Council archive · source document
JFP SBSMP Revision C · OPW24/0103
NOOSA COUNCIL
REFERENCE DOCUMENT
OPW24/0103 8 OCTOBER 2024
SITE BASED STORMWATER
MANAGEMENT PLAN
Revision C
Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 38 pages
Page 2
SITE BASED STORMWATER
MANAGEMENT PLAN
Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd
M3024E_DA1_SBSMP –Revision C
August 2024
JFP Urban Consultants Pty Ltd
Prepared by: C. Blair
Approved by: A. Fraser
Revision Date Details Prepared By Approved By
A 20/04/2023 For Authority submission CB (RPEQ 19190) AF (RPEQ 5691)
B 18/09/2023 Information request response CB (RPEQ 19190) AF (RPEQ 5691)
C 26/08/2024 OPW24/0103 Information request response
CB (RPEQ 19190) AF (RPEQ 5691)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 3
TABLE OF CONTENTS
INTRODUCTION ....................................................................................................................... 1
1.1 OBJECTIVE & SCOPE ....................................................................................................... 1
1.2 OPW INFORMATION REQUEST ITEMS ............................................................................ 1
1.3 MCU INFORMATION REQUEST ITEMS ............................................................................ 3
SITE CHARACTERISTICS ............................................................................................................ 4
2.1 LOCATION....................................................................................................................... 4
2.2 TOPOGRAPHY & DRAINAGE ........................................................................................... 4
STORMWATER QUANTITY ........................................................................................................ 7
3.1 LAWFUL POINT OF DISCHARGE ...................................................................................... 7
3.2 STORMWATER DISCHARGE STRATEGY ........................................................................... 7
3.3 RATIONAL METHOD CALCULATION ................................................................................ 7
3.4 PRE-DEVELOPMENT SITE XP-STORM .............................................................................. 8
3.4.1 CATCHMENT DATA ....................................................................................... 8
3.4.2 RAINFALL DATA ............................................................................................ 8
3.4.3 HYDROLOGICAL LOSSES ............................................................................... 8
3.4.4 BX FACTOR ................................................................................................... 8
3.4.5 EXISTING PEAK DISCHARGE .......................................................................... 8
3.5 POST-DEVELOPMENT SITE XP-STORM............................................................................ 9
3.5.1 CATCHMENT DATA ....................................................................................... 9
3.5.2 RAINFALL DATA .......................................................................................... 10
3.5.3 HYDROLOGICAL LOSSES & BX FACTOR ....................................................... 10
3.5.4 DETENTION TANK ....................................................................................... 10
3.5.5 POST-DEVELOPMENT PEAK DISCHARGE .................................................... 10
3.5.6 DETENTION TANK RESULTS ........................................................................ 11
3.6 DOUGLAS LANE ROAD FLOW CALCULATION ................................................................ 12
3.6.1 PEAK FLOW CALCULATION ......................................................................... 12
3.6.2 ROAD CAPACITY CALCULATION .................................................................. 12
STORMWATER QUALITY ........................................................................................................ 13
4.1 CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT ............................... 13
4.1.1 INTRODUCTION .......................................................................................... 13
4.1.2 POLLUTANTS .............................................................................................. 13
4.1.3 WATER QUALITY OBJECTIVES ..................................................................... 13
4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY .................................. 14
4.1.5 MONITORING & MAINTENANCE ................................................................ 14
4.1.6 RESPONSIBILITY & REPORTING ................................................................... 14
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT .................................. 15
4.3 WATERWAY STABILITY MANAGEMENT ........................................................................ 15
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 4
CONCLUSION & RECOMMENDATIONS ................................................................................... 16
DISCLAIMER .......................................................................................................................... 17
APPENDICES .......................................................................................................................... 18
Appendix A – Existing Site Survey & Proposed Site Plans
Appendix B – Spreadsheet Calculations
Appendix C – XP-STORM Summary
Appendix D – Stormwater Catchment Plans
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 5
INTRODUCTION
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based
Stormwater Management Plan (“SBSMP”) for the proposed development at 36 & 38 Duke Street,
Sunshine Beach (“site”). The material change of use approval is MCU23/0070. The operational works
application reference is OPW24/0103.
The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal
is for a mixed-use development comprising the existing tenancy fronting Duke Street and five residential
apartments developed above. Refer to Appendix A for the survey of the existing site and for an extract
of the approved development plans.
This revision (Revision C) provides responses to Council Information Request associated with
OPW24/0103 dated 12th August 2024. Refer to Section 1.2.
1.1 OBJECTIVE & SCOPE
The design objectives for this report are:
Nominate the lawful point of discharge.
Ensure post-development peak flow rates are mitigated back to the pre-development peak flow
rates via onsite detention.
Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy (2017)
is applicable for the site.
The scope of investigations undertaken for this report is as follows:
Nominate lawful point of discharge.
Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis
includes the sizing of onsite detention to achieve peak flow mitigation.
Provide commentary regarding possible performance-based stormwater quality management
strategies for the operational phase of the development.
1.2 OPW INFORMATION REQUEST ITEMS
Issue – Increase in Rainfall Intensity
It is unclear if the management of stormwater, particularly available detention volume, has been
designed to allow for a 20% increase in rainfall intensity by the year 2100 in accordance with
Performance Outcome 2 of The Noosa Plan 2020 – Water Quality and Drainage Code.
Information Required
1. Provide additional detail demonstrating that a 20% increase in rainfall intensity has been
incorporated into the sizing of the proposed detention tank (i.e., detention volume). The
additional detail must be certified by a suitably qualified person (RPEQ).
RESPONSE:
The detention tank design has been revised to allow for a 20% increase in rainfall intensity by the year
2100. Refer to Section 3.5.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |1
Page 6
Issue – Inlet Connections to Detention Tank
Council has identified the following items of JFP’s Drainage Layout Plan (D02, Rev. A) that require further
clarification:
a. The outlet of the ‘grated inlet’ in the carpark is to be connected to the detention tank. It is
unclear how the connection into the detention tank is to be constructed.
b. A ‘45O bend’ is annotated downstream of structure 1/A, however a 90O right-hand bend is
shown. The hydraulic performance and future maintenance of a 90O righthand bend is of
concern.
C. Catchment D3 is to be directed to structure 3/A. It is unclear how this landscaped catchment
area on the Douglas Lane level is to be directed down to structure 3/A on the Duke Street level.
