace Culverts a o 74950 174,850 174,350 181s oo 104.00%
soos77 500577 - Whole of shire, Bloretenton/Water Sensitve Urban Design a 80,000 80.000 32,000 32,000 23,530 oo 93.53%
so074s 500748 - Str Mile Creek Ficod Monoring System 176,000 287,545 225545 225,545 Ds. S45 207,705 0 2.05%
s00816 50013 - Orient Drive, Sunrise Beach - Silp Repair a o 355,000 ‘$0,000 30,000 85,756 5,[email protected]%
s$00832 500832 - Nooss Heads, Leslie Drive Stormwater Mannoies a o 40,000 $0,009 $0,000 52,931 06 132.33%
s00833 500833 - Drainage works for renewal of kerb, channe! and pits at Coat a o 78120 76,120 78,120 S545 26,031 6 190.12%
s00834 500534 - Renewal of catcmp® tops at Sunshine Beach a o 111,000 111,000 111,000 100,631 123,210 ‘S0.66%
so0083s 500835 - Renewal of various stormwater stuctures across the shire a o 140,500 140,500 140,500 2151 oo 15%
s00836 500836 - Drainage renewal works at Weyds Fid, Nocsavilie a o 68.000 68,000 68,000 tz oo 1%
Total Stormwater Drainage 178,000 407,184 ‘3,347,734 3,034,734 3.034,74 (2,783,668 168,380 1.72%
soo703 500703 - Whole of Stire, Steet Lighting Frogram a (20,000 20,000 20,000 (20,000 214351 a 107 46%
Total Streetcoapes and Road Corridors o 20,000 20,000 20,000 20,000 21401 o 107.48%
500536 - Tewantin Coorsy Noosa Rd Traffic Management Construction - A. 800,000 1,150,000 1,150,000 1,150,000 1,150,000 1,905,696 —_ 36.50%
$00300 500546 - Whole of Shire Forward Planning & Design Program - Construct 300,000 300,000 150,000 225,000 225,000 238,373 57,856 () 105.35%
00515 S00E01 - Nocsavilie Eenie Cx Pattway signage stage 2 a 82430 82430 22,430 82430 08442 1° 132.77%
soos7s ‘500578 - Castaways Seach, David Low Way Satety and Comdor Improveme a 40,495 40485 €,000 6,000 13,871 32,7200 231.18%
soos7s S0067S - Tewantn, Hilton Terrace & Emest Street intersection 800,000 366,611 300,000 435,750 436,750 677,025 636,562 155.01%
s00560 500580 - Tewantin, Cooroy Noosa Road improvements, Stage 4 a 14,550 14,680 21,327 21,327 21327 70 100.00%
soo70s SOOTUS - Tewantn, Poinciana Avenue & Mooring Street intersection $0C,003 $00,000 742,536 1,055,752 1,055,752 1,013,333 12,067 © 36.55%
so0706 SO0706 - Pomona, Station Road Car Parking and Safety improvements a 36,053 310,758 310,753 390,753 170,338 51,0736 81%
soo7o7 SOO7TOT - Whole of Shire, Significant Local Roads Directional Signage, a 38,343 33,383 33,343 33,343 30553 70 T74T%
soo70s ‘500708 - Sunshine Beach Pacific Ave/Sunshine Seach ro Minor intersect a o o a 6 256 oo 0.00%
Total Trancport and Infractruoture Management 2,200,000 3,628,622 2,830.863 3,327,961 3,327,881 (3,380.828 902,283 101.88%
‘Weaete Management
Page 15 of 41Section 16
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 16 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 16-Jur2018 14.1206
S00057 SOO067 - Nocsavilie Lanctl - sediment control a 6 o a 6 2 o0o 0.00%
Sso07Ts7 SOOTST - Nocsavilie Eumund! Road landfill Upgrade Erte Side tacity 60,000 60,000 0.000 60,000 60,000 35,388 227720 58.98%
Soares SO0788 - Nocsavilie Eurund! Road andfll New Shed 54,000 54,000 54000 34,000 $4,000 277m 6.7016 51.30%
so00s8s2 00887 - Eumund Aid Landi - RRA carpark reseal a 6 o a o 3772 23.286 0.00%
Total Wacte Management 114,000 114,000 114,000 114,000 114,000 T2880 78,267 ank
‘Aaset Manage
s006e5 SO0565 - Whole of Shire, Pavement System and Analysis for Reseal Prog a 8740 e740 8.740 e740 11,558 19° 13225%
SO006S7 SO0567 - Whole of Stire, CCTV Orsinage Program 170,000 170,000 170,000 170,000 170,000 M122 ass 112.49%
so0710 SOOT 10 - Whole of Shire, Tt Asset Systems Mobily Rollout & Hardware 100,000 148,823 “3228 148,829 148,823 52278 06 BS
soo7s3 500753 - Carbon Reduction Pian (Bulidings & Facilities) 250,000 265,552 265,652 265,652 265,552 131,437 145,455 © 45.45%
sog7Tso SOOTSO - Tewantin Administration Buliding Ar Handing Unt repiaceme 36,000 35,000 5.000 5,000 §,000 oc oo 0.00%
soorss SO0TS6 - Zero Emissions priorty minor projects 50,000 50,000 50,000 $0,000 $0,000 28,656 5,400 @ S7 40%
Total Accet Management e000. ereani—~—~C~SmSSC~*~*~*~ ~*~ CSCC SC
‘Fleet - Pant Resptacemert
so00s1s 500516 - Plant and Fleet Replacement Program 1,450,000 1,450,000 1,568,087 1,736,087 1,738,087 72s 615,167 @ 45%
Total Fleet - Plant Replacement 1,450,000 1,460,000 1,688,087 1,738,087 1,738,087 T2864 18,187 445%
s00541 500541 - Whole of Shire Mobile Mapping Stage 2 - Hardware & Configurs a 6 o a 6 21677 5 coo%
so0s42 500542 - Implementagon of Ci Anywhere Functionality for TechnologyOn 250,000 396,933 396.333 396,933 396,333 271447 2,005 © 68.35%
soori3 S007 13 - Whole of Shire, Wireless enable Council Sulidings a 6 o a 6 13,086 o0o 0.00%
soo77s SO077S8 - Nocss Heads The J renewal of AV system Year 2 of 3 30,000 30,000 30,000 30,000 30,000 234s oo 39.45%
Total information Technology 280,000 42833 426803 (428,833 2208) 208.873 56,808 72.68%
S00080 ‘SO0080 - Standards Review - Standard Drawings a 6 o a 6 7 7 0.00%
s00107 500107 - Noosa River Hydraulic Mode! a 40,110 40,110 40,110 40,110 5200 oo 12.36%
sooria 500714 - Whole of Shire, Camate Change Adaptation Strategy 415,000 415,000 415,000 415,000 415,000 203,356 216,710 43.15%
soorié S007 16 - Whole of Shire, Project Team Resources for New Planning Sche $15,000 $15,000 815,000 $78,000 978,000 1,012,560 23020 103.53%
soori7 SOOT 17 - Siu Mile Creek Ficod Study a 196,063 70,380 70,380 70,380 $9,956 oo 39.40%
Total Planning Soheme Expancion 1,230,000 1,388,173 1,340,430 1,603,480 1,603,480 1,281,888 237,812 sak
Grand Total 24,055,500 0,363,713 26,573,338 30,333,428 0,338,426 25,752,382 16,854,858 83.24%
Page 16 of 41Section 17
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 17 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 1-Jub2018 141206
Capital Works Program
YTD Actual Expenditure $25,752,982
Remaining Capital Expenciture $5,136,466
Full Year Budgeted Expenditure $30,939,428
Remaining Capital
a>
boendtre
1heN
Espendture
| a3.24%
Page 17 of 41Section 18
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
7 FINANCIAL PERFORMANCE REPORT - JUNE 2018 INTERIM
DOCUMENT INFORM AT ION
Author Manager Financial Services, Trent Grauf
Corporate Services Department
Index ECM/ Subject/ 22.09 – Monthly Financial Performance Report
Attachments 1. Statement of Income and Expenditure (Profit & Loss and Capital)
2. Statement of Financial Position
3. Statement of Cash Flows
EXECUTIVE SUMMARY
Financial performance for the 2017/18 financial year compared to current budget has resulted in
a strong interim operating surplus of $5.8 million (budget $2k), capital revenues of $7.3 million
(budget $8.2 million) and capital expenditure of $25.8 million (budget $30.9 million). Note that
year-end financial adjustments are still in progress, with a further report on final 2017/18 financial
performance to be provided to Council following finalisation of the annual report and financial
statements.
