Council archive · source document
JFP SBSMP Revision C · OPW24/0103
CONCLUSION & RECOMMENDATIONS JFP Urban Consultants Pty Ltd has prepared this Site Based Stormwater Management Plan for the proposed development at 36 & 38 Duke Street, Sunshine Beach. The analyses presented in this report achieve the following outcomes: The outcomes of the stormwater analyses are: The proposed lawful point of discharge is the kerb & channel on Duke Street and 1% AEP discharge is 25L/s. 20.4m³ of on-site detention is proposed. This volume has allowed for a 20% increase in rainfall intensity by the year 2100. Douglas Lane has adequate capacity to convey 1% AEP external catchment flows so they do not enter the site. Erosion & sediment control measures are to be implemented in the construction phase. As the site area is less than 2500m² the development does not trigger the State Planning Policy (2017) for operational phase stormwater quality management and therefore stormwater quality treatment devices such as bioretention is not required. The site’s internal drainage system and the landscaping areas will provide some level of stormwater quality treatment, particularly for the gross pollutants and Suspended Solids. SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH P a g e | 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.