GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Page 14 of 41
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
NOOSA COUNCIL Capital Schedule
Report run date: 1¢-Jur2018 14.1206
S00567 500567 - Pomona, Skate Park Shade Sail 60,000 o o a o o oo 0.00%
s00s6s SO0566 - Sunshine Geach, Skate Part Refurbishment 200,000 211,008 400,368 403,258 403,355 401,065 oo 3.43%
S00720 500720 - Nocsavilie Gympie Terrace - Sarbers Thomas Memorial Garden a 6 a a o 308 70 1.00%
s00781 50071 - Cooran Pioneer Park upgrade - Design & Construction (inci 100,000 100,000 100,000 45,000 45,000 70,540 23736 156.76%
so07é2 50072 - Pomona Stan Topper Park Sollerd instaiiston 50,000 $0,000 35,000 36,000 35,000 33,030 76 S378
soo7s3 500783 - Lake Macdonald Botanic Gardens Master Pian 10,000 10,000 10,000 10,000 10,000 o oo 0.00%
500815 500615 - Pelican Seach Park Revetment Wall Renews! a 6 20,000 47,000 47,0 46052 oo 38.00%
s00821 500821 - BBQ renewals along Gympie Terrace a o 18,525 18,525 18,525 16,161 oo a7 me
Total Parke & Playgrounds £40,000 413,383 026.288 283,883 883,882 7121s 73,373 107.28%
500103 500103 - Cooroy Nooss Road Corridor improvement a o o a o a S 0.00%
500526 - Nocss Heads Part Road, Scardwak Design and consufaton a 6 o a 6 37,520 06 o00%
S00625 500514 - Tewantin Poincians Avenue Shared Path Upgrade Design & Const a o o a o a 70 0.00%
s00623 500515 - Nocsavilie Eenie Creek Road Of-Ramp to Underpass Design & a 6 o 18,000 18,000 o oo 0.00%
500616 - Whole of Shire - Noosa Pedestrian and Cycie Oats Counters a T3586 73,666 73,666 T3566 St 70,525 @ O73%
500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design a 103,553 103,659 103,659 103,653 56555 sree SS%
s00671 S007! - Noosa Heads, Park Road Scardwsk Construction 6,500,000 6,993,573 14655,3680 3.286,629 3285,629 1,552,060 5226,058@ aS
so0s72 500572 - Noosa Heads, Main Seach Boardaaik Construction $00,000 o 25.000 33,500 33,500 177281 12,1539 $529.20%
so0073s 500736 - Nocsavilie Wallace Part Patway Renesas 180,000 180,000 180,000 260,000 260,000 261728 oo 100.56%
S00740 500740 - Botanic Gardens Pathway Replacement a S327 S227 o 6 o oo o00%
S00807 SOOSCT - Blakesley Street Footpath Upgrade Stage 1 a 90,000 ‘90,000 63,338 63,338 T4856 od 118.20%
500817 500514 - Jacaranda Park, Tewantin - Pathway Renewal a 6 ‘0,000 $0,000 $0,000 56399 24% @ 267%
S00822 500822 - Pedestrian Bridge renews! at Alec Loveday Park, Tewantn a 6 22.000 3,000 3,000 345 6 196.50%
so00823 500623 - Boardwalk renewal st Gympie Tre, Noosaville a 6 31,000 31,000 4,000 20,033 oo ome
s00824 S00624 - Pathway renewal at Em St, Cooroy (train to school) a 6 13,000 13,000 13,000 WAT 220g 8.75%
soos2s S00825 - Pathway renewal at David Low Way -Castaways Beach a o 20,000 20,000 20,000 28,533 5030 142.55%
S00826 SO0E26 - Pathway renewal at Goodwin Street+-Tewantn a 6 24.000 24,000 0 22400 oo 33.33%
SOO827 S00827 - Pathway renewal at Pactic Av - Sunshine Seach a 6 $.coo $3,000 3,000 7.715 oo 85.72%
SO0E26 - Pathway renewal st Gympie Terrace a 6 93,683 33,883 $3,883 6148 £0,000 © 655%
SOos2S 500828 - Pathway renewal at James St, Noosaville a o 25.000 25,000 25,000 13.203 oo 2.81%
500830 ‘S00630 - Noosaville, William Street Smared Zone Footpath a 6 6.coc 6,000 6,000 o 706 o00%
500831 500631 - Tewantn Diyan Street New Footpath a 6 11,300 11,300 11,300 o 06 o00%
Total Pathways & Boardwalk 7,180,000 7 448,225 2202216 4183,876 4,163,875 2,320,202 654,078 72%
Public Transport infrastructure
s00312 500528 - Whole of Shire Bus Sheer Disabled Compliant Program 600,000 600,000 ‘600,000 600,000 600,000 621,140 13,230 103.52%
soo7o2 SO07TG2 - Nocsavilie, Lake Weyba Orive Sus Turnaround a 137,547 137.587 215,000 215,000 214210 oo 39.53%
Total Publ Trancport Intractructure 809,000 737 847 737,047 $16,000 216,000 836.250 128,208 102.60%
500530 - Whole of Shire Reseai & Rehabilitation Program 3,000,000 2468,535 2463,536 2.468,536 2,468,536 2.352457 — BSI
500531 500531 - Whole of Stire Pavement surveys and investigations 2015/2016 a 6 o a 6 eo oo 000%
500515 - Black Mountain Fid Landsip a 204,188 215,188 250,000 (250,000 251,332 13370 100.77%
s00741 500741 - Nocsavile - Mary Street toopath, roadworks & drainage impr a 6 o a 6 1200 oo o00%
SO0747 SO0747 - Sunrise Road Cycie Lanes Design a o o a o 20,742 oo 0.00%
s00840 SO07S7 - Black Mountain - Road Priority Sections and Fioad Reconstruct 510,000 510,000 245,000 $0,000 $0,000 115,137 Bg 17.53%
Ssoo762 SOOTE2 - Emergent Works - Lake Weybe Rd Noosaville a 6 o 45,136 45,135 45135 oo 100.00%
Page 14 of 41See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.