Interim Full Year Financial Performance Summary
Budget Actual Variance Variance Status
$m $m $m %
Operating Revenue $93.2 $96.0 $2.8 3.1% Above Budget
Operating Expense $93.2 $90.2 $3.0 3.2% Below Budget
Operating Position $0.0 $5.8 $5.8
Capital Revenue $8.2 $7.3 $0.9 10.8% Below Budget
Capital Expenditure* $30.9 $25.8 $5.2 16.8% Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)
Financial statements including Statement of Operating Profit & Loss, Summary of Capital
Financial Performance, Statement of Financial Position (balance sheet), and Statement of Cash
Flows are included as attachments for information of Council.
Figure 1: Actual Interim Operating Financial Performance
$120
YTD Budget ($m)
$100
YTD Actual ($m)
$80
$60
$40
$20
$-
Operating Revenue Operating Expenditure
Page 18 of 41
Section 19
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
RECOMMENDATION
That Council note the report by the Manager Financial Services to the Ordinary Meeting dated 16
July 2018 providing results of interim 2017/18 financial performance against budget.
REPORT
Operating Position
Council’s Financial Sustainability Policy requires that an operating surplus be maintained each
year over the life of Council’s ten-year financial plan. An operating surplus is achieved when
operating revenues are greater than operating expenses. An operating surplus means that the
community’s financial capital does not degrade and that sufficient funds are being collected to
fund both business as usual operations and existing asset maintenance and replacement.
Council adopts a conservative approach to forecasting its budget to ensure that any unexpected
financial expenditure shocks during the year can be absorbed. This approach is evident with the
interim operating surplus of $5.8 million compared to current budget of $2k. This surplus will
likely reduce once year-end expenditure accruals are recognised.
Operating Revenue (Benchmark 100%)
Council has received 103% ($96.1 million) of its operating revenue budget ($93.2 million).
Commentary on each revenue category is provided below.
Category Summary Comments
Rates and $64.0 million (100%) of the Rates and levies achieved budget
Levies annual budget of $64.0
million has been earned
Fees and $6.1 million (113%) of the Development related fees $234k above budget
Charges $5.4 million annual budget (118% or $1.5m of $1.3m budget earned)
has been earned Building and plumbing application and search fees
$162k above budget (111% or $1.6m of $1.5m
budget earned)
Local laws fees $135k above budget (114% or
$1.1m of $981k budget earned)
Community land use applications and permits $84k
above budget (123% or $448k of $364k budget
earned)
Public health licences and infringements $22k
above budget (107% or $350k of $328k budget
earned)
Property related search and change of ownership
fees $19k above budget (105% or $364k of $344
budget earned)
Sale of Goods $9.3 million (106%) of the Landfill disposal charges $259k above budget
and Services $8.8 million budget has been (109% or $3.1m of $2.8m budget earned)
received Noosa Aquatic Centre $97k above budget (106%
or $1.8m of $1.7m budget earned)
The J $57k above budget (115% or $432k of the
$375k budget earned)
Noosa Leisure Centre $37k above budget (107%
or $564k of the $527k budget earned)
Holiday parks $59k above budget (102% or $3.2m
of $3.2m budget earned)
Page 19 of 41
Section 20
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Category Summary Comments
Interest $4.7 million (103%) of the Investment revenue $111k above budget (101% or
Received $4.6 million annual budget $1.6m of $1.5m budget earned)
has been earned Interest on overdue rates $43k above budget
(109% or $493k of $450k budget earned)
Dividend and $3.0 million (100%) of the Nil
Tax $3.0 million annual budget
has been earned
Other $2.6 million (104%) of the The J revenue (staff recoveries, booking
Revenue $2.5 million budget has been commissions) $85k above budget (171% or $207k
earned of $121k budget earned)
Lease management income (primarily
telecommunication leasing) $27k above budget
(103% or $1.1m of $1.0 million budget earned)
Civil operations internal recoveries $112k above
budget (112% or $1.1m of $941k budget earned)
Waste management internal recoveries $96k
above budget (113% or $833k of $736k budget
earned)
Fleet management internal recoveries $60k above
budget (102% or $3.2m of $3.1m budget earned)
Operating $6.0 million (125%) of the 50% of the 2018/19 Financial Assistance Grant
Grants, $4.8 million budget has been ($1.1m) was paid in advance in June 2018.
Subsidies received
Figure 2: Operating Revenue Position by Type (Excluding Rates)
$10.0
YTD Budget ($m)
$9.0
YTD Actual ($m)
$8.0
$7.0
$6.0
$5.0
$4.0
$3.0
$2.0
$1.0
$0.0
Other
Income
Charges
Goods &
Grants
Dividend
Services
Sales of
Rental
Interest
Fees &
& Tax
Page 20 of 41
Section 21
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Operating Expenditure (Benchmark 100%)
Actual operating expenditure is 97% ($90.2 million) of full year budget ($93.2 million). Detailed
commentary for each expenditure category is provided below.
