Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

JFP SBSMP Revision C · OPW24/0103

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

     NOOSA COUNCIL
  REFERENCE DOCUMENT
OPW24/0103 8 OCTOBER 2024




SITE BASED STORMWATER
      MANAGEMENT PLAN
                                   Revision C

                   Proposed Development at
      36 & 38 DUKE STREET, SUNSHINE BEACH
                                       for
                          Cambooya Pty Ltd
Full text of the other 38 pages

Page 2

SITE BASED STORMWATER
MANAGEMENT PLAN

Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd


M3024E_DA1_SBSMP –Revision C
August 2024

JFP Urban Consultants Pty Ltd
Prepared by: C. Blair
Approved by: A. Fraser




   Revision      Date                         Details                   Prepared By          Approved By
      A       20/04/2023    For Authority submission                  CB (RPEQ 19190)       AF (RPEQ 5691)
      B       18/09/2023    Information request response              CB (RPEQ 19190)       AF (RPEQ 5691)

      C       26/08/2024    OPW24/0103 Information request response
                                                                      CB (RPEQ 19190)       AF (RPEQ 5691)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                           36 & 38 DUKE STREET, SUNSHINE BEACH

Page 3

TABLE OF CONTENTS
        INTRODUCTION ....................................................................................................................... 1
         1.1        OBJECTIVE & SCOPE ....................................................................................................... 1
         1.2        OPW INFORMATION REQUEST ITEMS ............................................................................ 1
         1.3        MCU INFORMATION REQUEST ITEMS ............................................................................ 3
        SITE CHARACTERISTICS ............................................................................................................ 4
         2.1        LOCATION....................................................................................................................... 4
         2.2        TOPOGRAPHY & DRAINAGE ........................................................................................... 4
        STORMWATER QUANTITY ........................................................................................................ 7
         3.1        LAWFUL POINT OF DISCHARGE ...................................................................................... 7
         3.2        STORMWATER DISCHARGE STRATEGY ........................................................................... 7
         3.3        RATIONAL METHOD CALCULATION ................................................................................ 7
         3.4        PRE-DEVELOPMENT SITE XP-STORM .............................................................................. 8
                    3.4.1           CATCHMENT DATA ....................................................................................... 8
                    3.4.2           RAINFALL DATA ............................................................................................ 8
                    3.4.3           HYDROLOGICAL LOSSES ............................................................................... 8
                    3.4.4           BX FACTOR ................................................................................................... 8
                    3.4.5           EXISTING PEAK DISCHARGE .......................................................................... 8
         3.5        POST-DEVELOPMENT SITE XP-STORM............................................................................ 9
                    3.5.1           CATCHMENT DATA ....................................................................................... 9
                    3.5.2           RAINFALL DATA .......................................................................................... 10
                    3.5.3           HYDROLOGICAL LOSSES & BX FACTOR ....................................................... 10
                    3.5.4           DETENTION TANK ....................................................................................... 10
                    3.5.5           POST-DEVELOPMENT PEAK DISCHARGE .................................................... 10
                    3.5.6           DETENTION TANK RESULTS ........................................................................ 11
         3.6        DOUGLAS LANE ROAD FLOW CALCULATION ................................................................ 12
                    3.6.1           PEAK FLOW CALCULATION ......................................................................... 12
                    3.6.2           ROAD CAPACITY CALCULATION .................................................................. 12
        STORMWATER QUALITY ........................................................................................................ 13
         4.1        CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT ............................... 13
                    4.1.1           INTRODUCTION .......................................................................................... 13
                    4.1.2           POLLUTANTS .............................................................................................. 13
                    4.1.3           WATER QUALITY OBJECTIVES ..................................................................... 13
                    4.1.4           STORMWATER QUALITY MANAGEMENT STRATEGY .................................. 14
                    4.1.5           MONITORING & MAINTENANCE ................................................................ 14
                    4.1.6           RESPONSIBILITY & REPORTING ................................................................... 14
         4.2        OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT .................................. 15
         4.3        WATERWAY STABILITY MANAGEMENT ........................................................................ 15

SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                                      36 & 38 DUKE STREET, SUNSHINE BEACH

Page 4

        CONCLUSION & RECOMMENDATIONS ................................................................................... 16
        DISCLAIMER .......................................................................................................................... 17
        APPENDICES .......................................................................................................................... 18

   Appendix A – Existing Site Survey & Proposed Site Plans
   Appendix B – Spreadsheet Calculations
   Appendix C – XP-STORM Summary
   Appendix D – Stormwater Catchment Plans




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                                  36 & 38 DUKE STREET, SUNSHINE BEACH

Page 5

          INTRODUCTION
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based
Stormwater Management Plan (“SBSMP”) for the proposed development at 36 & 38 Duke Street,
Sunshine Beach (“site”). The material change of use approval is MCU23/0070. The operational works
application reference is OPW24/0103.

The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal
is for a mixed-use development comprising the existing tenancy fronting Duke Street and five residential
apartments developed above. Refer to Appendix A for the survey of the existing site and for an extract
of the approved development plans.

This revision (Revision C) provides responses to Council Information Request associated with
OPW24/0103 dated 12th August 2024. Refer to Section 1.2.


1.1      OBJECTIVE & SCOPE
The design objectives for this report are:
     Nominate the lawful point of discharge.
     Ensure post-development peak flow rates are mitigated back to the pre-development peak flow
      rates via onsite detention.
     Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy (2017)
      is applicable for the site.

The scope of investigations undertaken for this report is as follows:
     Nominate lawful point of discharge.
     Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis
      includes the sizing of onsite detention to achieve peak flow mitigation.
     Provide commentary regarding possible performance-based stormwater quality management
      strategies for the operational phase of the development.


1.2      OPW INFORMATION REQUEST ITEMS
Issue – Increase in Rainfall Intensity
It is unclear if the management of stormwater, particularly available detention volume, has been
designed to allow for a 20% increase in rainfall intensity by the year 2100 in accordance with
Performance Outcome 2 of The Noosa Plan 2020 – Water Quality and Drainage Code.

Information Required
    1. Provide additional detail demonstrating that a 20% increase in rainfall intensity has been
       incorporated into the sizing of the proposed detention tank (i.e., detention volume). The
       additional detail must be certified by a suitably qualified person (RPEQ).

RESPONSE:
The detention tank design has been revised to allow for a 20% increase in rainfall intensity by the year
2100. Refer to Section 3.5.


SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                       36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |1

Page 6

Issue – Inlet Connections to Detention Tank
Council has identified the following items of JFP’s Drainage Layout Plan (D02, Rev. A) that require further
clarification:
     a. The outlet of the ‘grated inlet’ in the carpark is to be connected to the detention tank. It is
          unclear how the connection into the detention tank is to be constructed.
     b. A ‘45O bend’ is annotated downstream of structure 1/A, however a 90O right-hand bend is
          shown. The hydraulic performance and future maintenance of a 90O righthand bend is of
          concern.
     C. Catchment D3 is to be directed to structure 3/A. It is unclear how this landscaped catchment
          area on the Douglas Lane level is to be directed down to structure 3/A on the Duke Street level.

