Viridian III Technical Specification OPW1 [As Published] · 142008.256
VIRIDIAN III - Landscape Works 14. PLANTING WORKS 14.1 GENERAL Supply the scheduled number of plants to the quality, size and health in accordance with this specification and Plant Schedule. Plants shall be secured in sufficient time to ensure they achieve specified sizes and quality for the Contract. The Builder must be informed immediately if any difficulty is encountered in procuring the plants on the nursery site at which they are to be stored, and clearly labelled as being for this project. The allocated plants must also be made available to the Landscape Architect to be inspected at all times. Photographic evidence of all species is required 4 weeks after Contract has been let. Photographs must contain at least two plants / trees per species including a measuring staff or other measuring devices illustrating height and spread of individual species. 14.2 SPECIAL REQUIREMENTS All plant stock is to conform with the criteria outlined in the NATSPEC Guide: Specifying Trees. Attain all plant stock from a QALI registered supplier with an Australian Standards Approved Quality Assurance System. The nurseries location must be situated within 100km radius of Noosa and inspection of all plant stock shall take place at one location only. Alternatively, the Contractor shall reimburse the Landscape Architect for time and travel to inspect the plant material. The Contractor shall be suitably qualified to certify all plant stock. It is recommended that a Noosa Council approved arborist certify all trees 45L and above to avoid replacement at final inspection. Is so please provide written certification by arborist. 14.3 EXCAVATING FOR PLANTING Planting Areas: Excavate a hole for each plant large enough to provide not less than 200mm of topsoil round the root system of the plant, or as shown on the Drawings. Planting of Trees: Excavate a hole a minimum 300mm wider than the rootball and cultivate site topsoil to a depth of 200mm below. Loosen compacted sides of the hole, as necessary to prevent confinement of root growth to the hole. 14.4 PLANTING 14.4.1 GENERAL Set out plant material in positions and quantities as shown on planting plans unless otherwise directed. If it appears necessary for plants to cover the area more uniformly, or for similar reasons, notify the Landscape Architect for instruction and direction. Planting holes shall be prepared not more than twenty four (24) hours in advance of planting. A slow release tablet form of fertiliser is preferred, 'Agriform' or equivalent. Apply tablets at the rate and depth of the manufacturer's recommendation. Water plants in containers immediately prior to planting. Plant to approved set out and detail, refer to Planting Plan and appropriate details. Ensure that the topsoil level of the plant root ball is 20mm below the finished surface of the soil surrounding the hole by backfilling as required. Where root growth has been restricted in the container, the outside roots shall be lightly teased prior to planting. Care should be taken to ensure that roots are not exposed to drying influences such as sun or wind. Avoid leaving air pockets in backfill by carefully firming soil progressively. Water all plants thoroughly after planting, and for the duration of the establishment/maintenance period, to EDAW Aust Page 39 February 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian III Technical Specification OPW1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 133 KB (small file)
- File type
No other editions are linked here.