Category Summary Comments
Employee $30.1 million (99%) of the Under expenditure for permanent staff salaries and
Costs annual budget of $30.4 wages ($1.0m) offset by additional spend on
million has been expended casual staff ($567k) and external labour hire
($374k)
Staff training underspend of $82k (71% or $203k of
$286k budget expended)
Materials and $39.0 million (94%) of the Expenditure of constrained levy funds $1.7m under
Services $41.7 million annual budget budget (Tourism and Economic, Noosa Waters,
has been expended. Noosa Junction, Hastings Street, Environment and
Sustainable Transport levies). Environment levy
funds were utilised for capital purposes for the
purchase of the Johns Landing site.
Waste management $544k below budget (93% or
$7.5m of $8.1m budget spent)
ICT maintenance, licences and telecommunication
charges $394k below budget (88% or $2.9m or
$3.3m budget spent)
Community Development $174k below budget
(87% or $1.1m of $1.3m budget spent)
Environmental Services $140k below budget (83%
or $664k of $804k budget spent)
Libraries and Galleries $81k below budget (95% or
$1.6m of $1.7m budget spent)
Fleet and Plant $83k below budget (96% or $2.3m
of $2.4m budget spent)
Holiday parks $74k above budget (106% or $1.4m
of $1.3m budget spent) ) – offset by increased
revenue
Community facilities operating costs $146k above
budget (107% or $2.3m of $2.2m budget spent) –
offset by increased revenue
Parks mowing and landscaping $159k above
budget (104% or $4.5m of $4.3m budget spent)
Development Assessment appeal costs $481k
above budget (151% or $1.4m of $0.9m budget
spent) partly offset by additional development
revenue
Finance Costs $2.4 million (100%) of the Nil
annual budget of $2.4 million
has been expended
Depreciation On track however road and Final year reporting will include revaluation and
bridge asset revaluations capitalisation impacts on depreciation
may have impacts
Other $158k (116%) of the annual Emergency Management Fire and Rescue Levy
Expenses budget of $136k has been charges above budget
expended
Page 21 of 41
Section 22
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Figure 3: Operating Expenditure Position by Type
$45
YTD Budget ($m)
$40
YTD Actual ($m)
$35
$30
$25
$20
$15
$10
$5
$0
Finance Costs
Materials
Depreciation
Employees
Other
Capital Revenue
Capital revenue of $7.3 million received during the year comprises capital grants for
infrastructure projects ($4.4m), cash contributions from developers ($1.9m) as well as contributed
assets from developers ($1.0m). Contributed asset revenue will increase and exceed the $2
million budget estimate once asset capitalisation is finalised as part of end of financial year
processing.
Figure 4: Capital Revenue by Type
$5.0
YTD Budget ($m)
$4.5
YTD Actual ($m)
$4.0
$3.5
$3.0
$2.5
$2.0
$1.5
$1.0
$0.5
$0.0
Contributed assets
Cash contributions
Grants / subsidies
Capital Program
Actual capital expenditure (excluding commitments) is $25.8 million (budget $30.9 million). Total
actual capital expenditure will increase once expenditure accruals are finalised as part of end of
financial year processing.
Page 22 of 41
Section 23
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Figure 5: Capital Program Delivery Performance
$30.0
YTD Budget ($m)
YTD Actual ($m)
$25.0
$20.0
$15.0
$10.0
$5.0
$0.0
Capital works Other capital
Cash Management and Investment Performance
Total cash at the end of June was $68 million, comprising $64 million operational funds held at
bank and $3 million in trust. Included in the operational bank balance are funds constrained for
restricted purposes (e.g. unexpended levy and grant funds) and unspent monies committed for
funding capital projects which are underway and will likely carryover into the 2018/19 financial
year.
The pie charts following present the mix of cash held at June 2018 by agency (graph on the left)
and by credit risk rating (graph on the right). The investment mix complies with Council’s
investment policy.
Figure 6: Closing Cash Held by Agency and Credit Rating
Bendigo A3
6% (Bendigo)
NAB 6%
3% A1 +
CBA (CBA + NAB +
10% Wpac)…
A1 +
QTC (QTC)
81% 81%
The following chart presents the annual trend on total cash and the agencies invested. During
June, $4 million in commercial term deposits matured and $4 million was drawn down from QTC
cash deposits. These funds were utilised during June to fund operating costs and capital
projects.
Page 23 of 41
Section 24
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Figure 7: Annual Trend of Cash Invested by Agency
100,000,000.00
90,000,000.00
80,000,000.00
70,000,000.00
60,000,000.00
50,000,000.00
40,000,000.00
30,000,000.00
20,000,000.00
10,000,000.00
-
Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18
QTC Bendigo Westpac NAB Suncorp CBA
Actual interest revenue for June was $132k with a weighted average yield of 2.3%, which reflects
a positive return compared to the industry benchmark (Bloomberg AusBond Bank Bill Index) of
1.8%.
Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Page 24 of 41
Section 25
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Departments/Sections Consulted:
x Chief Executive Officer x Community Services x Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
x Executive Services x Environment & Sustainable Development x Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 25 of 41
Section 26
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 26 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Noosa Council
Statement of Income and Expenditure
For the Year Ended 30 June 2018
As at 30 June 2018
Current Budget Actual (Interim) Variance Annual
2018 2018 2018 Budget
($'000) ($000) ($000) %
Profit and Loss Statement
Revenue
Recurrent Revenue
Rates, levies and charges 63,988 63,978 (9) 100%
Fees and charges 5,441 6,130 689 113%
Dividend income 1,860 1,860 - 100%
Interest received 4,588 4,741 153 103%
Tax equivalents 1,200 1,200 - 100%
Sale of Goods and major services 8,733 9,238 506 106%
Sale of contract and recoverable works 33 34 1 103%
Rental & lease income 1,322 1,358 36 103%
Other income 1,210 1,489 279 123%
Grants, subsidies, contributions and donations 4,832 6,033 1,201 125%
93,206 96,061 2,855 103%
Expenses
Recurrent Expenses
Employee benefits 30,408 30,121 (287) 99%
Materials and services 41,669 38,962 (2,706) 94%
Finance costs 2,414 2,404 (10) 100%
Depreciation and amortisation 18,577 18,577 - 100%
Other expenses 136 158 22 116%
93,204 90,222 (2,982) 97%
Operating Result 2 5,839 5,837
Summary of Capital Revenue and Expenditure
Capital Revenue
Capital contributions and donations 3,867 2,954 (913) 76%
Grants, subsidies, contributions and donations 4,375 4,397 22 100%
Other capital revenue - - -
Total Capital Revenue 8,242 7,351 (892)
Capital Expenditure
Contributed assets 2,000 1,012 (988) 51%
Constructed assets 30,939 25,753 (5,186) 83%
Other capital expenses - 387 387
Total Capital Expenditure 32,939 27,151 (5,788)
Page 26 of 41Section 27
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 27 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Noosa Council
Statement of Financial Position
For the Year Ended 30 June 2018
As at 30 June 2018
Current Budget Actual (Interim) Actual
2018 2018 2017
($'000) ($'000) ($'000)
Current Assets
Cash and cash equivalents 51,236 64,229 65,463
Trade and other receivables 8,633 6,944 7,101
Inventories 330 326 330
Other current assets 479 4117 2,796
60,678 75,615 75,690
Non Current Assets held for sale - - -
Total Current Assets 60,678 75,615 75,690
Non Current Assets
Trade and other receivables 49,218 49,218 49,218
Other non current Assets - - -
Investments 73,332 60,978 60,978
Investment property 4,405 4,405 4,405
Property, plant and equipment 948,173 910,464 913,152
Intangible assets 5,214 4,862 3,497
Total Non Current Assets 1,080,343 1,029,927 1,031,249
Total Assets 1,141,021 1,105,542 1,106,939
Current Liabilities
Trade and other payables 4,619 9,791 11,819
Borrowings 3,277 1,849 3,745
Provisions 4,178 2,559 4076
Other 655 757 645
Total Current Liabilities 12,728 14,957 20,285
Non Current Liabilities
Trade and other payables - - -
Borrowings 32,938 34,291 34,291
Provisions 10,077 9,879 9,843
Total Non Current Liabilities 43,015 44,169 44,133
Total Liabilities 55,743 59,126 64,418
Net Community Assets 1,085,277 1,046,417 1,042,521
Community Equity
Asset Revaluation Surplus 46 269 41,739 26,892
Retained Surplus / (Defeciency) - - -
Shire Capital 1,036,008 991,874 1,000,677
Current Year Net Earnings - 12,804 14,951
Total Community Equity 1,082,277 1,046,417 1,042,521
Page 27 of 41Section 28
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 28 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Noosa Council
Statement of Cash Flows
For the Year Ended 30 June 2018
As at 30 June 2018
Current Budget Actual (Interim) Actual
2018 2018 2017
($'000) ($'000) ($'000)
Cash flows from operating activities
Cash Flows from Operating Activities
Receipts from Customers 80,155 84,501 81,498
Payments to Suppliers and Employees (79,590) (77,571) (67,789)
565 6,930 13,709
Receipts:
Investment and Interest Revenue Received 4,588 4,741 4,831
Rental Income 1,332 1,358 1,337
Non Capital Grants and Contributions 4,868 6,033 6,287
Income Tax Equivalent Received 1,200 1,200 1,456
Income from Equity Investments 1,860 1,860 1,568
Payments:
Borrowing Costs - - -
Interest Expense (11) (142) (122)
Net Cash Inflow/(Outflow) from Operating Activities 14,402 21,980 29,066
Cash Flows from Investing Activities
Receipts:
Proceeds of Sale of Property, Plant and Equipment 10 154 259
Grants, Subsidies, Contributions and Donations 6,242 7,351 6,314
Payments:
Payments of Property, Plant and Equipment (28,748) (24,881) (19,317)
Payments for Intangible Assets (2,191) (1,839) (1,176)
Net Cash Inflow/(Outflow) from Investing Activities (24,687) (19,215) (13,920)
Cash Flows from Financing Activities
Receipts:
Proceeds from Borrowings 1,225 1,165 2,697
Payments:
Repayment of Borrowings (5,167) (5,164) (4,966)
Net Cash Inflow/(Outflow) from Financing Activities (3,942) (3,999) (2,269)
Net Increase/(Decrease) in Cash and Cash Equivalents held (14,227) (1,234) 12,877
Cash and Cash Equivalents at the beginning of the reporting period 65,463 65,463 52,586
Cash and Cash Equivalents at the end of the reporting period 51,236 64,229 65,463
Page 28 of 41Section 29
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
8 YEAR IN REVIEW 2017-18
DOCUMENT INFORM AT ION
Author Chief Executive Officer, Brett de Chastel
CEO’s Office
Index ECM/ Subject/ Corporate Planning
Attachments Nil
EXECUTIVE SUMMARY
This report details key issues that Council has dealt with during the 2017/18 financial year in the
context of our five Corporate Plan themes. It would be an understatement to note that the last 12
months has been busy and productive. The scale, scope and diversity of subject matter
addressed by Council during the last 12 months speaks for itself.
Council could not have achieved so much without the effort of our staff who have gone “above
and beyond” to deliver services to our community and I would like to take the opportunity to
recognise the great work by our Mayor, Councillors and our incredible staff during 2017/18.
RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 16 July 2018 providing a review of Council’s progress in the 2017/18 financial year towards
achieving the five key focus areas set out in Council’s Corporate Plan.
REPORT
Pursuant to the Local Government Act, the CEO is required to provide Council with an annual
report identifying the progress made towards the achievement of Council’s long term objectives
as set out in the Corporate Plan. Even if this was not a statutory requirement, it would still be a
useful process to review progress in a financial year. This report covers the 2017/18 financial
year.
This report is designed to look at longer term progress at a Corporate Plan level. It provides an
opportunity to pause from the day to day minutia and to consider what we have achieved in the
last 12 months as we work towards our vision.
As Council would be aware, our current Corporate Plan was adopted in early 2017 following a
significant process to develop our long term vision, 20 year goals and 5-year key focus areas.
We have operated under that Corporate Plan for the 2017/18 financial year. (We are currently
working through a process to update our Corporate Plan with the Plan currently available for
community input via Your Say Noosa).
The Corporate Plan sets out five key themes, namely:
1. The Noosa Environment
2. The Noosa Community
3. The Noosa Economy
4. Long-Term Planning for Noosa Shire
5. Excellence as a Council
This review of the last 12 months will be made against these five themes.
Page 29 of 41
Section 30
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Top 10 Highlights of 2017/18
(in no particular order)
1. Finalising the drafting of the new Noosa Planning Scheme for the State
interest check stage
2. Acquisition of Johns Landing at Cooroibah and assisting more than 90
people to find alternative accommodation via the Noosa Community
Roundtable process involving a range of local community groups and State
Departments
3. Finalising the Noosaville Foreshore Land Use Master Plan process
following an extensive community consultation
4. Finalising negotiations on the Yurol/Ringtail Conservation project to provide
an additional 2,400 ha to be added to the environment estate over the next
10 years providing regional scale koala corridors
5. Record capital works delivery of approximately $28M
6. Rollout of new green bins in September 2017 as part of the new Waste
contract
7. Receiving a bronze award for our WH&S performance following an
independent audit of our WH&S systems
8. Finalisation of Certified Agreement negotiations with unions which will result
in a new Noosa Council Certified Agreement which finalises the last of our
de-amalgamation issues.
9. Completion of the Peregian Beach Digital Hub with the first tenants now
located onsite.
