2018-07-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Council also completed the Six Mile Creek Flood Study after extensive consultation with the
Lake Macdonald Drive Community Reference Group.
Council began implementation of its Transport Policy and Transport Strategy. We have
begun to work with some local schools on Walk/Ride to school programs. Extensive
research has also been undertaken on the other 4 priorities identified in the Strategy
including parking studies, negotiations with Translink etc. A longer term vision (e-Noosa) has
also been developed to assist in lobbying other levels of government for funding. A separate
report on this issue is being reported to the July round of Council meetings.
Noosa Council provided a charging station for electric vehicles at Cooroy as its contribution to
the State Governments Electric Super Highway stretching from the Gold Coast up to Cairns.
Council adopted a Strategic Asset Management Plan in
September 2017. That Plan set the framework for the
adoption of more detailed Asset Management Plans and
Council has subsequently begun the process of adopting
some of these plans. To date, detailed asset management
plans have been adopted for the Noosa Main Beach Sand
Recycling System and the Noosa Aquatic Centre. Work on
Roads and Bridges is well advanced and should be
complete soon with Stormwater to follow.
Council developed its first 5-year Capital Program allowing
for a longer planning horizon for capital projects. Our
Infrastructure Planning, Design and Delivery team now
have future projects they can plan for. In addition, our
teams delivered a significant number of capital projects
including:
o Weyba Road corridor upgrade, Noosaville;
o Donnellys Road upgrade, Ridgewood;
o Kinmond Creek Culvert upgrades at Cootharaba;
o Boat Ramp Upgrade, Tewantin;
o Flood Gauge Monitoring Systems on Six Mile Creek;
o Bus Stop upgrade program;
o Poinciana Avenue, Tewantin; and
o Major reseal program with 11.8 km of roads either resealed, rehabilitated or spray
sealed.
Council was successful in securing grant funding to replace a number of bridges including the
Mary River Road Bridge in Cooroy and the Noosa Road Bridge in Cooran. Tenders have
been awarded for these two bridges with the tender for the third bridge at Orealla Crescent,
Sunrise Beach to be undertaken in 2018/19.
Council adopted its Signage Policy in August 2017. This provides for a more uniform and
consistent approach to Council signage noting the importance of the Noosa “look and feel” as
set out in our Noosa Design Principles.
Corporate Plan Theme 5: Excellence as a Council
“The Noosa Shire community is proud of its Council”
Key achievements as we work towards our long term goal include:
Council undertook its first detailed community satisfaction survey which was reported to
Council in August 2017. The Survey was undertaken by an independent professional survey
firm (Market Facts) and identified that Council was achieving a community satisfaction score
significantly above comparable Councils in almost all service categories.
Page 37 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.