Information Required
    2. Provide additional detail addressing the above concerns. The additional detail must be prepared
       by a suitably qualified person (RPEQ), and include but not be limited to:
            a. An amended detention tank detail and section detailing the inlet connection from
                structure 1/A;
            b. A comment by the certifying engineer clarifying that a 45O bend will be installed or that
                a 90O right-hand bend is suitable (hydraulically, maintenance); and
            C. Demonstrate how the Catchment D3 (landscaped area) will be directed between the
                Douglas Lane and Duke Street levels.
RESPONSE:
    a. A connection from the car park grated inlet (1/D) to detention tank is now shown operational
       works drawing no. M3024E-D02, Rev B (not attached to this report). The grated inlet 1/D is
       located on Douglas Lane level at RL 33.86 while the detention tank is located on Duke Street level
       and tank IL is 30.10m AHD. Additional details are to be provided the building hydraulic
       consultant.
    b. The design plans have been amended to show two 45-degree bends.
    c. Flows from Catchment D3 are to flow to inlet 3/A via piped drainage constructed within building
       works. Design of this piped drainage forms part of building hydraulic works. Catchment D3 is the
       landscaped planter area situated on Douglas Lane level at RL 33.86 while structure 3/A is on
       Duke Street level at RL 30.26m AHD. an upper-level outdoor area. Relevant notes have been
       added to operational works drawing no. M3024E-D01, Rev B (not attached to this report).




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                         36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |2

Page 7

1.3       MCU INFORMATION REQUEST ITEMS
Issue – Stormwater Drainage
The submitted documentation does not include sufficient information for Council to assess how
stormwater generated by the development will be controlled, collected, and discharged.
 It is unclear what the proposed structure downstream from the proposed detention tank is and how
    it will integrate into the proposed drainage system (indicated by a blue circle).
 It is unclear how the proposed detention tank overflows during events up to, and including, a 1%
    AEP event (volume, discharge rate).
 It is unclear how the infiltration outlet of the detention tank will operate. Given the large catchment
    area of the detention tank, Council is concerned the soil may become oversaturated and the
    filtration rate of the soil will reduce which may adversely affect the overall drainage system and the
    structural elements of the development.
 It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event.
    Council recognise that this field inlet serves both the overflow from the detention tank and a small
    catchment area. Council is concerned that during events up to, and including, a 1% AEP event this
    pit may surcharge and direct additional runoff on to the footpath in the road reserve.
 The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate
    higher than 25 l/s during a 1% AEP event.

Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a
suitably qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that
the stormwater system is conceptually functional.


RESPONSE:
The following responses are provided for each dot point raised:
     The ‘blue circle’ is a manhole/roofwater pit. It conceptually shows a junction at which drainage pipes
      change direction. The concept plans have been amended and further details can be provided during
      detailed design as required.
     The outflow from the tank is controlled via a 75mm diameter orifice. It limits 1% AEP site discharge
      to 25L/s as requested in dot point #5. An overflow weir is proposed at RL 33.11m AHD to allow
      overflow.
     No infiltration is proposed. All outflows are directed to Duke Street kerb and channel.
     Runoff from a majority of Catchment D3 will be collected by building’s roofwater system. The
      proposed field inlet in Catchment D3 has been amended to a roofwater pit and it can be provided
      with a bolt down cover so that it will not surcharge. The outflow pipe from the detention tank will
      operate under head. This is consistent with standard building hydraulic design.
     The discharge rate from site has been limited to 25L/s in a 1% AEP storm event. This has been
      achieved by increasing detention volume and limiting outflows via 75mm diameter orifice.
      Appropriate screens can be incorporated in detail design to minimise blockage of this orifice. Any
      additional requirements can be conditioned.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                          36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |3

Page 8

          SITE CHARACTERISTICS

2.1      LOCATION
The site is in the Noosa Shire Council local government area. The site has real property descriptions Lot
370 & 371 on RP48111 – more commonly known as 36 & 38 Duke Street, Sunshine Beach. It has frontage
to Duke Street to the south and Douglas Lane to the north; and currently contains a restaurant fronting
Duke Street. Refer to Figure 1 for aerial view.

The site is not identified to be affected by flooding or tidal influence.




                                           Site




                             Figure 1 – Site Location (Source: Nearmap, August 2022)


2.2      TOPOGRAPHY & DRAINAGE
The site falls toward Duke Street at an average grade of 10%. A site visit was undertaken on 26th July
2022, and the following drainage patterns were observed.
     The existing site appears to discharge roofwater to Duke Street via two kerb adapters located on
      high side and low side of the site. Refer to Figure 2 and Figure 3.
     No existing stormwater infrastructure was observed in the rear of the site. Surface flows from the
      rear is expected run down the pathway adjacent to the existing building. Refer to Figure 4.
     A road flow calculation has been undertaken on Douglas Lane to confirm up to and including a 1%
      AEP external flows do not enter the site. Refer to Section 3.6.



SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                            36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |4

Page 9

                                          Existing
                                          restaurant
                                          on site




                     Existing kerb
                     adapter, high side




                                    Figure 2 – Existing High Side Kerb Adapter




                                Existing kerb
                                adapter, low side




                                    Figure 3 – Existing Low Side Kerb Adapter




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                               36 & 38 DUKE STREET, SUNSHINE BEACH
                                                       P a g e |5

Page 10

                                                                          Existing
                                                                          building




                                   Existing
                                   pathway




                              Figure 4 – Rear of the Site, viewed from Douglas Lane




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                             36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |6

Page 11

           STORMWATER QUANTITY

3.1        LAWFUL POINT OF DISCHARGE
The proposed lawful point of discharge is the kerb & channel on Duke Street. Currently there are two
kerb adapters fronting the site. It is proposed to utilise only the low side kerb adapter and upgrade as
required. The 1% AEP peak flow rate has been limited to 25L/s.


3.2        STORMWATER DISCHARGE STRATEGY
The fraction imperviousness increases due to the proposed development. To mitigate increase to peak
discharge rates an on-site detention tank is proposed. The tank is proposed to be located on Duke Street
level and tank IL is 30.1m AHD.

It is proposed to collect and convey a majority of the site runoff into the detention tank. Mitigated flows
are to be discharged on to Duke Street kerb & channel.


3.3        RATIONAL METHOD CALCULATION
The Rational Method Calculation has been undertaken for the pre-development site. Table 1 presents
the Rational Method catchment parameters. Refer to Drawings No. M3024E_DA1_SK01 in Appendix D
for the catchment plan. The fraction imperviousness has been estimated from the detailed survey
(included in Appendix A). The C10 has then been determined in accordance with Table 4.5.3 of the QUDM
(2016) and the time of concentration (Tc) based on the Standard Inlet Time in accordance with Table
4.6.2 of the QUDM (2016).

                                Table 1 – Rational Method Calculation Parameters
                                                      Fraction
      Catchment              Area (ha)                                       C10                 Tc (mins)
                                                     Impervious
           E1                  0.0486                   57%                  0.82                     8

Site specific 2016 rainfall intensities were obtained from Bureau of Meteorology (BOM). Table 2 presents
the Rational Method peak flow rates. Further details included in Appendix B.

                                      Table 2 – Rational Method Peak Flows
                                              Rational Method Peak Flows (m³/s)
                 63% AEP       39% AEP        20% AEP        10% AEP    5% AEP          2% AEP         1% AEP
      E1          0.010          0.013         0.018          0.022      0.026           0.033            0.037




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                             36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |7

Page 12

3.4      PRE-DEVELOPMENT SITE XP-STORM
A peak flow analysis has been undertaken using the XP-STORM version 2024.2 for sizing the detention
tank. The pre-development site was modelled using a single node and peak flows verified against the
Rational Method Calculation.

3.4.1 CATCHMENT DATA

Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.

