Earthworks Code
Earthworks Code
Performance outcomes Acceptable Outcomes Response
Effects of works
Drainage Complies
PO1 AO1
Finished surface levels ensure land is free Filled or excavated areas have a minimum gradient
draining. of 0.5% and drain to Council’s stormwater
infrastructure where available, or where stormwater
infrastructure is not available, toward the street.
Hydraulics Complies
PO2 No acceptable outcome provided
Change to the levels on site do not have an
adverse impact on the flooding and drainage
characteristics off-site.
Geotechnical considerations Complies
PO3 AO3.1
Earthworks do not result in geotechnical Filling works are undertaken in accordance with
instability on-site or to nearby premises. Council’s Planning Scheme Policy PSP6
Engineering design standards - roads, drainage
and earthworks.
AO3.2 Complies
Where the filling is for residential, commercial or
industrial purposes the works comply with
Australian Standard - Guidelines for earthworks on
commercial & residential development.
Local amenity Complies
PO4 AO4.1
Undertaking earthworks does not adversely The following control measures are implemented—
impact on the amenity of the local area by way
of dust, noise or visual amenity. 1. regular water spraying of exposed
areas to suppress dust;
Page | 57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Code Assessments.pdfRelated documentApplication case desk ↗
About this file
- File size
- 886 KB (small file)
- File type
No other editions are linked here.