Information Required
2. Provide additional detail addressing the above concerns. The additional detail must be prepared
by a suitably qualified person (RPEQ), and include but not be limited to:
a. An amended detention tank detail and section detailing the inlet connection from
structure 1/A;
b. A comment by the certifying engineer clarifying that a 45O bend will be installed or that
a 90O right-hand bend is suitable (hydraulically, maintenance); and
C. Demonstrate how the Catchment D3 (landscaped area) will be directed between the
Douglas Lane and Duke Street levels.
RESPONSE:
a. A connection from the car park grated inlet (1/D) to detention tank is now shown operational
works drawing no. M3024E-D02, Rev B (not attached to this report). The grated inlet 1/D is
located on Douglas Lane level at RL 33.86 while the detention tank is located on Duke Street level
and tank IL is 30.10m AHD. Additional details are to be provided the building hydraulic
consultant.
b. The design plans have been amended to show two 45-degree bends.
c. Flows from Catchment D3 are to flow to inlet 3/A via piped drainage constructed within building
works. Design of this piped drainage forms part of building hydraulic works. Catchment D3 is the
landscaped planter area situated on Douglas Lane level at RL 33.86 while structure 3/A is on
Duke Street level at RL 30.26m AHD. an upper-level outdoor area. Relevant notes have been
added to operational works drawing no. M3024E-D01, Rev B (not attached to this report).
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |2
Page 7
1.3 MCU INFORMATION REQUEST ITEMS
Issue – Stormwater Drainage
The submitted documentation does not include sufficient information for Council to assess how
stormwater generated by the development will be controlled, collected, and discharged.
It is unclear what the proposed structure downstream from the proposed detention tank is and how
it will integrate into the proposed drainage system (indicated by a blue circle).
It is unclear how the proposed detention tank overflows during events up to, and including, a 1%
AEP event (volume, discharge rate).
It is unclear how the infiltration outlet of the detention tank will operate. Given the large catchment
area of the detention tank, Council is concerned the soil may become oversaturated and the
filtration rate of the soil will reduce which may adversely affect the overall drainage system and the
structural elements of the development.
It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event.
Council recognise that this field inlet serves both the overflow from the detention tank and a small
catchment area. Council is concerned that during events up to, and including, a 1% AEP event this
pit may surcharge and direct additional runoff on to the footpath in the road reserve.
The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate
higher than 25 l/s during a 1% AEP event.
Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a
suitably qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that
the stormwater system is conceptually functional.
RESPONSE:
The following responses are provided for each dot point raised:
The ‘blue circle’ is a manhole/roofwater pit. It conceptually shows a junction at which drainage pipes
change direction. The concept plans have been amended and further details can be provided during
detailed design as required.
The outflow from the tank is controlled via a 75mm diameter orifice. It limits 1% AEP site discharge
to 25L/s as requested in dot point #5. An overflow weir is proposed at RL 33.11m AHD to allow
overflow.
No infiltration is proposed. All outflows are directed to Duke Street kerb and channel.
Runoff from a majority of Catchment D3 will be collected by building’s roofwater system. The
proposed field inlet in Catchment D3 has been amended to a roofwater pit and it can be provided
with a bolt down cover so that it will not surcharge. The outflow pipe from the detention tank will
operate under head. This is consistent with standard building hydraulic design.
The discharge rate from site has been limited to 25L/s in a 1% AEP storm event. This has been
achieved by increasing detention volume and limiting outflows via 75mm diameter orifice.
Appropriate screens can be incorporated in detail design to minimise blockage of this orifice. Any
additional requirements can be conditioned.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |3
Page 8
SITE CHARACTERISTICS
2.1 LOCATION
The site is in the Noosa Shire Council local government area. The site has real property descriptions Lot
370 & 371 on RP48111 – more commonly known as 36 & 38 Duke Street, Sunshine Beach. It has frontage
to Duke Street to the south and Douglas Lane to the north; and currently contains a restaurant fronting
Duke Street. Refer to Figure 1 for aerial view.
The site is not identified to be affected by flooding or tidal influence.
Site
Figure 1 – Site Location (Source: Nearmap, August 2022)
2.2 TOPOGRAPHY & DRAINAGE
The site falls toward Duke Street at an average grade of 10%. A site visit was undertaken on 26th July
2022, and the following drainage patterns were observed.
The existing site appears to discharge roofwater to Duke Street via two kerb adapters located on
high side and low side of the site. Refer to Figure 2 and Figure 3.
No existing stormwater infrastructure was observed in the rear of the site. Surface flows from the
rear is expected run down the pathway adjacent to the existing building. Refer to Figure 4.
A road flow calculation has been undertaken on Douglas Lane to confirm up to and including a 1%
AEP external flows do not enter the site. Refer to Section 3.6.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |4
Page 9
Existing
restaurant
on site
Existing kerb
adapter, high side
Figure 2 – Existing High Side Kerb Adapter
Existing kerb
adapter, low side
Figure 3 – Existing Low Side Kerb Adapter
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |5
Page 10
Existing
building
Existing
pathway
Figure 4 – Rear of the Site, viewed from Douglas Lane
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |6
Page 11
STORMWATER QUANTITY
3.1 LAWFUL POINT OF DISCHARGE
The proposed lawful point of discharge is the kerb & channel on Duke Street. Currently there are two
kerb adapters fronting the site. It is proposed to utilise only the low side kerb adapter and upgrade as
required. The 1% AEP peak flow rate has been limited to 25L/s.
3.2 STORMWATER DISCHARGE STRATEGY
The fraction imperviousness increases due to the proposed development. To mitigate increase to peak
discharge rates an on-site detention tank is proposed. The tank is proposed to be located on Duke Street
level and tank IL is 30.1m AHD.
It is proposed to collect and convey a majority of the site runoff into the detention tank. Mitigated flows
are to be discharged on to Duke Street kerb & channel.
3.3 RATIONAL METHOD CALCULATION
The Rational Method Calculation has been undertaken for the pre-development site. Table 1 presents
the Rational Method catchment parameters. Refer to Drawings No. M3024E_DA1_SK01 in Appendix D
for the catchment plan. The fraction imperviousness has been estimated from the detailed survey
(included in Appendix A). The C10 has then been determined in accordance with Table 4.5.3 of the QUDM
(2016) and the time of concentration (Tc) based on the Standard Inlet Time in accordance with Table
4.6.2 of the QUDM (2016).