                                   Table 3 – Pre-Development Catchment Data
                                                                     Fraction             Vectored Slope
                  Catchment                Area (ha)
                                                                    Impervious                 (%)
                     E1                     0.0486                     57%                     10%

3.4.2 RAINFALL DATA

The site specific 2016 rainfall intensities obtained from BOM and a 20% increase in rainfall intensity has
been adopted to represent the year 2100. The rainfall intensities have been coupled Australian Rainfall
& Runoff (AR&R) 1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs
in XP-STORM.

3.4.3 HYDROLOGICAL LOSSES

The following initial loss, continuous loss and Manning’s n values have been adopted for the hydrological
modelling. They are within the ranges recommended in the AR&R (1987) for Southeast Queensland.

                                            Table 4 – Hydrological Losses
                                                                             Continuing Loss
         AEP                   Area Type         Initial Loss (mm)                                   Manning’s n
                                                                                (mm/hr)
                          Impervious Area                    0                     0                       0.014
      63% to 1%
                           Pervious Area                   15                      2                       0.07

3.4.4 BX FACTOR

A Bx factor of 1.8 has been used across all AEPs modelled.

3.4.5 EXISTING PEAK DISCHARGE

The XP-STORM hydrology was run for the standard AEPs from a 63% AEP to a 1% AEP and 15 to 180-
minute standard durations. Table 5 presents pre-development site peak flows using the current rainfall
intensities.

                       Table 5 – Pre-Development Peak Flows (Current Rainfall Intensities)
                                                 Pre-Development Peak Flows (m³/s)
                                                     Current Rainfall Intensities
                     63% AEP       39% AEP        20% AEP    10% AEP        5% AEP             2% AEP         1% AEP
  Rational Calc        0.010         0.013           0.018          0.022         0.026         0.033         0.037
    XP-STORM           0.012         0.017           0.021          0.027         0.032         0.034         0.038
      Variance        +0.002        +0.004           +0.003         +0.005       +0.006        +0.001         +0.001


SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                  36 & 38 DUKE STREET, SUNSHINE BEACH
                                                       P a g e |8

Page 13

The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the peak
flow and detention tank analysis for this site.

Table 6 presents the pre-development peak flows with a 20% increase in rainfall intensities for the year
2100.

                          Table 6 – Pre-Development Peak Flows (2100 Rainfall Intensities)
                                                Pre-Development Peak Flows (m³/s)
                                                     2100 Rainfall Intensities
                     63% AEP        39% AEP      20% AEP    10% AEP        5% AEP            2% AEP       1% AEP
    XP-STORM           0.016         0.021           0.027         0.034        0.040         0.042        0.046



3.5      POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA

Table 7 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in Appendix
D presents the catchment delineation.

                                   Table 7 – Post-Development Catchment Data
                                                                    Fraction            Vectored Slope
                 Catchment                Area (ha)
                                                                   Impervious                (%)
                     D1                    0.0335                    100%                    10%
                     D2                    0.0121                     66%                    10%
                     D3                    0.0030                    100%                    10%
                    Total                  0.0486                     92%                    10%

The following catchment arrangements have been modelled:
     5% AEP from catchment D1 has been modelled to enter the detention tank. Larger flows bypass
      detention.
     1% AEP from catchment D2 has been modelled to enter the detention tank.
     Catchment D3 bypasses the detention tank.

Figure 5 presents the XP-STORM layout for the post-development site.




                                  Figure 5 – Post-Development XP-STORM Layout




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e |9

Page 14

3.5.2 RAINFALL DATA

As per the pre-development scenario and includes the 20% increase in rainfall intensities.


3.5.3 HYDROLOGICAL LOSSES & BX FACTOR

As per the pre-development scenario.


3.5.4 DETENTION TANK

Table 8 presents the detention tank parameters modelled. Refer to Appendix C for the stage vs area
relationship. Re-analysis will be required if the stage-area relationship is significantly altered.

                                         Table 8 – Detention Tank Details
                         Detention Parameter                                  Value
                     Surface Area (m²)                                         8.5
                     Volume (m³)                                              20.4
                     Depth (m)                                                 2.4
                     Tank IL (m AHD)                                          30.1
                     Orifice Outlet                            80mm dia at IL 30.1m AHD
                     Weir Outlet                            1500mm weir at RL 32.43m AHD



3.5.5 POST-DEVELOPMENT PEAK DISCHARGE

The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard durations. Table
9 and Table 10 present the peak flow results.

                           Table 9 – Pre & Post-Development Peak Flows (XP-STORM)
                                                         Peak Flow Results (m³/s)
                       63% AEP        39% AEP        20% AEP         10% AEP         5% AEP       2% AEP        1% AEP
     Post-Dev.
   (2100 rainfall        0.011         0.014          0.016           0.018           0.020        0.022         0.024
    intensities)
      Pre-Dev.
   (2100 rainfall        0.016         0.021          0.027           0.034           0.040        0.042         0.046
    intensities)
     Variance           -0.004        -0.008         -0.011          -0.015           -0.020       -0.020        -0.021




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                      36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e | 10

Page 15

                            Table 10 – Pre & Post-Development Peak Flows (XP-STORM)
                                                         Peak Flow Results (m³/s)
                        63% AEP       39% AEP        20% AEP         10% AEP   5% AEP       2% AEP        1% AEP
     Post-Dev.
   (2100 rainfall         0.011         0.014         0.016           0.018     0.020        0.022         0.024
    intensities)
      Pre-Dev.
  (current rainfall       0.012         0.017         0.021           0.027     0.032        0.034         0.038
    intensities)
     Variance             -0.001        -0.003       -0.005          -0.009     -0.012       -0.012       -0.0013

The above results demonstrate that the post-development peak flow with a 20% increase in rainfall
intensities are mitigated against the pre-development peak flows currently and in the year 2100.
Moreover, the 1% AEP post-development flow does not exceed 25L/s (0.025m³/s).


3.5.6 DETENTION TANK RESULTS

Table 11 presents the detention tank performance. As can be seen, the 1% AEP is within the tank volume
of 20.4m³.

                                          Table 11 – Detention Tank Results
                      63% AEP       39% AEP       20% AEP        10% AEP       5% AEP       2% AEP        1% AEP
   Tank Inflow
                        0.021         0.026          0.032           0.037     0.041         0.042         0.044
      (m³/s)
  Tank Outflow
                        0.012         0.014          0.016           0.018     0.020         0.022         0.024
      (m³/s)
    Detention
                         6.2            8.2          10.5            12.9       15.2         17.4           19.7
  Volume (m³)
    Depth of
                         0.73          0.97          1.24            1.51       1.78         2.05           2.32
    Water (m)
    Water RL
                        30.83         31.07          31.34           31.61     31.88         32.15         32.42
     (m AHD)
Note: Invert of detention tank is 30.10m AHD




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e | 11

Page 16

3.6      DOUGLAS LANE ROAD FLOW CALCULATION
A road flow capacity assessment has been undertaken to confirm that the external flows on Douglas
Lane do not enter the site.

3.6.1 PEAK FLOW CALCULATION

Refer to Figure 6 for the external catchment delineation and Table 12 for peak flow rates calculated
using the Rational Method. Refer to Appendix B for additional details.