10. Commencement of the Sustainable Tourism Stakeholder Reference Group
1 2017/18 – A YEAR IN REVIEW
Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected, enhanced and valued by the community”
Key achievements as we work towards our long term goal include:
Council reviewed its management approach to the Noosa River and has committed to refresh
and rewrite the Noosa River Plan with an expanded focus on river catchment management.
The revised Noosa River Plan is almost ready for community consultation.
Council signed a Memorandum of Understanding in October 2017 with the State
Government, HQPlantations and the Noosa Parks Association for the development of a
project to protect major parts of the Yurol and Ringtail forest areas. Council agreed to the
final format of the contracts in June 2018. This is the most significant environmental project
in recent years and will see almost 2,400 ha of land transition to protected conservation
tenure over the next 10 years providing regional scale environmental connectivity, particularly
for koala corridors.
Council completed its audit of stormwater pollution in the Noosaville Industrial Estate and is
working closely with local businesses to improve environmental management practices in that
area.
Page 30 of 41
Section 31
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Council provided ongoing support to the Boomerang Alliance in their campaign for a Plastic
Free Noosa.
Staff are currently working to develop a suite of management plans for bushland reserve
areas within the Shire. Approximately 30 plans were completed in the last 12 months and the
Council also adopted a comprehensive set of Community Bushcare Operational Guidelines in
April 2018. Council also finalised its policy on the management / removal of Trees on Public
Land.
Council is implementing its Zero Emissions Strategy focused on achieving net zero emissions
by 2026. This was a major initiative of Mayor Wellington and Council considered a report by
ERM in relation to the energy use of nine of Council’s largest energy producing sites.
Contracts were let for the installation of solar panels at most of the major Council buildings at
a cost of approximately $250,000. This will reduce both Council’s emissions and also our
ongoing electricity costs.
Council’s new waste management contract
commenced in September 2017. This new
contract (awarded to Cleanaway for the
period 2017 - 2024 at an approximate cost
of $46 million) is the largest contract the
Council manages. The introduction of a
mandated green waste recycling bin in
urban areas of the Shire was seamless.
This will reduce green waste being buried in
the landfill, thus significantly reducing
methane gas was a smooth process with
significant communication with our
community to ensure that service delivery.
Council has also successfully negotiated for
the ongoing processing and sale of our
recyclable waste following the 2017 decision of the Chinese government to discontinue taking
Australian recyclable materials. At the same time, we have responded to the announcement
by the State government to introduce a $70 per tonne landfill levy from early 2019.
Council is continuing the development of a Climate Hazard Adaption Plan. This project (being
funded by the State via LGAQ) is aiming to develop both a Climate Hazard Adaption Plan
and a Climate Change Adaption Plan. Research and community engagement has been
undertaken in 2017/18 for the CHAP.
Work on our Waste Reduction and Recycling Plan has continued in 2017/18. This included
significant media coverage and school education sessions.
Council awarded tenders in September 2017 for the ongoing environmental monitoring of
Council owned landfills including both current and closed landfills. This ensures that Council
meets its environmental obligations in relation to its landfills (both current and closed).
Council issued a new 7-year licence to operate the Recycling and Sales Facility at the
Eumundi Road Resource Recovery Facility to Resource Recovery Australia. This decision
saw the closure of the Brightside Tip Shop and the launch of Noosa Reviva on 3 July 2018.
Council approved a further 3-year funding agreement with the Noosa Biosphere Reserve
Foundation in June 2018. During 2017/18, Council also provided $250,000 to the Noosa
Biosphere Reserve Foundation for projects that advance the purpose of the Noosa Biosphere
Reserve as well as $140,000 for operational expenses (in accordance with the funding
agreement in place until 30 June 2018).
Council has addressed a range of significant planning and environment applications during
the last 12 months. During that period, Council approved 98.5% of planning applications.
Page 31 of 41
Section 32
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Some of the more interesting applications considered by Council during 2017/18 included:
o Refusal of a request for an extension of time for an old approval on Hollett Road,
Noosaville;
o Approval of the redevelopment of the Noosa RSL building;
o Signage issues on storage businesses in the Noosaville industrial estate;
o Approval of the redevelopment of the commercial shops on Hilton Terrace, Noosaville;
o Approval of ‘Orange on Sunrise’ at Tinbeerwah; and
o Approval of a home based business at Cooroibah.
Council had success in the Planning and Environment Court. The appeal for the Retirement
Village at Eenie Creek Road was withdrawn, the appeal over the deck at Noosa Harbour was
settled, the home business swim school at Noosaville withdrew their appeal, we were
successful with the infrastructure charges appeal at Lake Macdonald and we are substantially
through the hearing of the Peregian Beach development proposed by Thomco.
Council commenced a study via CSIRO’s Data61 research unit to undertake research into
the concept of an Institute of Sustainability for Noosa. The report is expected to be finalised
soon.
Council adopted a policy to oppose any further applications for coal exploration, coal mining,
coal seam gas exploration or coal seam gas production within the Shire. This is in keeping
with Council’s environmental stance.
Corporate Plan Theme 2: The Noosa Community
“Our community is connected, safe and happy and able to meet their potential”
Key achievements as we work towards our long term goal include:
Council finalised the settlement of the purchase of Johns Landing at Cooroibah. This was
one of the most significant projects of 2017/18. More than 90 people were re-housed through
the work of the Noosa Community Roundtable. Rehabilitation of the land (partly purchased
with the Environment Levy) has commenced with the removal of a significant amount of
rubbish and contamination.
Council adopted a three-year implementation plan for the Noosa Social Strategy. This
includes an annual update to Council on progress for implementation of the Noosa Social
Strategy. Included within the Social Strategy is the establishment of the Noosa Community
Roundtable which successfully assisted with the transition process at Johns Landing and is
now focusing on affordable housing.
Council adopted a Sport and Active Recreation Plan following extensive community
engagement. That Plan will help guide Council in managing community facilities and
programs associated with both active and passive sports.
An implementation plan was adopted by Council in
February 2018.
Council has commenced the development of a Community
Health and Wellbeing Plan. This process commenced in
March 2018 with the establishment of a Reference Group
and will be completed during 2018/19.
Work is also progressing well on Noosa’s Cultural Plan.
The Consultative Committee has finalised a draft Plan
which is currently available for community consultation.
The Queen’s Baton Relay event was held in Noosa on 26
March 2018. With over 35 baton bearers and thousands of
residents lining the route, the Baton Relay was a
successful event with positive feedback from the
Commonwealth Games organisers.
Page 32 of 41
Section 33
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
There has been significant progress on the backlog of community lease renewals. Following
de-amalgamation, we inherited more than 28 expired leases and had quite a number of other
community groups with no formal tenure arrangements. By 2017, there were no community
groups without tenure arrangements in place and only 8 leases still awaiting renewal.