Table 1 – Rational Method Calculation Parameters
Fraction
Catchment Area (ha) C10 Tc (mins)
Impervious
E1 0.0486 57% 0.82 8
Site specific 2016 rainfall intensities were obtained from Bureau of Meteorology (BOM). Table 2 presents
the Rational Method peak flow rates. Further details included in Appendix B.
Table 2 – Rational Method Peak Flows
Rational Method Peak Flows (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
E1 0.010 0.013 0.018 0.022 0.026 0.033 0.037
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |7
Page 12
3.4 PRE-DEVELOPMENT SITE XP-STORM
A peak flow analysis has been undertaken using the XP-STORM version 2024.2 for sizing the detention
tank. The pre-development site was modelled using a single node and peak flows verified against the
Rational Method Calculation.
3.4.1 CATCHMENT DATA
Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.
Table 3 – Pre-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
E1 0.0486 57% 10%
3.4.2 RAINFALL DATA
The site specific 2016 rainfall intensities obtained from BOM and a 20% increase in rainfall intensity has
been adopted to represent the year 2100. The rainfall intensities have been coupled Australian Rainfall
& Runoff (AR&R) 1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs
in XP-STORM.
3.4.3 HYDROLOGICAL LOSSES
The following initial loss, continuous loss and Manning’s n values have been adopted for the hydrological
modelling. They are within the ranges recommended in the AR&R (1987) for Southeast Queensland.
Table 4 – Hydrological Losses
Continuing Loss
AEP Area Type Initial Loss (mm) Manning’s n
(mm/hr)
Impervious Area 0 0 0.014
63% to 1%
Pervious Area 15 2 0.07
3.4.4 BX FACTOR
A Bx factor of 1.8 has been used across all AEPs modelled.
3.4.5 EXISTING PEAK DISCHARGE
The XP-STORM hydrology was run for the standard AEPs from a 63% AEP to a 1% AEP and 15 to 180-
minute standard durations. Table 5 presents pre-development site peak flows using the current rainfall
intensities.
Table 5 – Pre-Development Peak Flows (Current Rainfall Intensities)
Pre-Development Peak Flows (m³/s)
Current Rainfall Intensities
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Rational Calc 0.010 0.013 0.018 0.022 0.026 0.033 0.037
XP-STORM 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Variance +0.002 +0.004 +0.003 +0.005 +0.006 +0.001 +0.001
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |8
Page 13
The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the peak
flow and detention tank analysis for this site.
Table 6 presents the pre-development peak flows with a 20% increase in rainfall intensities for the year
2100.
Table 6 – Pre-Development Peak Flows (2100 Rainfall Intensities)
Pre-Development Peak Flows (m³/s)
2100 Rainfall Intensities
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
XP-STORM 0.016 0.021 0.027 0.034 0.040 0.042 0.046
3.5 POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA
Table 7 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in Appendix
D presents the catchment delineation.
Table 7 – Post-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
D1 0.0335 100% 10%
D2 0.0121 66% 10%
D3 0.0030 100% 10%
Total 0.0486 92% 10%
The following catchment arrangements have been modelled:
5% AEP from catchment D1 has been modelled to enter the detention tank. Larger flows bypass
detention.
1% AEP from catchment D2 has been modelled to enter the detention tank.
Catchment D3 bypasses the detention tank.
Figure 5 presents the XP-STORM layout for the post-development site.
Figure 5 – Post-Development XP-STORM Layout
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |9
Page 14
3.5.2 RAINFALL DATA
As per the pre-development scenario and includes the 20% increase in rainfall intensities.
3.5.3 HYDROLOGICAL LOSSES & BX FACTOR
As per the pre-development scenario.
3.5.4 DETENTION TANK
Table 8 presents the detention tank parameters modelled. Refer to Appendix C for the stage vs area
relationship. Re-analysis will be required if the stage-area relationship is significantly altered.
Table 8 – Detention Tank Details
Detention Parameter Value
Surface Area (m²) 8.5
Volume (m³) 20.4
Depth (m) 2.4
Tank IL (m AHD) 30.1
Orifice Outlet 80mm dia at IL 30.1m AHD
Weir Outlet 1500mm weir at RL 32.43m AHD
3.5.5 POST-DEVELOPMENT PEAK DISCHARGE
The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard durations. Table
9 and Table 10 present the peak flow results.
Table 9 – Pre & Post-Development Peak Flows (XP-STORM)
Peak Flow Results (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Post-Dev.
(2100 rainfall 0.011 0.014 0.016 0.018 0.020 0.022 0.024
intensities)
Pre-Dev.
(2100 rainfall 0.016 0.021 0.027 0.034 0.040 0.042 0.046
intensities)
Variance -0.004 -0.008 -0.011 -0.015 -0.020 -0.020 -0.021
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 10
Page 15
Table 10 – Pre & Post-Development Peak Flows (XP-STORM)
Peak Flow Results (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Post-Dev.
(2100 rainfall 0.011 0.014 0.016 0.018 0.020 0.022 0.024
intensities)
Pre-Dev.
(current rainfall 0.012 0.017 0.021 0.027 0.032 0.034 0.038
intensities)
Variance -0.001 -0.003 -0.005 -0.009 -0.012 -0.012 -0.0013
The above results demonstrate that the post-development peak flow with a 20% increase in rainfall
intensities are mitigated against the pre-development peak flows currently and in the year 2100.
Moreover, the 1% AEP post-development flow does not exceed 25L/s (0.025m³/s).
3.5.6 DETENTION TANK RESULTS
Table 11 presents the detention tank performance. As can be seen, the 1% AEP is within the tank volume
of 20.4m³.
Table 11 – Detention Tank Results
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Tank Inflow
0.021 0.026 0.032 0.037 0.041 0.042 0.044
(m³/s)
Tank Outflow
0.012 0.014 0.016 0.018 0.020 0.022 0.024
(m³/s)
Detention
6.2 8.2 10.5 12.9 15.2 17.4 19.7
Volume (m³)
Depth of
0.73 0.97 1.24 1.51 1.78 2.05 2.32
Water (m)
Water RL
30.83 31.07 31.34 31.61 31.88 32.15 32.42
(m AHD)
Note: Invert of detention tank is 30.10m AHD
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 11
Page 16
3.6 DOUGLAS LANE ROAD FLOW CALCULATION
A road flow capacity assessment has been undertaken to confirm that the external flows on Douglas
Lane do not enter the site.