                                                                 External
                                                                 Catchment
                                                                 0.13ha




                                                          Manning’s
                                                          Section



                                  Figure 6 – External Catchment to Douglas Lane

                                     Table 12 – External Catchment Peak Flows
     Scenario          63% AEP       39% AEP         20% AEP         10% AEP       5% AEP       2% AEP        1% AEP
   Current Peak
                         0.030         0.040          0.055           0.068         0.081        0.103         0.113
    Flow (m³/s)
    2100 Peak
                         0.036         0.048          0.066           0.081         0.097        0.123         0.136
    Flow (m³/s)

3.6.2 ROAD CAPACITY CALCULATION

The Manning’s Equation has been used to undertake a road flow calculation on Douglas Lane. Refer to
Figure 6 above for the cross-section location. The longitudinal grade on Douglas Lane fronting the site is
approximately 8% and a surface roughness value of 0.015 was adopted for the pavement.

The results in Table 13 show the flows do not overtop the kerb, which is approximately 120mm high.
Refer to Appendix B for further calculation details.

                                     Table 13 – Manning’s Equation Calculation
                         1% AEP Flow           Max Road Flow
      Scenario                                                                Velocity (m/s)       DV Product (m²/s)
                            (m³/s)              Depth (mm)
   Current Peak
                             0.113                      42                        1.54                    0.07
    Flow (m³/s)
    2100 Peak
                             0.136                      45                        1.65                    0.07
    Flow (m³/s)

SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                    36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e | 12

Page 17

         STORMWATER QUALITY

4.1      CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT
4.1.1 INTRODUCTION

This section provides conceptual stormwater quality management strategies for construction phase.
These strategies are applicable for all stages of the development. No modelling has been undertaken for
the construction phase stormwater quality management. Detailed Erosion and Sediment Control Plans
will be prepared during detailed design phase and implemented during construction.

4.1.2 POLLUTANTS

Typical pollutants generated during the construction phase of an urban development are shown in Table
14. These based on Table C4.1 BCC’s Subdivision & Development Guidelines Part C Section 4.1.1 (2008).

                                     Table 14 – Construction Phase Pollutants
Pollutant          Potential Source
Litter             Paper, construction packaging, food packaging, cement bags, off-cuts.
Sediment           Unprotected exposed soils and stockpiles during earthworks and building works.
Hydrocarbons Fuel/oil spills, leaks from construction equipment, and temporary car park areas.
Toxic
             Cement Slurry, asphalt primer, solvents, cleaning agents, and washwaters etc.
Materials
pH altering
             Cement slurry, acid sulfate soils, and washwaters
substances

4.1.3 WATER QUALITY OBJECTIVES

It is recommended that the amount of runoff crossing and leaving the site is kept to a minimum during
the construction phase to restrict soil erosion and mobilisation of sediments and pollutants through and
off the site. Table 15 presents an extract from Table A, Appendix 2 of the State Planning Policy (2017)
objectives for construction phase stormwater quality management

                               Table 15 – Construction Phase Performance Criteria
 Issue                 Desired Outcomes
                       1. Stage clearing and construction works to minimise the area of exposed soil at
                           any one time.
                       2. Effectively cover or stabilise exposed soils prior to predicted rainfall.
 Erosion control
                       3. Prior to completion of works for the development, and prior to removal of
                           sediment controls, all site surfaces must be effectively stabilised using
                           methods which will achieve effective short-term stabilisation.
                       1. Direct runoff from exposed site soils to sediment controls that are appropriate
                           to the extent of disturbance and level of erosion risk.
                       2. All exposed areas greater than 2500m² must be provided with sediment
 Sediment
                           controls which are designed, implemented and maintained to a standard
 Control
                           which would achieve at least 80% of the average annual runoff volume of the
                           contributing catchment treated (i.e. 80% hydrological effectiveness) to
                           50mg/L Total Suspended Solids (TSS) or less, and pH in the range (6.5–8.5).



SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                              36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 13

Page 18

4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY

An erosion and sediment control management plan that is endorsed by an CPESC or RPEQ will be
prepared and implemented during construction phase. Erosion and sediment control measures may
include, but not limited to, devices such as:
   catch drains,
   diversion drains,
   silt fences, and
   construction entry/exit pads.

4.1.5 MONITORING & MAINTENANCE

The general requirement of monitoring during the construction phase will be:

   Work activities to be restricted to designated construction areas.
   Earthworks and site clearing to be undertaken in accordance with the Erosion and Sediment Control
    Plans prepared during detailed design phase.
   Erosion and sediment control devices to be constructed in accordance with the Erosion and
    Sediment Control Plans prepared during detailed design phase.
   Inspect sediment fences and erosion and sediment control structures/devices on a weekly basis as
    well as after any rain event exceeding 25mm in 24hrs.
   Stormwater discharges from the site are not to have any adverse effect on the downstream
    environment.
   Monitor and record of the performance of the drainage control devices including water quality
    testing where required.
   Any failure in the stormwater system to be immediately rectified to prevent uncontrolled discharge
    from the site.
   Any failure to the stormwater system causing damage to surroundings should implement immediate
    remedial work to the damaged area.

4.1.6 RESPONSIBILITY & REPORTING

   The contractor shall be responsible for monitoring the performance of all drainage control and
    erosion and sediment control devices.
   Records of any failures to devices should be kept and reported to the Construction Manager.
   Regular inspections of the devices shall be reported to the Construction Manager.
   Inspections of the devices after heavy rainfall shall be reported to the Construction Manager.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                       36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 14

Page 19

4.2      OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT
The development footprint is 486m² which is less than 2,500m². Therefore, the site does not trigger
compliance with the State Planning Policy (2017) for stormwater quality management and meeting the
required Water Quality Objectives (WQOs). The development is also not discharging into ‘High Ecological
Value’ waters. On that basis, no conventional stormwater improvement devices such as bioretention
are proposed and MUSIC modelling has not been undertaken for the site.

While no active stormwater treatment measures such as bioretention is proposed, the site will have
some passive stormwater quality treatment measures. For instance, most of the site is covered by the
building footprint and most of the building runoff is directed into a detention tank. Most of the gross
pollutants such as tree leaves and visible rubbish will be captured in the roof gutters. Smaller gross
pollutants and Suspended Solids that travel through the roof drainage system will enter the detention
tank where runoff will pond for a period of time allowing the pollutants to settle into the bottom of the
bank. Periodic maintenance of the roof drainage system and the detention tank will ensure most of the
gross pollutants and Suspended Solids are captured within the site prior to discharging into the
downstream drainage network.

The landscaping proposed within the site will also provide water quality benefit to runoff that is directed
to them. The vegetation will capture primary pollutants, and the soil underneath will provide some level
of nutrient treatment.


4.3      WATERWAY STABILITY MANAGEMENT
The waterway stability management in accordance with the State Planning Policy (2017) is not applicable
for this site, as the site flows are connected to an urban underground drainage network which then
discharges into tidal waters.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                         36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 15

Page 20

         CONCLUSION & RECOMMENDATIONS
JFP Urban Consultants Pty Ltd has prepared this Site Based Stormwater Management Plan for the
proposed development at 36 & 38 Duke Street, Sunshine Beach. The analyses presented in this report
achieve the following outcomes:

The outcomes of the stormwater analyses are:

   The proposed lawful point of discharge is the kerb & channel on Duke Street and 1% AEP discharge
    is 25L/s.
   20.4m³ of on-site detention is proposed. This volume has allowed for a 20% increase in rainfall
    intensity by the year 2100.
   Douglas Lane has adequate capacity to convey 1% AEP external catchment flows so they do not
    enter the site.
   Erosion & sediment control measures are to be implemented in the construction phase.
   As the site area is less than 2500m² the development does not trigger the State Planning Policy
    (2017) for operational phase stormwater quality management and therefore stormwater quality
    treatment devices such as bioretention is not required. The site’s internal drainage system and the
    landscaping areas will provide some level of stormwater quality treatment, particularly for the gross
    pollutants and Suspended Solids.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                       36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 16

Page 21

         DISCLAIMER
This report has been prepared for the purpose and exclusive use of Cambooya Pty Ltd as an investigation
into the stormwater management issues related for the proposed development of the land described in
the report. The information presented in this report is not to be used for any other purpose or by any
other person or corporation.

