                                                                         VIRIDIAN III - Landscape Works

9.     WALLS


9.1    GENERAL

Supply and install Masonry and Wetstacked Walls, and Rendered finishing to Engineer’s
walls as shown on landscape plan and detailed. Refer to Engineer’s specification for all
masonry works and footing details. Refer to Landscape Architects details and specification
for finishes only.

9.2    WATERPROOFING

To AS475, Part 1, Section 2.5

Blockwork and Rendered walls: apply rubberised and reinforced liquid membrane system
to all retained sections. Membrane to be chemind ‘newflex’ system or approved equal.
Install to manufacturers instruction and as detailed on the drawings.

Warranties: provide evidence of all guarantees and warranties.

9.3    STONE WALL FACING AND CAPPING

9.3.1 GENERAL

Supply and install stone-faced walls as indicated and detailed on the drawings.

9.3.2 SAMPLES

Stone supply: The wet stacked stone walls are to match existing stone walls on site. The
contractor shall provide a sample of stone prior to installation for approval by Landscape
Architect and Engineer.

Placement: The Contractor shall install a 2 x 1m section of wet stacked stone for approval by
the Builder. The sample panel may be included in the run of the wall, but is subject to
removal if the sample is not approved.

9.3.3 SITE CONDITIONS

Ensure that all installation conditions are satisfactory for this work. Ensure that the finished
block and stone work is within specified tolerances.

9.3.4 HANDLING PROCEDURES

Bends, kinks, cracks, chipped edges or surface marking of panels from mishandling or
storing will be sufficient cause for rejection. Immediately after installation the work shall be
protected from damage and contamination.

9.3.5 BEDDING AND FIXING

Adequately support and restrain the rendering using durable materials.

9.3.6 WORKMANSHIP

The Contractor shall obtain all the necessary measurements for the proper carrying out of
the work and shall verify it so that this work will cover the area shown on the drawings. All
work shall be carried out strictly in accordance with the detail drawings provided.


EDAW Aust                              Page 27                        February 2008

Used in these records

About this file

File size
133 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Viridian III Technical Specification OPW1 [As Published].pdf · 133 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.