3.6.1 PEAK FLOW CALCULATION
Refer to Figure 6 for the external catchment delineation and Table 12 for peak flow rates calculated
using the Rational Method. Refer to Appendix B for additional details.
External
Catchment
0.13ha
Manning’s
Section
Figure 6 – External Catchment to Douglas Lane
Table 12 – External Catchment Peak Flows
Scenario 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Current Peak
0.030 0.040 0.055 0.068 0.081 0.103 0.113
Flow (m³/s)
2100 Peak
0.036 0.048 0.066 0.081 0.097 0.123 0.136
Flow (m³/s)
3.6.2 ROAD CAPACITY CALCULATION
The Manning’s Equation has been used to undertake a road flow calculation on Douglas Lane. Refer to
Figure 6 above for the cross-section location. The longitudinal grade on Douglas Lane fronting the site is
approximately 8% and a surface roughness value of 0.015 was adopted for the pavement.
The results in Table 13 show the flows do not overtop the kerb, which is approximately 120mm high.
Refer to Appendix B for further calculation details.
Table 13 – Manning’s Equation Calculation
1% AEP Flow Max Road Flow
Scenario Velocity (m/s) DV Product (m²/s)
(m³/s) Depth (mm)
Current Peak
0.113 42 1.54 0.07
Flow (m³/s)
2100 Peak
0.136 45 1.65 0.07
Flow (m³/s)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 12
Page 17
STORMWATER QUALITY
4.1 CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT
4.1.1 INTRODUCTION
This section provides conceptual stormwater quality management strategies for construction phase.
These strategies are applicable for all stages of the development. No modelling has been undertaken for
the construction phase stormwater quality management. Detailed Erosion and Sediment Control Plans
will be prepared during detailed design phase and implemented during construction.
4.1.2 POLLUTANTS
Typical pollutants generated during the construction phase of an urban development are shown in Table
14. These based on Table C4.1 BCC’s Subdivision & Development Guidelines Part C Section 4.1.1 (2008).
Table 14 – Construction Phase Pollutants
Pollutant Potential Source
Litter Paper, construction packaging, food packaging, cement bags, off-cuts.
Sediment Unprotected exposed soils and stockpiles during earthworks and building works.
Hydrocarbons Fuel/oil spills, leaks from construction equipment, and temporary car park areas.
Toxic
Cement Slurry, asphalt primer, solvents, cleaning agents, and washwaters etc.
Materials
pH altering
Cement slurry, acid sulfate soils, and washwaters
substances
4.1.3 WATER QUALITY OBJECTIVES
It is recommended that the amount of runoff crossing and leaving the site is kept to a minimum during
the construction phase to restrict soil erosion and mobilisation of sediments and pollutants through and
off the site. Table 15 presents an extract from Table A, Appendix 2 of the State Planning Policy (2017)
objectives for construction phase stormwater quality management
Table 15 – Construction Phase Performance Criteria
Issue Desired Outcomes
1. Stage clearing and construction works to minimise the area of exposed soil at
any one time.
2. Effectively cover or stabilise exposed soils prior to predicted rainfall.
Erosion control
3. Prior to completion of works for the development, and prior to removal of
sediment controls, all site surfaces must be effectively stabilised using
methods which will achieve effective short-term stabilisation.
1. Direct runoff from exposed site soils to sediment controls that are appropriate
to the extent of disturbance and level of erosion risk.
2. All exposed areas greater than 2500m² must be provided with sediment
Sediment
controls which are designed, implemented and maintained to a standard
Control
which would achieve at least 80% of the average annual runoff volume of the
contributing catchment treated (i.e. 80% hydrological effectiveness) to
50mg/L Total Suspended Solids (TSS) or less, and pH in the range (6.5–8.5).
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 13
Page 18
4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY
An erosion and sediment control management plan that is endorsed by an CPESC or RPEQ will be
prepared and implemented during construction phase. Erosion and sediment control measures may
include, but not limited to, devices such as:
catch drains,
diversion drains,
silt fences, and
construction entry/exit pads.
4.1.5 MONITORING & MAINTENANCE
The general requirement of monitoring during the construction phase will be:
Work activities to be restricted to designated construction areas.
Earthworks and site clearing to be undertaken in accordance with the Erosion and Sediment Control
Plans prepared during detailed design phase.
Erosion and sediment control devices to be constructed in accordance with the Erosion and
Sediment Control Plans prepared during detailed design phase.
Inspect sediment fences and erosion and sediment control structures/devices on a weekly basis as
well as after any rain event exceeding 25mm in 24hrs.
Stormwater discharges from the site are not to have any adverse effect on the downstream
environment.
Monitor and record of the performance of the drainage control devices including water quality
testing where required.
Any failure in the stormwater system to be immediately rectified to prevent uncontrolled discharge
from the site.
Any failure to the stormwater system causing damage to surroundings should implement immediate
remedial work to the damaged area.
4.1.6 RESPONSIBILITY & REPORTING
The contractor shall be responsible for monitoring the performance of all drainage control and
erosion and sediment control devices.
Records of any failures to devices should be kept and reported to the Construction Manager.
Regular inspections of the devices shall be reported to the Construction Manager.
Inspections of the devices after heavy rainfall shall be reported to the Construction Manager.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 14
Page 19
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT
The development footprint is 486m² which is less than 2,500m². Therefore, the site does not trigger
compliance with the State Planning Policy (2017) for stormwater quality management and meeting the
required Water Quality Objectives (WQOs). The development is also not discharging into ‘High Ecological
Value’ waters. On that basis, no conventional stormwater improvement devices such as bioretention
are proposed and MUSIC modelling has not been undertaken for the site.
While no active stormwater treatment measures such as bioretention is proposed, the site will have
some passive stormwater quality treatment measures. For instance, most of the site is covered by the
building footprint and most of the building runoff is directed into a detention tank. Most of the gross
pollutants such as tree leaves and visible rubbish will be captured in the roof gutters. Smaller gross
pollutants and Suspended Solids that travel through the roof drainage system will enter the detention
tank where runoff will pond for a period of time allowing the pollutants to settle into the bottom of the
bank. Periodic maintenance of the roof drainage system and the detention tank will ensure most of the
gross pollutants and Suspended Solids are captured within the site prior to discharging into the
downstream drainage network.