JFP Urban Consultants Pty Ltd accepts no responsibility for any loss or damage suffered howsoever
arising to any person or corporation who may use or rely on this report without further input and/or
advice from JFP Urban Consultants Pty Ltd.

The investigations, calculations, analysis and recommendations presented in this report rely on
information sourced from third-parties. JFP Urban Consultants Pty Ltd accepts no responsibility for the
accuracy of the information sourced from third-parties.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                      36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 17

Page 22

         APPENDICES

   Appendix A – Existing Site Survey & Proposed Site Plans
   Appendix B – Spreadsheet Calculations
   Appendix C – XP-STORM Summary
   Appendix D – Stormwater Catchment Plans




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                  36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e | 18

Page 23

APPENDIX A
EXISTING SITE SURVEY & PROPOSED
SITE PLANS




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C   36 & 38 DUKE STREET, SUNSHINE BEACH

Page 24

 

 

[5 STORMWATER GRATE
6) STORMWATER MANHOLE

G

SEWER MANHOLE
ELECTRICITY JUNCTION BOX
TELSTRA PIT
WATER METER
HYDRANT
STOP VALVE
POWER POLE

UIGHT POLE
BENCH MARK

exregiz®

®

 

 

 

 

 

LINETYPE LEGEND

BANK BOTTOM
BANK TOP
BATTER
CROWN
currer
= GRAVEL
‘BITUMEN
KERB
CONCRETE
ELECTRICAL
WATER
awiPoot
SEWER
DRAINAGE
TREELINE
GARDEN

T TELSTRA
———  sutone
—------ PAVING:
POE RETAINING WALL

WALL

a CUAROR AL
Fence
Boy
‘MAJOR CONTOUR
MINOR CONTOUR,

 

 

 

 

 

 

cP

SP120994

   
  
  
    
  
  
  
  
  
 
  
 
  
     
 

0 2 4 6 8

cP

SP176872

  
  
  

ES

   

ROR

RS
SS

SOS
Re
Ss

ey
>
YY
AS
8
‘

30

us

10

Ss
x

12

Scale 1:200 - Lengths are in Metres

14

 

 

 

 

DENOTES GRAVEL

DENOTES CONCRETE

DENOTES BUILDING

DENOTES aITUMEN

DENOTES PAVING

 

 

 
 
 
  
  
 
    
    

MAX WATTERSON
+ASSOCIATES

CONSULTING SURVEYORS
& PLANNERS

12. Maple Street

PO Box 639

Cooroy Qld 4563,

Ph. (07) 54426121

Fax. (07) 54425125

Email [email protected]

 

Client:

CAMBOOYA
PTY LTD

 

Project:

DETAIL AND
CONTOUR PLAN OF
LOTS 370 & 371 ON
RP48111.

 

LOCAL GOVT: NOOSA S.C.

LOCALITY: SUNSHINE BEACH

 

 

 

 

 

Scale: 1:200 Plan 4 of 4
Datum: AHD Date: 31-08-23
Origin: pee27 .
Cont 2s . Ref.
font.nt: 0.25m
22-5703AB
NOTE:

This plan has been prepared for building
design purposes only.

Underground services not located except
where evident on surface.

 

 

Page 25

 

  

 

   

E> >
SS” ; 2 op
: ho - \DOUGLAS LANE

 

 

1020p 710, p 190
aT rt - t

   

  
     

7 : ZONE TO BE LEESTHAN 0.6m
__ 2411001 BINS. = . = HIGH & NO

QUTFLOW

  

/—~ SCREEN FOR
/ ~ MECHANICAL
EXHAUST DUCT

C
\_ EXIENT OF ENTRY RAMP

SHOWN DASHED

CARPARK

 
 

rae) |

 
 

GROUND-FLOOR PUBLIC-LOBBY

_ AMENITI

   

 

Pool ste pL SAELL
MB2/H} suastesie SUBSTRATE

   
  

   
  
 

 

TENAN

   
 
   
 
 

01

 

POOL PUMP & POOL PUMP &
FILTER ti

 

La
(BADE
PLANTER

 
 
 

Hi
HETIL 30

OUTDOOR DININGi i ittittteriiit
TLAT EEE
LJSCUUUUUENE OUD

“A

 
 

OUTDOOR DINING

OUTDOORBUSINESS AREA
em

   
 

AWNING BELOW 50

 

 

 

 

 

 

 

 

NOOSA COUNCIL
ai an APPROVED PLAN
01 FLOOR PLAN DUKE STREET 02 FLOOR PLAN LEVEL 1 / DOUGLAS LANE MCuU23/0070 18 APR 2024

1:100 1:100

 

 

 

 

 

 

PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ce ten wae BUCKBURNEJ/CKSON
36 - 38 DUKE STREET, SUNSHINE BEACH a eee

‘a mode sep en nna. 1 059 ‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid
Document Set ID: 22816400
Version: 1, Version Date: 16/02/2024

 

Page 26

NEN CY, OY aN
STEP SP wy ey

 

1080_fy 12070 Jp 1938
7 7 4
5100, om

       
   

 

 

 

 

 

 

 

 

 

 

 

 

12.0m HEIGHT LIMIT PROJECTION
EXTENT ETAL ROOF ABOVE NATURAL GROUND
iy ack “oa
weer “ =
inf | Os oz
44H i
tf L bee. at
d O LIFT OVER | =
5 RUN a
||| |e |||
Sp om tte 4 &
a
—

 

 

®
O

 

 

 

 

 

 

 

 

 

 

N
@»>
7

yp

Z wr
yas

7
je

 

 

 

®
6 6

tS .
L110 5520 lp 5500 L
ope 82150 jp 1938
7 7

 

®

 

 

 

 

 

 

NOOSA COUNCIL

oO
APPROVED PLAN

01 ROOF PLAN 02 HEIGHT PLANE PROJECTION MCU23/0070 18 APR 2024

1:100 1:50

 

 

 

 

 

 

PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ce tena BUCKBURNEJ/CKSON
36 - 38 DUKE STREET, SUNSHINE BEACH ROOF PLAN & HEIGHT PLANE ae

7252-DA08

ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT

‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid

 

Page 27

 
 
 
   
 
  
 
 
      
  
  
 
    
  

 

       
 

 

 

  
  
   
   
 
   
   
  
          
      
  

   
   
   
   
      
 
   
   
 

 

 

 

