Skip to the record
Search everything, all in one place.

Original source · versioned page text

3. Planning Report_14124

Attached to the e-mail MCU14/0102 Development Application Part 1 of 4 Cover letter, IDAS Forms App A Survey plan, App B Land use Survey, App C Pre-lodgement Minutes, App D Proposal Plans.

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Driveways and Carparking Code
The proposal is supported through the provision of a Traffic Impact Assessment (TIA) report
(provided in Appendix E), and is considered to comply with the relevant provisions of the
Driveways and Carparking Code.

Earthworks Code
The proposal will comprise the undertaking of bulk earthworks (cut and fill operations) and is
considered to demonstrate compliance with all relevant provisions of the Earthworks Code.
Refer to the Preliminary Bulk Earthworks Grading Plan in Appendix C of the Engineering
Services Report (provided in Appendix H).

Erosion and Sediment Control Code
Standard erosion and sediment control measures will be incorporated into the proposed
development and will be further detailed in a future operational works application. For
further details, refer to Councils Erosion and Sediment Control Assessment form provided in
Appendix I of the Stormwater Management Plan (Appendix G), which demonstrates that the
site is considered to be ‘low risk’.

Existing Services Code
As part of the proposal, the existing sewer easement to the north eastern corner and north
western corner of the site (Lot 31) will be abandoned and removed with a new sewer
connection point to be provided outside of the proposed building footprint and ‘zone of
influence’. Refer to the Engineering Services Layout Plan in Appendix C of the Engineering
Services Report (Appendix H).

It should be noted that a Build Over Sewer (BOS) application will likely be required to be
submitted to Unitywater, given that the north west corner of Lot 31 includes buildings
proposed to be constructed over the existing sewer reticulation network. This will be applied
for as part of the Building Works stage.

Transport, Roads and Drainage Code
As demonstrated in the TIA report (provided in Appendix E), the proposal will not adversely
impact the safety, capacity and operations of the existing road system.

Waste Management Code
An adequate waste storage and collection area is provided onsite, with the capacity for
appropriate separation, able to be provided where required.

Refer to the TIA which demonstrates that these storage areas can be adequately serviced
by the relevant waste collection vehicle.

Water Sensitive Design Code
The proposal will comply with the Water Sensitive Design Code through the following
measures:


December 2014        Industry, Hardware Store, Service Station, Shop & Cafe/Takeaway    Page 25
                       139 Eumundi Noosa Rd & 30 Lionel Donovan Dr, Noosaville
                                    Empirica Developments Pty Ltd
Log in to download the original file

3. Planning Report_14124.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.