Original source · versioned page text
Approved Document - Environmental Restoration Plan OPW25/0071
Plans and drawings: the text below has words only, no drawings.
APPENDIX E - Rehabilitation Monitoring Form and Success Criteria
□ 2025 – Jan - baseline
MONITORING □ 2025 – June – 6 months
SITE NAME: 1 Weemilah Court INTERVAL: □ 2026 - Jan - 12 months
□ 2026 – June – 18 months
ASSESSING OFFICER: DATE:
Criteria Rehabilitation Success Criteria Criteria achieved Notes / Observations
< 5% weeds present
1. Weed cover is minimal < 10% weeds present
Yes☐ No☐
< 25% weeds present
< 50% weeds present
> 95% plant survival at 6 months Yes☐ No☐
2. Plant survival meets
> 90% plant survival at 12 months Yes☐ No☐
minimum expectations
> 85% plant survival at 18 months Yes☐ No☐
3. Species composition
Flora species characteristic of the native vegetation
reflects preclear regional Yes☐ No☐
communities RE 12.11.2, 12.11.3 and 12.11.10
ecosystem
4. Tree growth is occurring Tree height in June 2025 _______ cm
Tree height in June 2026 _______ cm
5. Natural regeneration is
Monitoring indicates native species are recruiting Yes☐ No☐
occurring
No significant erosion is occurring that would
6. Landform is stable constitute a safety hazard, or compromise the site’s Yes☐ No☐
conservation values or downstream water quality
7. No downstream impacts No evidence of runoff or downstream impacts Yes☐ No☐
Weemilah Court Environmental Restoration Plan - 33
Document Set ID: 23744376
Version: 1, Version Date: 16/05/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.