The landscaping proposed within the site will also provide water quality benefit to runoff that is directed
to them. The vegetation will capture primary pollutants, and the soil underneath will provide some level
of nutrient treatment.
4.3 WATERWAY STABILITY MANAGEMENT
The waterway stability management in accordance with the State Planning Policy (2017) is not applicable
for this site, as the site flows are connected to an urban underground drainage network which then
discharges into tidal waters.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 15
Page 20
CONCLUSION & RECOMMENDATIONS
JFP Urban Consultants Pty Ltd has prepared this Site Based Stormwater Management Plan for the
proposed development at 36 & 38 Duke Street, Sunshine Beach. The analyses presented in this report
achieve the following outcomes:
The outcomes of the stormwater analyses are:
The proposed lawful point of discharge is the kerb & channel on Duke Street and 1% AEP discharge
is 25L/s.
20.4m³ of on-site detention is proposed. This volume has allowed for a 20% increase in rainfall
intensity by the year 2100.
Douglas Lane has adequate capacity to convey 1% AEP external catchment flows so they do not
enter the site.
Erosion & sediment control measures are to be implemented in the construction phase.
As the site area is less than 2500m² the development does not trigger the State Planning Policy
(2017) for operational phase stormwater quality management and therefore stormwater quality
treatment devices such as bioretention is not required. The site’s internal drainage system and the
landscaping areas will provide some level of stormwater quality treatment, particularly for the gross
pollutants and Suspended Solids.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 16
Page 21
DISCLAIMER
This report has been prepared for the purpose and exclusive use of Cambooya Pty Ltd as an investigation
into the stormwater management issues related for the proposed development of the land described in
the report. The information presented in this report is not to be used for any other purpose or by any
other person or corporation.
JFP Urban Consultants Pty Ltd accepts no responsibility for any loss or damage suffered howsoever
arising to any person or corporation who may use or rely on this report without further input and/or
advice from JFP Urban Consultants Pty Ltd.
The investigations, calculations, analysis and recommendations presented in this report rely on
information sourced from third-parties. JFP Urban Consultants Pty Ltd accepts no responsibility for the
accuracy of the information sourced from third-parties.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 17
Page 22
APPENDICES
Appendix A – Existing Site Survey & Proposed Site Plans
Appendix B – Spreadsheet Calculations
Appendix C – XP-STORM Summary
Appendix D – Stormwater Catchment Plans
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 18
Page 23
APPENDIX A EXISTING SITE SURVEY & PROPOSED SITE PLANS SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 24
[5 STORMWATER GRATE
6) STORMWATER MANHOLE
G
SEWER MANHOLE
ELECTRICITY JUNCTION BOX
TELSTRA PIT
WATER METER
HYDRANT
STOP VALVE
POWER POLE
UIGHT POLE
BENCH MARK
exregiz®
®
LINETYPE LEGEND
BANK BOTTOM
BANK TOP
BATTER
CROWN
currer
= GRAVEL
‘BITUMEN
KERB
CONCRETE
ELECTRICAL
WATER
awiPoot
SEWER
DRAINAGE
TREELINE
GARDEN
T TELSTRA
——— sutone
—------ PAVING:
POE RETAINING WALL
WALL
a CUAROR AL
Fence
Boy
‘MAJOR CONTOUR
MINOR CONTOUR,
cP
SP120994
0 2 4 6 8
cP
SP176872
ES
ROR
RS
SS
SOS
Re
Ss
ey
>
YY
AS
8
‘
30
us
10
Ss
x
12
Scale 1:200 - Lengths are in Metres
14
DENOTES GRAVEL
DENOTES CONCRETE
DENOTES BUILDING
DENOTES aITUMEN
DENOTES PAVING
MAX WATTERSON
+ASSOCIATES
CONSULTING SURVEYORS
& PLANNERS
12. Maple Street
PO Box 639
Cooroy Qld 4563,
Ph. (07) 54426121
Fax. (07) 54425125
Email [email protected]
Client:
CAMBOOYA
PTY LTD
Project:
DETAIL AND
CONTOUR PLAN OF
LOTS 370 & 371 ON
RP48111.
LOCAL GOVT: NOOSA S.C.
LOCALITY: SUNSHINE BEACH
Scale: 1:200 Plan 4 of 4
Datum: AHD Date: 31-08-23
Origin: pee27 .
Cont 2s . Ref.
font.nt: 0.25m
22-5703AB
NOTE:
This plan has been prepared for building
design purposes only.
Underground services not located except
where evident on surface.
Page 25
E> >
SS” ; 2 op
: ho - \DOUGLAS LANE
1020p 710, p 190
aT rt - t
7 : ZONE TO BE LEESTHAN 0.6m
__ 2411001 BINS. = . = HIGH & NO
QUTFLOW
/—~ SCREEN FOR
/ ~ MECHANICAL
EXHAUST DUCT
C
\_ EXIENT OF ENTRY RAMP
SHOWN DASHED
CARPARK
rae) |
GROUND-FLOOR PUBLIC-LOBBY
_ AMENITI
Pool ste pL SAELL
MB2/H} suastesie SUBSTRATE
TENAN
01
POOL PUMP & POOL PUMP &
FILTER ti
La
(BADE
PLANTER
Hi
HETIL 30
OUTDOOR DININGi i ittittteriiit
TLAT EEE
LJSCUUUUUENE OUD
“A
OUTDOOR DINING
OUTDOORBUSINESS AREA
em
AWNING BELOW 50
NOOSA COUNCIL
ai an APPROVED PLAN
01 FLOOR PLAN DUKE STREET 02 FLOOR PLAN LEVEL 1 / DOUGLAS LANE MCuU23/0070 18 APR 2024
1:100 1:100
PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ce ten wae BUCKBURNEJ/CKSON
36 - 38 DUKE STREET, SUNSHINE BEACH a eee
‘a mode sep en nna. 1 059 ‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid
Document Set ID: 22816400
Version: 1, Version Date: 16/02/2024
Page 26
NEN CY, OY aN
STEP SP wy ey
1080_fy 12070 Jp 1938
7 7 4
5100, om
12.0m HEIGHT LIMIT PROJECTION
EXTENT ETAL ROOF ABOVE NATURAL GROUND
iy ack “oa
weer “ =
inf | Os oz
44H i
tf L bee. at
d O LIFT OVER | =
5 RUN a
||| |e |||
Sp om tte 4 &
a
—
®
O
N
@»>
7
yp
Z wr
yas
7
je
®
6 6
tS .