 

| exaust oucriINe To Be le zl le
3|__ Wore hour Ane is 5 is
lees e gi 2
g -_ 3 5-——_ 3
Z| g Z| Bi ig
| "2 | | ES pss |
DOUGLAS | ~ eS | DUKE DOUGLAS | ae | DUKE
LANE | __ 12m HEIGHT Lia oasieD | STREET LANE | fom, LIFT ~ SS 7 PmneIGHT LMT oMsHED | STREET
~— OVERRUN TO | a a i nc,
i som, LIET OVERRUN TO PME cares | | FUTURE DETAIL an |
FUTURE DETAIL ere STAR LID
008 ! | 008 | |
RRL GZ 960 RL 42960 T — T ae
| |
soReen To cONcEAL | 4 l
EXHAUST DUCTING i |
LEVEL LeveL
R000 Se mc rtrt~<;3;3;CMTCté<;7 CS TOT RL 40.060 a
| |
HARDSTAND LEVELS TO CIVIL. | 5 l HARDSTAND LEVELS TO CIVIL
ENGINEER'S DRAWING. [| Ree | ENGINEER'S DRAWING. I
SPLASH PROOF
LEVEL? __ ee 4) ee LEVEL? __ ee fe
RLI6966 RL36766
| | |
PLANTER
PLANTER g |
CAR PARKING concsere CAR PARKING Pian
AWNING OVER ‘FOOTPATH
DOUGLAS ‘FOOTEAIH DOUGLAS,
‘RL 33.860 a ‘RL 33.860 = =

ENCLOSED,

  
  
      
 
 
 

nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER'S DETAIL

 
 
  

 
   
 
 
  

‘nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER’S DETAIL

 

   
    

   
   

  

TENANCY

[LAYOUT AS PER 7252_DAIa]

TENANCY

LAYOUT AS PER 7252_DA13]

‘nor, TANKING &
WATERPROOF

‘MEMBRANE To CIVIL
ENGINEER'S DETAIL

‘nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER'S DETAIL

FOOTPATH

   

FOOTPATH

           
    
    

   
 

NATURAL GROUND LINE DASHED

01 A SECTION 02 B SECTION

 

    

    

PROPOSED GROUND LINE

y,

 

  
 
 
 
 
 
   
  
 
   
 
  
   
    
 
  

 

   
 
   

 

 

 

 

 

 

 

 

 

 

 

1:100 1:100
le
3
ig
5
8
|
DOUGLAS Se | DUKE
LANE cm = — — — "2m HEIGHT LT oASHED | STREET
eee ‘SLAB
| SLAB EXTENSION AS ——— Miia | Btzusionas
SUNSHADESOR LEE Sm j suiaberon
Roe OW o_O Se... ne ABEY LEVEL BELOW
aime i
F weraccess
| SUNSHADESOR LEVEL APT 03 +
wee | |
RL40.060 TE ne = 2 a — TO
i i
warupauey
| VENTILATED APT 01 \ 0 L
i Wer nceess H
| BALC
LEVEL? ge fo Po
cm HARDSTAND LEVELS TO CIVIL. =
ENGINEER'S DRAWING PLANTER
CAR PARKING | ms ver
LEVELS TO CIVIL ENGINEER'S DRAWINGS FOUIWATH

 

 

URS =—=—} TPOINT,
Sis SWS.

BATHROOM

 

      
  

   
    
  

  

 

 

 

   

S ~
GK NL TENANCY
Sy Sr cone CA ‘poate Loser (LATOUTAS PER 7252 0411 FOOTPATH
S YSGS: NATURAL GROUND
z ~ “ES TO CIVIL ENGINEER'S DETAIL S Ss ES | |_NATURAL GROUND
oune sracet SAS S -’RSXESTSA =~
Risin AS GS SPSS IRS, FATE SHE SR,
tes S S YUEYSYSYSIIES WON RRO
S&S YK SYK YSIS
KS K KS Ky KY SES racrsta cron ine YZ ey KS cy RY KS
SSAA AAARAADAKARAN IS

S
S

03 C SECTION

 

 

1:100

NOOSA COUNCIL
APPROVED PLAN
MCU23/0070 18 APR 2024

 

 

 

 

scale: 1:100@A1 1:200 @A3

PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ime ne BLICKBURNEJ/CKKSON

36 - 38 DUKE STREET, SUNSHINE BEACH eee

SECTIONS 7252-DA15

Document Set ID: 22816400
Version: 1, Version Date: 16/02/2024

‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid

Page 28

APPENDIX B
SPREADSHEET CALCULATIONS
   Rational Method Calculation – Site
   Rational Method Calculation – External Catchment (Douglas Lane)
   Manning’s Calculation – Douglas Lane




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                    36 & 38 DUKE STREET, SUNSHINE BEACH

Page 29

RATIONAL METHOD CALCULATION – SITE
 Catchment Details                      EXISTING SITE PROPOSED SITE

 Area (ha)                                 0.0486        0.0486
 Impervious Area (ha)                      0.0277        0.044
 Fraction Impervious (%)                    57%           92%
 1
  I60 (mm/hr)                              75.2           75.2
 C1                                        0.656          0.70
 C2                                        0.70           0.75
 C5                                        0.78           0.84
 C10                                       0.82           0.88
 C20                                       0.86           0.92
 C50                                       0.94           1.00
 C100                                      0.98           1.00




 Time of Concentration (min)
                                          Method                                      Tc
        Catchment
       EXISTING SITE        Standard inlet time, catchment slope ~14%                 8
      PROPOSED SITE         Standard inlet time, mostly paved/impervious areas        5




 Rainfall Intensities (mm/hr)
         Catchment            1yr ARI     2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
       EXISTING SITE            111         139       168          196      223      257       282
      PROPOSED SITE             125         158       193          227      259      301       333




 Stormwater Quantities (m3/s)
        Catchment           1yr ARI       2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
       EXISTING SITE          0.010        0.013     0.018        0.022    0.026    0.033     0.037
      PROPOSED SITE           0.012        0.016     0.022        0.027    0.032    0.041     0.045




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                            36 & 38 DUKE STREET, SUNSHINE BEACH

Page 30

RATIONAL METHOD CALCULATION – EXTERNAL
CATCHMENT (DOUGLAS LANE)
Catchment Detals
                                    External
                                   Catchment
Area (ha)                            0.1302
Impervious Area (ha)                 0.1042
Fraction Impervious (%)               80%
1
 I60 (mm/hr)                           75.2
C1                                     0.70
C2                                     0.74
C5                                     0.83
C10                                    0.87
C20                                    0.91
C50                                    1.00
C100                                   1.00

Time of Concentration (min)
            Catchment                                        Method                               Tc
        External Catchment         Standard inlet time, mostly paved/impervious areas              6

Rainfall Intensities (mm/hr)
               Scenario              1yr ARI     2yr ARI     5yr ARI   10yr ARI    20yr ARI    50yr ARI    100yr ARI
               Current                120.0          151.0   184.0       215.0       245.0       284.0       313.0
                 2100                 144.0          181.2   220.8       258.0       294.0       340.8       375.6

Stormwater Quantities (m3/s)
            Scenario                 1yr ARI     2yr ARI     5yr ARI   10yr ARI    20yr ARI    50yr ARI    100yr ARI
            Current                   0.030       0.040       0.055     0.068       0.081       0.103        0.113
              2100                    0.039       0.048       0.066     0.081       0.097       0.123        0.136




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                36 & 38 DUKE STREET, SUNSHINE BEACH