Council has undertaken two community Council meetings during 2017/18. In November
2017, we held a Council meeting at Sunshine Beach and in June 2018, we held a Council
meeting at Kin Kin. This continues Council’s ongoing commitment to open decision making
and provides an opportunity for more members of the public to attend Council meetings. In
keeping with our ongoing commitment to transparency, during the year we only closed
Council/Committee meetings on 5 occasions to deal with confidential matters.
Council worked closely with the Pomona community to provide support and advocacy in
relation to the Mid-Town Rail crossing. Following a significant lobbying campaign and
working very closely with the community, success was achieved when Queensland Rail
announced that it would retain the crossing and look at safety upgrades rather than closing
the crossing.
Council finalised the design of the Park Road Boardwalk following an extensive community
engagement process. Expressions of interest were called and following a subsequent tender
process, a contract for $6.5M was awarded to Hutchinson Builders. Construction has
commenced and will be completed in the latter half of 2018. At the same time, the Noosa
Main Beach Boardwalk upgrade (between the Surf Club and Sails) is underway and will be
completed shortly.
Noosa participated in the University of Canberra’s Rural and Regional Wellbeing survey. The
survey found that as a community, our sense of well-being exceeded other regional areas in
Queensland and Australia in 9 out of the 10 areas measured.
Following extensive community engagement with the Cooroy community regarding the future
of the Cooroy Community Hall, Council agreed to accept trusteeship of the Deed of Grant in
Trust and supported the establishment of the Cooroy Community Hall Association Inc. in
January 2018. An agreement to lease was signed with the Association so they could
renovate and ultimately manage the Hall. As part of that agreement Council agreed to fund
50% of the restoration costs (capped at $192,000) with the community funding the remaining
50%. This has been an excellent outcome for the Cooroy community with the official re-
opening of the hall occurring in April 2018.
Council has undertaken numerous Library and Gallery programs to support our community.
Our Library Services have physically
issued over 744,00 items to our
community during the last 12 months.
The Council also let a tender for the major
refurbishment of the Noosaville Library
which will be completed in the second half
of 2018.
Council opened a Makerspace at the
Cooroy Library with funding assistance
from the State Library of Queensland.
The Makerspace includes 3D printers,
robotics and virtual reality “hands on”
activities.
Council completed a detailed review of the options for the future use of the Noosaville
foreshore. This included an extensive community engagement process which culminated in
the adoption of the Noosaville Foreshore Land Use Master Plan in May 2018. The
importance of this area to our community was highlighted by the large number of submissions
made through the community engagement process.
Page 33 of 41
Section 34
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Council has reviewed and updated its Community Engagement Policy. Significant community
engagement projects in 2017/18 included:
o Park Road Boardwalk o Peregian Beach Digital Hub
o Climate Change Adaption Plan o Waste Management Local Law
o Pioneer Park, Cooran o Arts, Heritage and Cultural Plan
o Cooroy Memorial Hall
Council responded to community concerns about the proliferation of short term online
booking agencies. We were successful in having a motion passed at the Local Government
Association of Queensland Conference that resulted in the establishment of a State
Government Reference Group to address the issue and Mayor Wellington was appointed as
one of two Local Government representatives on that Group. The final outcomes of the State
Government Reference Group should be known soon.
Council won a Queensland National Trust Award for the project on “Noosa Remembers – A
History of the World War 1 memorials of Noosa Shire”. We also provided Pomona Arts Inc.
with one off funding to support their ongoing management of the Pomona Majestic Theatre.
Council focused on recognising the important role of volunteers in our community. A series
of videos was produced highlighting examples of the work undertaken by volunteers and a
“volunteer recognition” event was hosted by Council.
Our Noosa Aquatic Centre, Noosa Leisure Centre and The J all had outstanding years.
Reports will be provided to Council in due course in relation to the annual performance of our
community facilities. In terms of numbers, the NAC had 242,922 visits which is just under last
year’s record number of visits, the Leisure Centre had 109,108 visits which is up 7.1 % on
last year and The J had 85,089 visits which is up 6.7% on 2016/17.
Council once again provided funding for the free bus service at Christmas and Easter to
make it easier for our community to move around during those busy holiday periods. Usage
of that service continued to grow and we also negotiated new service arrangements for
parking at the Noosa Heads Lions Park with increased parking fees from $10 to $20. The
average number of passengers using the free buses during the Christmas period has grown
from 3,926 in 2015/16 to 4,157 in 2017/18. Like previous years, 66% of users had access to
a car but caught the bus to avoid traffic and congestion. Surveys showed that 94% of users
were either very satisfied or satisfied.
Council continued to provide its community grant program supporting our community groups.
During 2017/18, we provided $842,946 in grants to 135 recipients to support projects,
acquisition of equipment or events. Council staff also facilitated a number of evening
information sessions for community organisations to help improve their governance and grant
writing skills. Details of the grant categories and amounts are set out below:
Grant Type Number of Recipients Total grant value
Community Project 47 $261,057
RADF 16 $73,000
Alliance Agreements 13 $114,687
Emergency Alliance Agreements 2 $21,307
Halls and Community Centres 10 $79,218
Festive Season Events 10 $44,558
Signature Events 7 $60,320
Sports Fields 12 $165,273
Water Rebates 18* $23,526
Total 135 $842,946
*plus community groups whose Water Rebates were subsidised through our Property Branch
Page 34 of 41
Section 35
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Corporate Plan Theme 3: The Noosa Economy
“Our economy is diverse and resilient”
Key achievements as we work towards our long term goal include:
The construction of the Peregian Beach
Digital Hub was completed. Council was
successful in obtaining $1 million of
funding from the State Government and
we are awaiting advice from the
Commonwealth Government on $2.5M for
Stage 3. Following an EOI process,
tenant and co-workers have been
identified and the Hub now has its first
occupants with more to come over the
coming weeks. Council has also secured
a Digital Hub Director who has excellent
industry experience.
Council adopted an Economic Development Grants Policy in November 2017 and provided
grants in support of programs that will achieve the outcomes of the Local Economic Plan.
Council continued to work closely with Tourism Noosa and entered into a new funding
agreement which provides funding for 3 years with a further 2-year option. Council worked
closely with Tourism Noosa on the development of its Noosa Tourism Strategy 2017 - 2022.
This strategy includes a focus on “value over volume” in relation to tourism so that the focus
is on yield per visitor rather than simply more visitor numbers. As a separate but related
issue, the Council adopted the Noosa Main Beach Events Policy which prescribed a limit on
the number of events to be held annually on Noosa Main Beach.
Council and Tourism Noosa worked together to establish a Sustainable Tourism Stakeholder
Reference Group. This brings together approximately 15 different groups from the business,
community and environmental sectors to consider challenges associated with how Noosa can
manage the success it has achieved in becoming a premier tourism destination. The Group
met 3 times during 2017/18 and will continue to meet in the coming months.