L110 5520 lp 5500 L
ope 82150 jp 1938
7 7
®
NOOSA COUNCIL
oO
APPROVED PLAN
01 ROOF PLAN 02 HEIGHT PLANE PROJECTION MCU23/0070 18 APR 2024
1:100 1:50
PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ce tena BUCKBURNEJ/CKSON
36 - 38 DUKE STREET, SUNSHINE BEACH ROOF PLAN & HEIGHT PLANE ae
7252-DA08
ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT
‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid
Page 27
| exaust oucriINe To Be le zl le
3|__ Wore hour Ane is 5 is
lees e gi 2
g -_ 3 5-——_ 3
Z| g Z| Bi ig
| "2 | | ES pss |
DOUGLAS | ~ eS | DUKE DOUGLAS | ae | DUKE
LANE | __ 12m HEIGHT Lia oasieD | STREET LANE | fom, LIFT ~ SS 7 PmneIGHT LMT oMsHED | STREET
~— OVERRUN TO | a a i nc,
i som, LIET OVERRUN TO PME cares | | FUTURE DETAIL an |
FUTURE DETAIL ere STAR LID
008 ! | 008 | |
RRL GZ 960 RL 42960 T — T ae
| |
soReen To cONcEAL | 4 l
EXHAUST DUCTING i |
LEVEL LeveL
R000 Se mc rtrt~<;3;3;CMTCté<;7 CS TOT RL 40.060 a
| |
HARDSTAND LEVELS TO CIVIL. | 5 l HARDSTAND LEVELS TO CIVIL
ENGINEER'S DRAWING. [| Ree | ENGINEER'S DRAWING. I
SPLASH PROOF
LEVEL? __ ee 4) ee LEVEL? __ ee fe
RLI6966 RL36766
| | |
PLANTER
PLANTER g |
CAR PARKING concsere CAR PARKING Pian
AWNING OVER ‘FOOTPATH
DOUGLAS ‘FOOTEAIH DOUGLAS,
‘RL 33.860 a ‘RL 33.860 = =
ENCLOSED,
nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER'S DETAIL
‘nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER’S DETAIL
TENANCY
[LAYOUT AS PER 7252_DAIa]
TENANCY
LAYOUT AS PER 7252_DA13]
‘nor, TANKING &
WATERPROOF
‘MEMBRANE To CIVIL
ENGINEER'S DETAIL
‘nom. TANKING &
WATERPROOF MEMBRANE TO
CIVIL ENGINEER'S DETAIL
FOOTPATH
FOOTPATH
NATURAL GROUND LINE DASHED
01 A SECTION 02 B SECTION
PROPOSED GROUND LINE
y,
1:100 1:100
le
3
ig
5
8
|
DOUGLAS Se | DUKE
LANE cm = — — — "2m HEIGHT LT oASHED | STREET
eee ‘SLAB
| SLAB EXTENSION AS ——— Miia | Btzusionas
SUNSHADESOR LEE Sm j suiaberon
Roe OW o_O Se... ne ABEY LEVEL BELOW
aime i
F weraccess
| SUNSHADESOR LEVEL APT 03 +
wee | |
RL40.060 TE ne = 2 a — TO
i i
warupauey
| VENTILATED APT 01 \ 0 L
i Wer nceess H
| BALC
LEVEL? ge fo Po
cm HARDSTAND LEVELS TO CIVIL. =
ENGINEER'S DRAWING PLANTER
CAR PARKING | ms ver
LEVELS TO CIVIL ENGINEER'S DRAWINGS FOUIWATH
URS =—=—} TPOINT,
Sis SWS.
BATHROOM
S ~
GK NL TENANCY
Sy Sr cone CA ‘poate Loser (LATOUTAS PER 7252 0411 FOOTPATH
S YSGS: NATURAL GROUND
z ~ “ES TO CIVIL ENGINEER'S DETAIL S Ss ES | |_NATURAL GROUND
oune sracet SAS S -’RSXESTSA =~
Risin AS GS SPSS IRS, FATE SHE SR,
tes S S YUEYSYSYSIIES WON RRO
S&S YK SYK YSIS
KS K KS Ky KY SES racrsta cron ine YZ ey KS cy RY KS
SSAA AAARAADAKARAN IS
S
S
03 C SECTION
1:100
NOOSA COUNCIL
APPROVED PLAN
MCU23/0070 18 APR 2024
scale: 1:100@A1 1:200 @A3
PROPOSED MIXED USE DEVELOPMENT, CAMBOOYA PTY LTD ime ne BLICKBURNEJ/CKKSON
36 - 38 DUKE STREET, SUNSHINE BEACH eee
SECTIONS 7252-DA15
Document Set ID: 22816400
Version: 1, Version Date: 16/02/2024
‘The designs, drawings and specication are copyright and always remain the property of Blackburne Jackson Design Pty Lid
Page 28
APPENDIX B SPREADSHEET CALCULATIONS Rational Method Calculation – Site Rational Method Calculation – External Catchment (Douglas Lane) Manning’s Calculation – Douglas Lane SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 29
RATIONAL METHOD CALCULATION – SITE
Catchment Details EXISTING SITE PROPOSED SITE
Area (ha) 0.0486 0.0486
Impervious Area (ha) 0.0277 0.044
Fraction Impervious (%) 57% 92%
1
I60 (mm/hr) 75.2 75.2
C1 0.656 0.70
C2 0.70 0.75
C5 0.78 0.84
C10 0.82 0.88
C20 0.86 0.92
C50 0.94 1.00
C100 0.98 1.00
Time of Concentration (min)
Method Tc
Catchment
EXISTING SITE Standard inlet time, catchment slope ~14% 8
PROPOSED SITE Standard inlet time, mostly paved/impervious areas 5
Rainfall Intensities (mm/hr)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXISTING SITE 111 139 168 196 223 257 282
PROPOSED SITE 125 158 193 227 259 301 333
Stormwater Quantities (m3/s)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXISTING SITE 0.010 0.013 0.018 0.022 0.026 0.033 0.037
PROPOSED SITE 0.012 0.016 0.022 0.027 0.032 0.041 0.045
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 30
RATIONAL METHOD CALCULATION – EXTERNAL
CATCHMENT (DOUGLAS LANE)
Catchment Detals
External
Catchment