Page 31

MANNING’S CALCULATION – DOUGLAS LANE
              Cross Section Details                 1% AEP Flow (current rainfall)       1% AEP Flow (2100 rainfall)
   Point          CH         Z            n           wA        wP        n x wA          wA        wP       n x wA
     1           0.00      0.080        0.015
     2           0.00      0.000        0.015        0.00        0.04         0.00           0.00          0.04             0.00
     3           0.50      0.012        0.015        0.02        0.50         0.00           0.02          0.50             0.00
     4           1.31      0.027        0.015        0.02        0.80         0.00           0.02          0.80             0.00
     5           2.06      0.021        0.015        0.01        0.75         0.00           0.02          0.75             0.00
     6           2.61      0.018        0.015        0.01        0.56         0.00           0.01          0.56             0.00
     7           2.88      0.017        0.015        0.01        0.26         0.00           0.01          0.26             0.00
     8           3.50      0.073        0.015        0.00        0.29         0.00
     9           4.67      0.089        0.015                                            0.01              0.69           0.00
                                                      wA          wP         n x wA       wA                wP           n x wA
                                       TOTAL         0.073       3.207        0.001      0.086             3.618          0.001
           Slope (m/m)
               0.08                                    R           n           Q           R                 n             Q
                                                     0.023       0.015       0.113       0.024             0.015         0.136
                              Design Flow (m³/s)                 0.113                                     0.136
                                        WSL (m)                  0.042                                     0.045

                                     Results
                             Channel Flow (m³/s)                 0.113                                     0.14
                                   Velocity (m/s)                 1.54                                     1.58
                                 Max. Depth (m)                  0.042                                     0.04
                               DV Product (m²/s)                  0.07                                     0.07

       0.10
       0.09
       0.08
       0.07
       0.06
       0.05                                                                                          Surface

       0.04                                                                                          1% AEP Flow (current
                                                                                                     rainfall)
       0.03
                                                                                                     1% AEP Flow (2100
       0.02                                                                                          rainfall)

       0.01
       0.00
           0.00       0.50      1.00       1.50       2.00       2.50       3.00      3.50          4.00       4.50           5.00
                                                             Chainage (m)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                    36 & 38 DUKE STREET, SUNSHINE BEACH

Page 32

APPENDIX C
XP-STORM SUMMARY
   Pre-Development Site Discharge (XP-STORM hydrographs)
   Post-Development Site Discharge (XP-STORM hydrographs)
   Detention Tank Stage-Area-Volume
   Pre-Development Scenario Rainfall Intensities
   Post-Development Scenario Rainfall Intensities




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C           36 & 38 DUKE STREET, SUNSHINE BEACH

Page 33

PRE-DEVELOPMENT SITE DISCHARGE
(CURRENT RAINFALL INTENSITIES)




PRE-DEVELOPMENT SITE DISCHARGE
(20% INCREASED RAINFALL INTENSITIES)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C   36 & 38 DUKE STREET, SUNSHINE BEACH

Page 34

JFP URBAN CONSULTANTS ——
=

JFOP
~\ HUAI cy

POST-DEVELOPMENT SITE DISCHARGE
(20% INCREASED RAINFALL INTENSITIES)

 

Conduit Mitigated Outlfow from D3 to OUT
= = x= ee)
41Y_25min[Max 0.011] 2Y_25min[Max 0.014] 5Y_25min[Max 0.016] 10Y_25min[Max 0.018]
= —_ a]
20Y_25min[Max 0.020] 50Y_60min[Max 0.022] 400Y_60min[Max 0.025]
0.025
0.020
0.015
S
|O
ie
0.010
0.005
0.000 SSS S————_—_———
1 Tue 1AM 2AM 3AM
Jan 2019 Time

 

 

 

DETENTION TANK STAGE-AREA-VOLUME

DETENTION TANK
STAGE - AREA - STORAGE

 

RL(mAHD) Height (m) Area (m?) Area (ha) erate l Ale i Merete
0.00085

30.20 0.10 8.50 0.00085 0.850 09
30.30 0.20 8.50 0.00085 0.850 17
30.40 0.30 8.50 0.00085 0.850 26
30.50 0.40 8.50 0.00085 0.850 3.4
30.60 0.50 8.50 0.00085 0.850 43
30.70 0.60 8.50 0.00085 0.850 51

30.80 0.70 8.50 0.00085 0.850 6.0
30.90 0.80 8.50 0.00085 0.850 68
31.00 0.90 8.50 0.00085 0.850 77
31.10 1.00 8.50 0.00085 0.850 8.5
31.20 1.10 8.50 0.00085 0.850 9.4
31.30 1.20 8.50 0.00085 0.850 10.2
31.40 1.30 8.50 0.00085 0.850 144
31.50 1.40 8.50 0.00085 0.850 11.9
31.60 1.50 8.50 0.00085 0.850 12.8
31.70 1.60 8.50 0.00085 0.850 13.6
31.80 1.70 8.50 0.00085 0.850 14.5
31.90 1.80 8.50 0.00085 0.850 15.3
32.00 1.90 8.50 0.00085 0.850 16.2
32.10 2.00 8.50 0.00085 0.850 17.0
32.20 2.10 8.50 0.00085 0.850 17.9
32.30 2.20 8.50 0.00085 0.850 18.7
32.40 2.30 8.50 0.00085 0.850 19.6
32.50 2.40 8.50 0.00085 0.850 20.4

 

 

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH

Page 35

JFP URBAN CONSULTANTS

== We

URBANCONSULTANTS

CURRENT RAINFALL INTENSITIES

Duration 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
(minutes ) mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr

1 173 217 263 308 351 405 446

2 147 185 230 273 316 375 420

3 138 174 215 254 293 346 386

4 131 165 203 239 275 321 357

5 125 158 193 227 259 301 333

6 120 151 184 215 245 284 313

7 115 144 176 205 234 270 297

8 111 139 168 196 223 257 282

9 106 133 161 188 214 246 270

10 103 128 155 181 205 236 259
15 87 109 132 153 174 199 218
20 76 95.1 115 134 152 175 192
25 67.8 84.9 103 120 137 158 173
30 61.4 76.9 93.5 109 125 144 159
45 48.6 61.1 74.9 88.2 101 118 131
60 40.8 51.4 63.5 75.2 86.5 102 113
90 31.7 40.1 50.2 59.8 69.4 82.2 92.2
120 26.5 33.6 42.4 50.8 59.2 70.6 79.5
180 20.5 26.2 33.5 40.4 47.4 56.9 64.4
270 16 20.5 26.5 32.2 37.9 45.8 52
360 13.4 17.2 22.5 27.4 32.4 39.2 44.6
540 10.5 13.5 17.8 21.8 25.9 31.5 35.9
720 8.78 11.4 15.1 18.6 22.1 26.9 30.7
1080 6.85 8.9 11.9 14.7 17.5 21.4 24.6
1440 5.71 7.43 9.96 12.3 14.8 18.2 20.9
1800 4.95 6.44 8.65 10.7 12.9 15.9 18.3
2160 4.38 5.71 7.68 9.54 11.5 14.2 16.4
2880 3.6 4.68 6.31 7.87 9.5 11.8 13.7
4320 2.68 3.49 4.71 5.89 7.14 8.98 10.5
5760 2.16 2.8 3.78 4.73 5.76 7.26 8.52
7200 1.81 2.35 3.17 3.97 4.83 6.1 7.16
8640 1.57 2.03 2.73 3.42 4.16 5.24 6.15
10080 1.39 1.79 2.41 3.01 3.65 4.59 5.37

SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH

Page 36

JFP URBAN CONSULTANTS

=

URBANCONSULTANTS

2100 RAINFALL INTENSITIES

Duration 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
(minutes ) mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr

