VIRIDIAN III - Landscape Works 3. BASIC EXCAVATION 3.1 EXCAVATION 3.1.1 GENERAL Refer Civil Engineer for Bulk Earthworks and Excavation. Do not disturb services. Locate all services before commencing any excavation and cultivation. Refer to Civil Engineer for service locations. Excavate / cultivate areas within 500mm of services by hand. 3.1.2 SITE CLEARING All existing vegetation indicated to be retained on drawings is to be protected from damage including associated root systems. Adequately protect from damage all structures and services which are beyond the limits allowed to the subcontractor. Where concrete, diesel oil or any other material harmful to vegetation has been spilt on the topsoil or subgrade, the affected areas shall be excavated and spoil removed from site. Affected areas are to be reinstated to suit final requirements or as directed on site. Remove from site all excavated material resulting from the required earthworks that cannot be reused in the landscape works. Remove from site all vegetative spoil. Do not burn. 3.1.3 LOCALISED EXCAVATION Inspect and carry out soil tests on all existing finished surface soils levels. Maintain and re- structure existing site topsoil soil that is approved by soil test to 300mm. Refer to site topsoil section of specification. For all other areas requiring imported topsoil, excavate and dispose all surplus material to allow for depths required for all landscape elements below: General Planting areas: 300mm General Turf areas: 100mm Tree Planting: Varies for different rootball sizes. Refer planting section in this specification. 3.1.4 SUBGRADE PREPARATION During cultivation, thoroughly mix in any materials to be incorporated into the subsoil. Cultivate manually within 300mm of paths and structures. Remove stones exceeding 25mm, clods of earth exceeding 50mm and any weeds, rubbish or other deleterious material brought to the surface during cultivation. Cultivate the subsoil to all planting and turf areas to a depth of 150mm. 3.1.5 TRIMMING OF SUBGRADE The subgrade shall be shaped to the profile required. The surface of the subgrade shall be compacted, trimmed, profiled and check levelled prior to placing of pavement materials. EDAW Aust Page 11 February 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian III Technical Specification OPW1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 133 KB (small file)
- File type
No other editions are linked here.