Area (ha) 0.1302
Impervious Area (ha) 0.1042
Fraction Impervious (%) 80%
1
I60 (mm/hr) 75.2
C1 0.70
C2 0.74
C5 0.83
C10 0.87
C20 0.91
C50 1.00
C100 1.00
Time of Concentration (min)
Catchment Method Tc
External Catchment Standard inlet time, mostly paved/impervious areas 6
Rainfall Intensities (mm/hr)
Scenario 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Current 120.0 151.0 184.0 215.0 245.0 284.0 313.0
2100 144.0 181.2 220.8 258.0 294.0 340.8 375.6
Stormwater Quantities (m3/s)
Scenario 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Current 0.030 0.040 0.055 0.068 0.081 0.103 0.113
2100 0.039 0.048 0.066 0.081 0.097 0.123 0.136
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 31
MANNING’S CALCULATION – DOUGLAS LANE
Cross Section Details 1% AEP Flow (current rainfall) 1% AEP Flow (2100 rainfall)
Point CH Z n wA wP n x wA wA wP n x wA
1 0.00 0.080 0.015
2 0.00 0.000 0.015 0.00 0.04 0.00 0.00 0.04 0.00
3 0.50 0.012 0.015 0.02 0.50 0.00 0.02 0.50 0.00
4 1.31 0.027 0.015 0.02 0.80 0.00 0.02 0.80 0.00
5 2.06 0.021 0.015 0.01 0.75 0.00 0.02 0.75 0.00
6 2.61 0.018 0.015 0.01 0.56 0.00 0.01 0.56 0.00
7 2.88 0.017 0.015 0.01 0.26 0.00 0.01 0.26 0.00
8 3.50 0.073 0.015 0.00 0.29 0.00
9 4.67 0.089 0.015 0.01 0.69 0.00
wA wP n x wA wA wP n x wA
TOTAL 0.073 3.207 0.001 0.086 3.618 0.001
Slope (m/m)
0.08 R n Q R n Q
0.023 0.015 0.113 0.024 0.015 0.136
Design Flow (m³/s) 0.113 0.136
WSL (m) 0.042 0.045
Results
Channel Flow (m³/s) 0.113 0.14
Velocity (m/s) 1.54 1.58
Max. Depth (m) 0.042 0.04
DV Product (m²/s) 0.07 0.07
0.10
0.09
0.08
0.07
0.06
0.05 Surface
0.04 1% AEP Flow (current
rainfall)
0.03
1% AEP Flow (2100
0.02 rainfall)
0.01
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Chainage (m)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 32
APPENDIX C XP-STORM SUMMARY Pre-Development Site Discharge (XP-STORM hydrographs) Post-Development Site Discharge (XP-STORM hydrographs) Detention Tank Stage-Area-Volume Pre-Development Scenario Rainfall Intensities Post-Development Scenario Rainfall Intensities SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 33
PRE-DEVELOPMENT SITE DISCHARGE (CURRENT RAINFALL INTENSITIES) PRE-DEVELOPMENT SITE DISCHARGE (20% INCREASED RAINFALL INTENSITIES) SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 34
JFP URBAN CONSULTANTS —— = JFOP ~\ HUAI cy POST-DEVELOPMENT SITE DISCHARGE (20% INCREASED RAINFALL INTENSITIES) Conduit Mitigated Outlfow from D3 to OUT = = x= ee) 41Y_25min[Max 0.011] 2Y_25min[Max 0.014] 5Y_25min[Max 0.016] 10Y_25min[Max 0.018] = —_ a] 20Y_25min[Max 0.020] 50Y_60min[Max 0.022] 400Y_60min[Max 0.025] 0.025 0.020 0.015 S |O ie 0.010 0.005 0.000 SSS S————_—_——— 1 Tue 1AM 2AM 3AM Jan 2019 Time DETENTION TANK STAGE-AREA-VOLUME DETENTION TANK STAGE - AREA - STORAGE RL(mAHD) Height (m) Area (m?) Area (ha) erate l Ale i Merete 0.00085 30.20 0.10 8.50 0.00085 0.850 09 30.30 0.20 8.50 0.00085 0.850 17 30.40 0.30 8.50 0.00085 0.850 26 30.50 0.40 8.50 0.00085 0.850 3.4 30.60 0.50 8.50 0.00085 0.850 43 30.70 0.60 8.50 0.00085 0.850 51 30.80 0.70 8.50 0.00085 0.850 6.0 30.90 0.80 8.50 0.00085 0.850 68 31.00 0.90 8.50 0.00085 0.850 77 31.10 1.00 8.50 0.00085 0.850 8.5 31.20 1.10 8.50 0.00085 0.850 9.4 31.30 1.20 8.50 0.00085 0.850 10.2 31.40 1.30 8.50 0.00085 0.850 144 31.50 1.40 8.50 0.00085 0.850 11.9 31.60 1.50 8.50 0.00085 0.850 12.8 31.70 1.60 8.50 0.00085 0.850 13.6 31.80 1.70 8.50 0.00085 0.850 14.5 31.90 1.80 8.50 0.00085 0.850 15.3 32.00 1.90 8.50 0.00085 0.850 16.2 32.10 2.00 8.50 0.00085 0.850 17.0 32.20 2.10 8.50 0.00085 0.850 17.9 32.30 2.20 8.50 0.00085 0.850 18.7 32.40 2.30 8.50 0.00085 0.850 19.6 32.50 2.40 8.50 0.00085 0.850 20.4 SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 35
