Council archive · source document
JFP SBSMP Revision C · OPW24/0103
JFP URBAN CONSULTANTS —— = JFOP ~\ HUAI cy POST-DEVELOPMENT SITE DISCHARGE (20% INCREASED RAINFALL INTENSITIES) Conduit Mitigated Outlfow from D3 to OUT = = x= ee) 41Y_25min[Max 0.011] 2Y_25min[Max 0.014] 5Y_25min[Max 0.016] 10Y_25min[Max 0.018] = —_ a] 20Y_25min[Max 0.020] 50Y_60min[Max 0.022] 400Y_60min[Max 0.025] 0.025 0.020 0.015 S |O ie 0.010 0.005 0.000 SSS S————_—_——— 1 Tue 1AM 2AM 3AM Jan 2019 Time DETENTION TANK STAGE-AREA-VOLUME DETENTION TANK STAGE - AREA - STORAGE RL(mAHD) Height (m) Area (m?) Area (ha) erate l Ale i Merete 0.00085 30.20 0.10 8.50 0.00085 0.850 09 30.30 0.20 8.50 0.00085 0.850 17 30.40 0.30 8.50 0.00085 0.850 26 30.50 0.40 8.50 0.00085 0.850 3.4 30.60 0.50 8.50 0.00085 0.850 43 30.70 0.60 8.50 0.00085 0.850 51 30.80 0.70 8.50 0.00085 0.850 6.0 30.90 0.80 8.50 0.00085 0.850 68 31.00 0.90 8.50 0.00085 0.850 77 31.10 1.00 8.50 0.00085 0.850 8.5 31.20 1.10 8.50 0.00085 0.850 9.4 31.30 1.20 8.50 0.00085 0.850 10.2 31.40 1.30 8.50 0.00085 0.850 144 31.50 1.40 8.50 0.00085 0.850 11.9 31.60 1.50 8.50 0.00085 0.850 12.8 31.70 1.60 8.50 0.00085 0.850 13.6 31.80 1.70 8.50 0.00085 0.850 14.5 31.90 1.80 8.50 0.00085 0.850 15.3 32.00 1.90 8.50 0.00085 0.850 16.2 32.10 2.00 8.50 0.00085 0.850 17.0 32.20 2.10 8.50 0.00085 0.850 17.9 32.30 2.20 8.50 0.00085 0.850 18.7 32.40 2.30 8.50 0.00085 0.850 19.6 32.50 2.40 8.50 0.00085 0.850 20.4 SITE BASED STORMWATER MANAGEMENT PLAN — Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.