Viridian III Technical Specification OPW1 [As Published] · 142008.256
VIRIDIAN III - Landscape Works
1.18 WARRANTIES
Warranties or guarantees specified shall name the Principal as warrantee. Register with
manufacturers as necessary. Retain copies delivered with any components and equipment
to the Principal.
Warranties and/or guarantees to be submitted to the Builder for transmission to the Principal
within fourteen (14) days after practical completion.
Commence warranty periods at practical completion or at acceptance of installation, if
acceptance is not concurrent with practical completion.
If installation is not by manufacturer, and product warranty is conditional on the
manufacture’s approval of the installer, submit the manufacturer’s written approval of the
installing firm.
1.19 WORKPLACE HEALTH AND SAFETY
The contractor shall comply with all the requirements of the Health and Safety Act 1995.
1.20 VERIFICATION OF SERVICES
The Contractor shall be responsible for the verification of services within and bordering the
site. Service lines are to be marked and brought to the attention of all workers. Any
modification or temporary interruption of services shall have attained permission from
respective utility service authorities.
The Contractor shall be responsible for liaising with the appropriate persons, to organise on
site detection of respective services. Forty-eight hours notice is required for the
organisation of such field personnel.
The Contractor will be held liable for any damage to services resulting form excavation
works.
END OF SECTION
EDAW Aust Page 9 February 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian III Technical Specification OPW1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 133 KB (small file)
- File type
No other editions are linked here.