JFP URBAN CONSULTANTS == We URBANCONSULTANTS CURRENT RAINFALL INTENSITIES Duration 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP (minutes ) mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr 1 173 217 263 308 351 405 446 2 147 185 230 273 316 375 420 3 138 174 215 254 293 346 386 4 131 165 203 239 275 321 357 5 125 158 193 227 259 301 333 6 120 151 184 215 245 284 313 7 115 144 176 205 234 270 297 8 111 139 168 196 223 257 282 9 106 133 161 188 214 246 270 10 103 128 155 181 205 236 259 15 87 109 132 153 174 199 218 20 76 95.1 115 134 152 175 192 25 67.8 84.9 103 120 137 158 173 30 61.4 76.9 93.5 109 125 144 159 45 48.6 61.1 74.9 88.2 101 118 131 60 40.8 51.4 63.5 75.2 86.5 102 113 90 31.7 40.1 50.2 59.8 69.4 82.2 92.2 120 26.5 33.6 42.4 50.8 59.2 70.6 79.5 180 20.5 26.2 33.5 40.4 47.4 56.9 64.4 270 16 20.5 26.5 32.2 37.9 45.8 52 360 13.4 17.2 22.5 27.4 32.4 39.2 44.6 540 10.5 13.5 17.8 21.8 25.9 31.5 35.9 720 8.78 11.4 15.1 18.6 22.1 26.9 30.7 1080 6.85 8.9 11.9 14.7 17.5 21.4 24.6 1440 5.71 7.43 9.96 12.3 14.8 18.2 20.9 1800 4.95 6.44 8.65 10.7 12.9 15.9 18.3 2160 4.38 5.71 7.68 9.54 11.5 14.2 16.4 2880 3.6 4.68 6.31 7.87 9.5 11.8 13.7 4320 2.68 3.49 4.71 5.89 7.14 8.98 10.5 5760 2.16 2.8 3.78 4.73 5.76 7.26 8.52 7200 1.81 2.35 3.17 3.97 4.83 6.1 7.16 8640 1.57 2.03 2.73 3.42 4.16 5.24 6.15 10080 1.39 1.79 2.41 3.01 3.65 4.59 5.37 SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 36
JFP URBAN CONSULTANTS = URBANCONSULTANTS 2100 RAINFALL INTENSITIES Duration 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP (minutes ) mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr mm/hr 1 207.6 260.4 315.6 369.6 421.2 486 535.2 2 176.4 222 276 327.6 379.2 450 504 3 165.6 208.8 258 304.8 351.6 415.2 463.2 4 157.2 198 243.6 286.8 330 385.2 428.4 5 150 189.6 231.6 272.4 310.8 361.2 399.6 6 144 181.2 220.8 258 294 340.8 375.6 7 138 172.8 211.2 246 280.8 324 356.4 8 133.2 166.8 201.6 235.2 267.6 308.4 338.4 9 127.2 159.6 193.2 225.6 256.8 295.2 324 10 123.6 153.6 186 217.2 246 283.2 310.8 15 104.4 130.8 158.4 183.6 208.8 238.8 261.6 20 91.2 114.12 138 160.8 182.4 210 230.4 25 81.36 101.88 123.6 144 164.4 189.6 207.6 30 73.68 92.28 112.2 130.8 150 172.8 190.8 45 58.32 73.32 89.88 105.84 121.2 141.6 157.2 60 48.96 61.68 76.2 90.24 103.8 122.4 135.6 90 38.04 48.12 60.24 71.76 83.28 98.64 110.64 120 31.8 40.32 50.88 60.96 71.04 84.72 95.4 180 24.6 31.44 40.2 48.48 56.88 68.28 77.28 270 19.2 24.6 31.8 38.64 45.48 54.96 62.4 360 16.08 20.64 27 32.88 38.88 47.04 53.52 540 12.6 16.2 21.36 26.16 31.08 37.8 43.08 720 10.536 13.68 18.12 22.32 26.52 32.28 36.84 1080 8.22 10.68 14.28 17.64 21 25.68 29.52 1440 6.852 8.916 11.952 14.76 17.76 21.84 25.08 1800 5.94 7.728 10.38 12.84 15.48 19.08 21.96 2160 5.256 6.852 9.216 11.448 13.8 17.04 19.68 2880 4.32 5.616 7.572 9.444 11.4 14.16 16.44 4320 3.216 4.188 5.652 7.068 8.568 10.776 12.6 5760 2.592 3.36 4.536 5.676 6.912 8.712 10.224 7200 2.172 2.82 3.804 4.764 5.796 7.32 8.592 8640 1.884 2.436 3.276 4.104 4.992 6.288 7.38 10080 1.668 2.148 2.892 3.612 4.38 5.508 6.444 SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 37
APPENDIX D STORMWATER CATCHMENT PLANS Pre-Development Site Catchment Post-Development Site Catchment SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
Page 38
S
E1
S
S
S
S
S
S
E1
S
S
S
E
E
E
S
S
S
S
S
E
E
E
S
18/09/2023 N:\M3024\STORMWATER MANAGEMENT\REV B\ACAD\M3024E_DA1_SK01
S
S
BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS PRE-DEVELOPMENT SITE CATCHMENT
BRISBANE URBAN DESIGNERS JOB NO: PLAN: ISSUE:
JFP House - 76 Ernest Street, SURVEYORS M3024E_DA1 SK01 B N
South Brisbane Qld 4101
P 07 3012 0100 W www.jfp.com.au ENGINEERS 36 & 38 DUKE STREET, SUNSHINE BEACH SCALE:
DATE:
1:100 @ A1
18/09/2023
JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045 LANDSCAPE ARCHITECTS
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
CAMBOOYA PTY LTD DRAFTED BY:
FILE NAME:
CB
M3024E_DA1_SK01.DWG
Page 39
S
D1
S
S
S
RW
S
D2
RW
RW
S
RW
RW
RW
S
RW
RW
S
RW
RW
D1 RW
S
D3
S
S
S
S
S
S
26/08/2024 N:\M3024\STORMWATER MANAGEMENT\REV C
S
(OPW24-0103)\ACAD\M3024E_DA1_SK02
BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS POST-DEVELOPMENT SITE CATCHMENT
BRISBANE URBAN DESIGNERS JOB NO: PLAN: ISSUE:
JFP House - 76 Ernest Street, SURVEYORS M3024E_DA1 SK02 C N
South Brisbane Qld 4101
P 07 3012 0100 W www.jfp.com.au ENGINEERS 36 & 38 DUKE STREET, SUNSHINE BEACH SCALE:
DATE:
1:100 @ A1
26/08/2024
JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045 LANDSCAPE ARCHITECTS
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
CAMBOOYA PTY LTD DRAFTED BY:
FILE NAME:
CB
M3024E_DA1_SK02.DWG
Used in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.