Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.5    Pre-Development v Post-Development Flow Comparison

Table 4.4 below compares the pre-development Rational Method results from Section 4.2,
with the post-development XPSTORM model results from Section 4.3 to demonstrate the
requirement for stormwater detention.


                                   Peak Discharge Comparison (m3/sec)
                        Pre-Development        Post-Development
   Design Storm                                                          Difference        % Change
       (AEP)            Rational Method            XPSTORM


       63%                    0.089                  0.125                 0.036             40%
       39%                    0.114                  0.160                 0.046             40%
       18%                    0.158                  0.223                 0.065             41%
       10%                    0.198                  0.279                 0.081             41%
        5%                    0.236                  0.333                 0.097             41%
        2%                    0.301                  0.413                 0.112             37%
        1%                    0.346                  0.456                 0.110             32%
       Table 4.4 Pre-Developed Rational Method v Post-Developed XPSTORM Peak Stormwater Discharge



From Table 4.3 the proposed development will increase peak flows discharging from the
site, therefore stormwater mitigation will be required to demonstrate post-developed
stormwater discharge is consistent with pre-development characteristics in accordance with
the Noosa Plan (2020).




Site Based Stormwater Management Plan                                                       Page 7 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.