1 207.6 260.4 315.6 369.6 421.2 486 535.2

2 176.4 222 276 327.6 379.2 450 504

3 165.6 208.8 258 304.8 351.6 415.2 463.2

4 157.2 198 243.6 286.8 330 385.2 428.4

5 150 189.6 231.6 272.4 310.8 361.2 399.6

6 144 181.2 220.8 258 294 340.8 375.6

7 138 172.8 211.2 246 280.8 324 356.4

8 133.2 166.8 201.6 235.2 267.6 308.4 338.4

9 127.2 159.6 193.2 225.6 256.8 295.2 324

10 123.6 153.6 186 217.2 246 283.2 310.8
15 104.4 130.8 158.4 183.6 208.8 238.8 261.6
20 91.2 114.12 138 160.8 182.4 210 230.4
25 81.36 101.88 123.6 144 164.4 189.6 207.6
30 73.68 92.28 112.2 130.8 150 172.8 190.8
45 58.32 73.32 89.88 105.84 121.2 141.6 157.2
60 48.96 61.68 76.2 90.24 103.8 122.4 135.6
90 38.04 48.12 60.24 71.76 83.28 98.64 110.64
120 31.8 40.32 50.88 60.96 71.04 84.72 95.4
180 24.6 31.44 40.2 48.48 56.88 68.28 77.28
270 19.2 24.6 31.8 38.64 45.48 54.96 62.4
360 16.08 20.64 27 32.88 38.88 47.04 53.52
540 12.6 16.2 21.36 26.16 31.08 37.8 43.08
720 10.536 13.68 18.12 22.32 26.52 32.28 36.84
1080 8.22 10.68 14.28 17.64 21 25.68 29.52
1440 6.852 8.916 11.952 14.76 17.76 21.84 25.08
1800 5.94 7.728 10.38 12.84 15.48 19.08 21.96
2160 5.256 6.852 9.216 11.448 13.8 17.04 19.68
2880 4.32 5.616 7.572 9.444 11.4 14.16 16.44
4320 3.216 4.188 5.652 7.068 8.568 10.776 12.6
5760 2.592 3.36 4.536 5.676 6.912 8.712 10.224
7200 2.172 2.82 3.804 4.764 5.796 7.32 8.592
8640 1.884 2.436 3.276 4.104 4.992 6.288 7.38
10080 1.668 2.148 2.892 3.612 4.38 5.508 6.444

SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH

Page 37

APPENDIX D
STORMWATER CATCHMENT PLANS
   Pre-Development Site Catchment
   Post-Development Site Catchment




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C   36 & 38 DUKE STREET, SUNSHINE BEACH

Page 38

                                                                                                                                                                                                                  S
                                                                                                                                                                                                                                                                                                                             E1




                                                                                                                                                                                                              S
                                                                                                                                                                                            S
                                                                                                                                                                           S
                                                                                                                                                           S
                                                                                                                                          S
                                                                                                                          S




                                                                                                                                                                                                                         E1
                                                                                                         S




                                                                                          S




                                                                                                                                                                                                                                                                                                   S
                                                                                                                                                                                                                                                                                       E




                                                                                                                                                                                                                                                                                           E
                                                                                                                                                                                                                                                                                   E




                                                                                                                                                                                                                                                                                               S
                                                                                                                                                                                                                                                                                   S
                                                                                                                                                                                                                                                                               S
                                                                                                                                                                                                                                                                           S




                                                                                                                                                                                                                                                                       S
                                                                                                                                                                                                                                                       E




                                                                                                                                                                                                                                                           E
                                                                                                                                                                                                                                                   E




                                                                                                                                                                                                                                                                   S




                                                                                                                                                                                                                                                                                                                                                    18/09/2023 N:\M3024\STORMWATER MANAGEMENT\REV B\ACAD\M3024E_DA1_SK01
                                                                                                                                                                                                                                                               S
                                                                                                                                                                                                                                               S




                                                                              BRISBANE - SUNSHINE COAST - CENTRAL QLD                                                             PLANNERS                            PRE-DEVELOPMENT SITE CATCHMENT
                                                                              BRISBANE                                                                                            URBAN DESIGNERS                                                                                                      JOB NO:             PLAN:           ISSUE:
                                                                              JFP House - 76 Ernest Street,                                                                       SURVEYORS                                                                                                            M3024E_DA1          SK01            B    N
                                                                              South Brisbane Qld 4101
                                                                              P 07 3012 0100 W www.jfp.com.au                                                                     ENGINEERS                       36 & 38 DUKE STREET, SUNSHINE BEACH                                                  SCALE:
                                                                                                                                                                                                                                                                                                       DATE:
                                                                                                                                                                                                                                                                                                                     1:100 @ A1
                                                                                                                                                                                                                                                                                                                     18/09/2023
                                                                               JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045                                                 LANDSCAPE ARCHITECTS
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
                                                                                                                                                                                                                      CAMBOOYA PTY LTD                                                                 DRAFTED BY:
                                                                                                                                                                                                                                                                                                       FILE NAME:
                                                                                                                                                                                                                                                                                                                     CB
                                                                                                                                                                                                                                                                                                                     M3024E_DA1_SK01.DWG

Page 39

                                                                                                                                                                                                                        S
                                                                                                                                                                                                                                                                                                                  D1




                                                                                                                                                                                                              S
                                                                                                                                                                                          S
                                                                                                                                                                       S




                                                                                                                                                                                                                                   RW
                                                                                                                                                     S
                                                                                                                                                                                                                       D2




                                                                                                                                                                                                                              RW
                                                                                                                                                                                                                                             RW


                                                                                                                                   S




                                                                                                                                                                                                                                   RW
                                                                                                                                                                                                                       RW
                                                                                                                                                                                                                                                  RW
                                                                                                                S




                                                                                                                                                                                                                                        RW
                                                                                                                                                                                                                                                       RW
                                                                                               S




                                                                                                                                                                                                       RW
                                                                                                                                                                                                                  RW
                                                                                                                                                                                                                                             D1                 RW




                                                                                                                                                                                                                                                                                              S
                                                                                                                                                                                                                                                                         D3




                                                                                                                                                                                                                                                                                          S
                                                                                                                                                                                                                                                                                      S




                                                                                                                                                                                                                                                                                  S
                                                                                                                                                                                                                                                                              S




                                                                                                                                                                                                                                                                     S




                                                                                                                                                                                                                                                                S




                                                                                                                                                                                                                                                                                                                                               26/08/2024 N:\M3024\STORMWATER MANAGEMENT\REV C
                                                                                                                                                                                                                                                            S




                                                                                                                                                                                                                                                                                                                                               (OPW24-0103)\ACAD\M3024E_DA1_SK02
                                                                              BRISBANE - SUNSHINE COAST - CENTRAL QLD                                                             PLANNERS                                  POST-DEVELOPMENT SITE CATCHMENT
                                                                              BRISBANE                                                                                            URBAN DESIGNERS                                                                                                 JOB NO:             PLAN:           ISSUE:
                                                                              JFP House - 76 Ernest Street,                                                                       SURVEYORS                                                                                                       M3024E_DA1          SK02            C    N
                                                                              South Brisbane Qld 4101
                                                                              P 07 3012 0100 W www.jfp.com.au                                                                     ENGINEERS                             36 & 38 DUKE STREET, SUNSHINE BEACH                                       SCALE:
                                                                                                                                                                                                                                                                                                  DATE:
                                                                                                                                                                                                                                                                                                                1:100 @ A1
                                                                                                                                                                                                                                                                                                                26/08/2024
                                                                               JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045                                                 LANDSCAPE ARCHITECTS
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
                                                                                                                                                                                                                        CAMBOOYA PTY LTD                                                          DRAFTED BY:
                                                                                                                                                                                                                                                                                                  FILE NAME:
                                                                                                                                                                                                                                                                                                                CB
                                                                                                                                                                                                                                                                                                                M3024E_DA1_SK02.DWG

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.