Council continued to work closely with Regional Development Australia (Sunshine Coast) on
a range of projects including a successful entrepreneurship program.
Council continued an audit of business signage across the shire and also provided
information to the operators while the audit was being undertaken.
Council awarded management rights for the Cooroy RV Stopover to the Cooroy Chamber of
Commerce for a 3-year term. The ongoing activation of the Cooroy RV Stopover will assist
the local Cooroy economy.
Council worked with the private sector to assist with the establishment of Innovate Noosa.
This is part of a regional program that attracted significant funding from Advance Queensland
to develop innovation on the Sunshine Coast. Council supported a number of networking
events to promote this initiative.
Council continued to successfully implement its Local Economic Plan. Unemployment rates
in Noosa continue to be at historic lows – Noosa 4.5%, compared to the balance of the
Sunshine Coast, 5.1% and Queensland, 6.0%.
Council co-funded an Innovation Masterclass for 14 local businesses to develop local
business capacity.
Council staff worked closely with the Noosa Junction Association throughout 2017/18
assisting them with the implementation of their plan to regenerate the Junction. A number of
joint meetings were facilitated with stakeholders regarding the planning scheme.
Page 35 of 41
Section 36
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Corporate Plan Theme 4: Long term planning for Noosa Shire
“Noosa Shire is well managed and sustainable”
Key achievements as we work towards our long term goal include:
Council undertook significant work on the development of the new Planning Scheme during
2017/18. Council adopted the New Noosa Plan in May 2018 for the purpose of the State
interest review. We have undertaken a large range of studies and assessments to support
the development of the scheme including:
o Agriculture & Agricultural Land in Noosa Shire
o Biodiversity Assessment Report
o Centres Hierarchy
o Extractive Resources & Minerals
o Flood Management
o Housing Needs Assessment
o Landslip Hazard Report
o Nature-based Tourism Review
o Noosa Open Space Study
o On-site Effluent Disposal
o Urban Design Locality Summary Report
o Waterways Assessment Study.
Council was able to provide significant input into the ongoing development of the draft South-
East Queensland Regional Plan. That final outcome of that Plan, which was adopted in
August 2017, resulted in recognition of Noosa’s planning approach. There was no expansion
of the urban footprint in Noosa which is a good outcome for the Noosa community.
Council undertook a significant review of our infrastructure plans to enable us to meet new
legislative requirements for the imposition of contributions from developers towards the cost
of infrastructure. This included the adoption of a suite of plans such as the Transport Network
Plan as required for the Local Government Infrastructure Plan (LGIP). We were one of the
first Councils in Queensland to develop a LGIP under the new legislation and have it in place
before 30 June 2018. We adopted our new LGIP at a Special Council meeting on 29 May
2018.
Council undertook a review of our Local Laws and Subordinate Local Laws focusing
particularly on Local Law 1 (Administration) and Local Law 2 (Animal Management).
Following the statutory review process, Council will finalise these amendments in August
2018. Council also established a new Local Law (Local Law 7) dealing with waste
management on the basis that the State was going to remove the legislative power on which
Councils regulated commercial waste collection.
Council commenced a process to update its Corporate Plan. The Corporate Plan retains the
current vision – “Noosa Shire - different by nature”. Although significant changes are not
proposed, it is an opportunity to keep the Corporate Plan up to date and relevant.
Council adopted an updated Noosa Local Disaster Management Plan in October 2017 which
guides our responses to natural disasters. Council has also undertaken considerable work in
developing our response to natural disasters including undertaking disaster management
exercises to train our staff. Our long serving Local Disaster Co-ordinator is stepping down
from that role as at 30 June 2018 and our Director Infrastructure Services will assume that
role. Council also adopted the Noosa Local Recovery Sub-plan 2018 to guide recovery
processes in the event that a major disaster occurs.
Page 36 of 41
Section 37
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Council also completed the Six Mile Creek Flood Study after extensive consultation with the
Lake Macdonald Drive Community Reference Group.
Council began implementation of its Transport Policy and Transport Strategy. We have
begun to work with some local schools on Walk/Ride to school programs. Extensive
research has also been undertaken on the other 4 priorities identified in the Strategy
including parking studies, negotiations with Translink etc. A longer term vision (e-Noosa) has
also been developed to assist in lobbying other levels of government for funding. A separate
report on this issue is being reported to the July round of Council meetings.
Noosa Council provided a charging station for electric vehicles at Cooroy as its contribution to
the State Governments Electric Super Highway stretching from the Gold Coast up to Cairns.
Council adopted a Strategic Asset Management Plan in
September 2017. That Plan set the framework for the
adoption of more detailed Asset Management Plans and
Council has subsequently begun the process of adopting
some of these plans. To date, detailed asset management
plans have been adopted for the Noosa Main Beach Sand
Recycling System and the Noosa Aquatic Centre. Work on
Roads and Bridges is well advanced and should be
complete soon with Stormwater to follow.
Council developed its first 5-year Capital Program allowing
for a longer planning horizon for capital projects. Our
Infrastructure Planning, Design and Delivery team now
have future projects they can plan for. In addition, our
teams delivered a significant number of capital projects
including:
o Weyba Road corridor upgrade, Noosaville;
o Donnellys Road upgrade, Ridgewood;
o Kinmond Creek Culvert upgrades at Cootharaba;
o Boat Ramp Upgrade, Tewantin;
o Flood Gauge Monitoring Systems on Six Mile Creek;
o Bus Stop upgrade program;
o Poinciana Avenue, Tewantin; and
o Major reseal program with 11.8 km of roads either resealed, rehabilitated or spray
sealed.
Council was successful in securing grant funding to replace a number of bridges including the
Mary River Road Bridge in Cooroy and the Noosa Road Bridge in Cooran. Tenders have
been awarded for these two bridges with the tender for the third bridge at Orealla Crescent,
Sunrise Beach to be undertaken in 2018/19.
Council adopted its Signage Policy in August 2017. This provides for a more uniform and
consistent approach to Council signage noting the importance of the Noosa “look and feel” as
set out in our Noosa Design Principles.
Corporate Plan Theme 5: Excellence as a Council
“The Noosa Shire community is proud of its Council”
Key achievements as we work towards our long term goal include:
Council undertook its first detailed community satisfaction survey which was reported to
Council in August 2017. The Survey was undertaken by an independent professional survey
firm (Market Facts) and identified that Council was achieving a community satisfaction score
significantly above comparable Councils in almost all service categories.
Page 37 of 41
Section 38
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
o 76.4% of respondents viewed Council’s overall performance as good and very good.
o Top performing services were Waste Management, Customer Service, Disaster
Management, Community Safety, Management and Supervisory Officers, Quality of
Elected Council and Financial Management.
o Areas for improvement included Parking, Facilities, Economic Development/ Local
Employment, Road Maintenance, responding to the Community, Road Construction, and
Providing Leadership and Advocacy.
