20220171 - 14 Wyandra St SWMP

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

GENERAL NOTES                                                                          18. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING                                 300MM CENTRES                                                               SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
                                                                                           CONSULTANTS/CONTRACTORS DRAWINGS:                                                                                                                                 OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                                                                                                                                                                              DUST MOVEMENT.
                                                                                                  SURVEYOR:         NOOSA COOLOOLA LAND SURVEYS PTY LTD                 EARTHWORKS NOTES
2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                                                                                                                                                                                    20. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
     CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                                    ARCHITECT:        BLACKWOOD ARCHITECTURE                              1.  FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND                    DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
     SETOUT THE WORKS.                                                                            HYDRAULICS:       TBC                                                     VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.                    CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                                                                        2. FOR DETAILED GEOTECHNICAL INFORMATION, IT IS RECOMMENDED THAT THE             21. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                       STRUCTURAL:       RECOR                                                   GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL                         REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
     SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                                                                                              CONDITIONS PRIOR TO EARTHWORKS COMMENCING.
                                                                                                  LANDSCAPE:        ELEMENT DESIGN                                                                                                                           GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
     CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT
                                                                                                                                                                        3. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM                   UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
     GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD                 19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
                                                                                                                                                                            OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND                       1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
     DRAWINGS AND SPECIFICATIONS U.N.O.                                                    ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
                                                                                                                                                                            STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL                 HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
                                                                                           WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
3.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                                                                                                          MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.                                   ENGINEER.
                                                                                           ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
     THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND                                                                                                      4. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT                 22. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
     LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT                      20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY                 MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE                          TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
     THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.                       APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW                    PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE                   SPECIALIST SHORING CONTRACTOR.
                                                                                           APPROVALS BY COUNCIL.                                                            REMOVED FROM SITE AT CONTRACTORS EXPENSE.                                    23. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
4.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS
     SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS                    21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                    5. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL                      SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
     TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                                  BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                       VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT.                   OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
     COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                     THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                    CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON                             ENGINEER.
     CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL                      RESERVE, PARKS/OPENSPACE, EASEMENTS.                                             SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE               24. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
     EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                                                                                                             WITH GEOTECHNICAL REPORT AND AS1289.                                             CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
                                                                                       22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
     DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                             6. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED                   HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
                                                                                           DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.
     CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING                                                                                                           ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO                          SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
     PROPOSED WORKS.                                                                   23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                      IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED           25. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
                                                                                           ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                     PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON               TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
5.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
                                                                                           CONSTRUCTION CODE (2013).                                                        THE SITE.                                                                        BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
     SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
     ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES                                                                                                  7. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED                    DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
                                                                                                                                                                            WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE              26. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
     PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY                   STANDARD SIGNS AND LINE MARKING NOTES                                                NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL                    GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
     REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION
     PRIOR TO COMMENCING CIVIL WORKS.                                                  1. GENERAL                                                                           FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC                     THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
                                                                                         1.1. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE                MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND                       THE PRELOADING OPERATIONS.
6.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                      CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED
                                                                                              QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL                                                                                                     27. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
     BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,                                                                                                             STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF
                                                                                              DEVICES (CURRENT EDITION).
     CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                                                                                        15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM
                                                                                       2. SIGNS
7.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                         2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS
                                                                                                                                                                            C.B.R. OF 10%.                                                               INSPECTIONS:
     AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT                         NOTED OTHERWISE.                                                          8. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
                                                                                                                                                                                                                                                         THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
     TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF                                                                                                                   CONTENT FOR STANDARD COMPACTION.
                                                                                         2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                                                                                                 BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
     INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.                                                                                                                  9. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE                   PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
                                                                                              EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE
8.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                                 POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE                 PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF                     INSPECTIONS. SHOULD THE
     WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                OF KERB.                                                                      RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT.
                                                                                                                                                                            RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL             CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
9.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                       2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                                                                                                    RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO
                                                                                                                                                                            ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION
     PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,                              TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                                                                                             THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
                                                                                                                                                                            REQUIREMENTS OF GEOTECHNICAL REPORT.
     CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES                            BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                                                                                                        RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
                                                                                              HEADLIGHT.                                                                10. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
     NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND                                                                                                           OF RETAINING WALL COLOUR AND FINISH.                                         a.    PRESTART
     INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION                         3. SIGN SUPPORTS
                                                                                                                                                                        11. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL           b.    EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
     EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.                                          3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE
                                                                                                                                                                            ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.                  AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                                                              THEY ARE IN A PAVED SURFACE.
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE                                                                                                          THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
    DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN                    4. LINEMARKING                                                                       CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN               c.    SIDE AND CUT OFF DRAINS
    CONFIRMATION THAT WORKS CAN COMMENCE.                                                4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                    CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS               d.    STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
                                                                                         4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                        AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                                                                                                                                                                                                e.    STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                                                                                                            BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO                      JOINTING NOTES                                                                       THE GEOTECHNICAL REPORT.                                                     f.    STORMWATER STRUCTURE BASE SLABS
    NOTE COUNCILS ADAC REQUIREMENTS.                                                                                                                                    12. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
                                                                                                                                                                                                                                                         g.    SEWER RETICULATION
                                                                                       1.   ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                          98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT                                                                                                           LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF            h.    WATER RETICULATION
    APPROVALS.                                                                              REQUIREMENTS OF AS3727.1:2016.
                                                                                                                                                                            250MM LOOSE THICKNESS (PRIOR TO COMPACTION).                                 i.    PAVEMENT SUBGRADE
                                                                                       2. SAW CUT JOINTS MUST BE:
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                                                                                                           13. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                             2.1.    BETWEEN 41 AND 31 OF CONCRETE PAVEMENT DEPTHS.                             PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN               j.   PAVEMENT REINFORCING
    CONSTRUCTION.                                                                        2.2.   CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                              ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL                          k.    PAVEMENT PRIOR TO SEALING (PRESEAL)
                                                                                         2.3.   PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                 EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION                                                                                                          AND LOCAL AUTHORITY REQUIREMENTS.                                            l.    RETAINING WALL FOOTING REINFORCING
    WORKS COMMENCING ON SITE.                                                          3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO
                                                                                                                                                                        14. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN                m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
                                                                                            ALLOW EXPANSION AND CONTRACTION MOVEMENTS.
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS                                                                                                          ACCORDANCE WITH LANDSCAPE DRAWINGS.
                                                                                       4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                                                                                                     n.    STEEL REINFORCEMENT OF CONCRETE STRUCTURES
    AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.                                                                                                      15. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
                                                                                            CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN                                                                                                 o.    PRACTICAL COMPLETION
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                               THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                              16. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT                      5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY                 MANAGEMENT PLANS.                                                            p.    ON MAINTENANCE
    OF ANY WORKS ON SITE.                                                                   AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.           17. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE                   q.    OFF MAINTENANCE
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED                  6. DOWEL BARS ARE TO BE                                                              INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC
                                                                                                                                                                            IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.                        r.    ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
    IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO                            6.1.   FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                                                                                                     DEVELOPMENT APPROVAL)
    ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND                                                                                                         18. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
                                                                                                400MM CENTRES
    BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH                                                                                                         RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT                     s.    ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
                                                                                         6.2.   FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT
    ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE                                                                                                        AUSTRALIAN STANDARDS AND LEGISLATION.                                              RELEVANT TO THEIR CERTIFICATION SCHEME
                                                                                                300MM CENTRES
    AS DIRECTED.                                                                                                                                                        19. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED
                                                                                         6.3.   FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                  ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO




                                                                                                                CLIENT DETAILS:                                   PROJECT ADDRESS:                                       APPROVED BY:                PROJECT NAME:

                                                                                                                                                                                                                                                     14 WYANDRA STREET, NOOSA HEADS
                                                                                                                                  14 Wyandra Pty Ltd                                                                                                 TITLE:                                     STATUS:

                                                                                                                                                                                                                                                     GENERAL NOTES                              FOR APPROVAL
          © ABN 89 647 469 707
                                                                                                                                                                  14 WYANDRA STREET, NOOSA HEADS                                  JARO BAULEKA                                                  NOT FOR CONSTRUCTION
             37 MARY ST                                                                                                                                                                                                             RPEQ: 2693
                                             01   24/08/2022 ISSUED FOR APPROVAL            MVP                 SCALE:
         NOOSAVILLE, QLD 4566                                                                                                                                                                                                         CPEng
            +61 7 5211 1003                 REV    DATE              DESCRIPTION            DWN   CHK   APP
                                                                                                                                    AS INDICATED                                                                                  DATE: 24/08/2022
                                                                                                                                                                                                                                                     DRAWING NUMBER:                            PROJECT NUMBER:                    SHEET REV:
                                                                                                                                                                                                                                                                                                                                    SIZE:
        RECORCONSULTING.COM                                                REVISIONS
                                                                                                                                  DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                     002                                        20220171                           A1 01
Log in to download the original file

20220171 - 14 Wyandra St SWMP.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.