Council archive · source document
07/1172 - MCU - New Dwelling [As Published] · 132007.1172
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more Information tefet to Guide 23, schedule
8A of the IPA, & schedule 2 of the [P Regulation.
Unless you answered ‘none of the above", the
application triggers referral a7 asa
concurtence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the appicable boxes}—
CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
schedule.
(A (ii) reconfiguring a tot—
(1 (@)_ onland that is completely or partly within a public transport corridor, and the
total number of lots increases;
{1 (b) _ on land that is completely or partly within a futu re public transport corridor or
an airport's public safety area;
(A) __ onland thatis within 400m of a public passenges transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
LI @) fora residential purpose within the 25 ANEF contour for an airport;
(1) _ fora residential purpose resulting in 100 or more allotments.
* C1 (ili) operational work assessable against the planning scheme, but not associated with a
: material change of use mentioned in (I) above or reconfi iguring a tot mentioned in (ii)
above, on land-that— ;
Ol) is completely or partly within a public transport corridor or a future public -
transport corridor;
Oo {b} . will result in work that encroaches into an airports operational airspace.
__ i (v) none of the above.
23. The application involves: (tick the applicable box/es)— :
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
C1 (i) reconfiguring a lot—
seeing ners eaten
(J @)_ oniand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
{1 (>) on land thatis within 400m of a Citytrain Passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
: greater;
(4) __ on land that abuts rait corridor tand, commercial corridor land or: future railway
land, and the total number of fots increases; _
— (1 6@) _ ontand that abuts rail corridor land, commercial cortidor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J €e) - on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1) foraresidential purpose resulting in 100 or more allotments.
Ci (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in.(i) above or reconfiguring a lot mentioried in (ii)
above, involving extracting, excavating or filling greater than §0mé, on land that— .
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[J (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(1) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
Rw (iv) none of the above.
application triggers.r tefercal ‘te the-hald: of .
Pipeline licence No 4 issied under. role
Act 1923, currently Santos QNT Ply Ltd; for
advice.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable bow/es)—
(1) (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
Ci (ii) reconfiguring a fot
LH (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located whoily or partly in the easement.
TX (iv) none of the above.
Page &
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1172 - MCU - New Dwelling [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.