Although our end of year financial statements have not yet been finalised, it is clear that we
have had another successful financial year. Revenues were above budget and expenses
were below budget. This will be reported to Council separately in due course.
Council has successfully achieved another unmodified audit from the Queensland Audit
Office with the 2016/17 financial statements being signed off by the QAO in late 2017.
Council undertook a successful Enterprise Bargaining negotiation process with employee and
union representatives. This resulted in an 87% “yes” vote in June 2018 with the formal
Certified Agreement to be registered with the QIRC in coming months.
The Audit and Risk Committee has continued to add value to our compliance and
performance for governance and finance. This has included an oversight of our strategic
risks, review of key governance and financial policies, review of organisational KPIs,
development of Business Continuity Planning etc. Our two external members of the Audit and
Risk Committee in particular have added significantly to our overall governance practices.
Although not high profile, this Committee plays an important role in making sure that Council
“dots the i’s and crosses the t’s” both in governance and in the management of risk. Council’s
Internal Audit Program included internal audits on:-
o Bank reconciliations;
o Rates and utility charges; and
o Insurance strategy and insurance renewal processes.
Our organisational structure was adopted in March 2017 and came into effect in July 2017.
Our new Director Infrastructure Services and Director Environment and Sustainable
Development were appointed as well as our new Environment Manager.
We continued to focus on good governance practices and adopted or updated a range of
polices in support of that goal. These included:
o Administrative Action Complaints Process;
o Audit and Risk Committee Charter;
o Councillors' Expense Reimbursement Policy;
o Internal Audit Policy and Terms of Reference;
o Local Law Making Process;
o Public Interest Disclosure Policy and Procedure; and
o Insurance Renewal Procedure (Internal document).
Our enterprise risk management has been further developed with risk management practices
being further embedded into Council operations. The Executive Team reviews strategic risks
on a quarterly basis and operational risk registers have been established at a Departmental
level. Our comprehensive Business Continuity Plans are now complete and will be tested
soon.
Council continued to look at ways in which we can improve services. One of the most
important steps this year was the development of a Level of Service catalogue which was
adopted as part of our 2018/19 budget process. This is the first time that Council has had
service by service details of what is provided, costs, response times, benchmarking etc.
Page 38 of 41
Section 39
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
The transformation of our Workplace Health and Safety performance has been significant.
We recently undertook an external audit of our WH&S Systems and achieved a score of 74%
(up from 19% and 26% three to four years ago). We have transitioned from one of the worst
performing local governments of our size to one of the best performing local governments of
our size. We also held a major WH&S event in 2017 with the Qld WH&S Ambassador Shane
Webcke speaking to staff about the importance of WH&S.
We transitioned our ICT systems to the latest version which provided enhanced systems
capability. We also undertook an external audit of our ICT security systems and received a
detailed report on cyber-security. We have also continued to roll out our ICT Strategy to
enhance our system capabilities with the start of our property and rating system transition.
We undertook significant training and development for our middle managers with programs
focused on team leaders and supervisors. However, we still have more to do to successfully
implement an annual staff development program.
2 OTHER ISSUES
There are some other activities which are worth highlighting:
We have continued to build good working relationships with our northern neighbours, Gympie
Regional Council. This has included regular meetings at a Mayoral and executive level,
assisting each other with relevant documentation and policies, support for interview panels,
potential joint contracting etc. It is proposed to continue this co-operation with mutual
assistance for each other’s Audit & Risk Committees.
We continue to attract significant interest from other Councils as to how we are successfully
delivering good outcomes to our community. We have hosted Councils from interstate looking
at our ICT solutions, hosted local government CEOs from remote parts of Queensland and
hosted other professionals looking at our work practices.
3 REFLECTIONS AND ACKNOWLEDGEMENTS
Clearly as outlined above, 2017/18 was another busy year. The list of what we have achieved is
long (and may well be incomplete) but doesn’t include all of the day to day services provided like
lending library books, running the Aquatic Centre, sweeping streets, answering customer
enquiries, managing development applications etc.
To put the level of “day to day” activity into perspective, the following statistics are provided:
Services Provided in 2017/18 Data
Number of visitors to the Noosa Aquatic Centre 242,922
Number of visitors to The J 85,089
Number of visitors to the Noosa Leisure Centre 109,108
Number of clients serviced at Noosa Community Support 2,681 clients
(38,100 services delivered)
Number of physical items issued by our Libraries Noosaville: 468,958
Cooroy: 230,738
Mobile: 44,354
Total – 744,051
Page 39 of 41
Section 40
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Services Provided in 2017/18 Data
Number of bins collections 1,518,164 general waste bins
740,725 recycling bins
360,312 garden bins
133,400 public place bins
42,783 waste bulk bins
13,618 recycling bulk bins
Number of customer visits to the Waste Disposal facilities 131,000
Number of calls/ enquiries/ transactions by our frontline 100,232
customer service team
Number of development applications and percentage approved 503 applications
for the 2017/18 year 98.5% approved
(includes tree removal applications on
private land)
Number of rate notices issued for 2017/18 year 63,354
Number of new citizens inducted by Council at citizenship 111
ceremonies
Length of road resurfaced in 2017/18 Asphalt – 4.4km
Spray sealing – 6km
Road Rehabilitation – 1.4km
Total – 11.8km
Length of road serviced by street sweeper 11,678 km
Number of requests regarding trees on public land 1,973
Acknowledgement
This could not have been achieved without an incredible amount of hard work and commitment
by our Mayor, Councillors, Directors, Managers and all of our staff.
There is rightly a real sense of pride with what we have achieved in the last year, and indeed our
last 4 ½ years. I can’t speak more highly of our staff. It is only through them that we have been
able to achieve such good outcomes.
We can’t rest on our laurels. There is always more to do. The key areas of focus in 2018/19 as
part of our ongoing journey include:
Implementation of our Transport Strategy;
Finalisation of the remaining detailed Asset Management Plans;
Finalisation of our Environment Strategy;
Pursuing the State Government on Beckmans Road;
Initiation of the Cooroy Hinterland Park project
Successful completion of some high profile projects (e.g. Boardwalk, Noosaville Library etc)
Ongoing management of the Sustainable Tourism Stakeholder Reference Group
Page 40 of 41
Section 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Previous Council Consideration
A Year in Review report is provided to Council in July each year.
Finance
The delivery of our 2017/18 programs was in accordance with the Budget and Operational Plan.
Risks & Opportunities
This report is also being provided in accordance with the requirements of the Local Government
Act 2009.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Executive Team.
Departments/Sections Consulted:
X Chief Executive Officer X Community Services X Corporate Services
Executive Officer X Director X Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
X Executive Services Environment & Sustainable Development X Infrastructure Services
X Director Director X Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 41 of 41