Log in to see the plans as drawn4.5 Pre-Development v Post-Development Flow Comparison
Table 4.4 below compares the pre-development Rational Method results from Section 4.2,
with the post-development XPSTORM model results from Section 4.3 to demonstrate the
requirement for stormwater detention.
Peak Discharge Comparison (m3/sec)
Pre-Development Post-Development
Design Storm Difference % Change
(AEP) Rational Method XPSTORM
63% 0.089 0.125 0.036 40%
39% 0.114 0.160 0.046 40%
18% 0.158 0.223 0.065 41%
10% 0.198 0.279 0.081 41%
5% 0.236 0.333 0.097 41%
2% 0.301 0.413 0.112 37%
1% 0.346 0.456 0.110 32%
Table 4.4 Pre-Developed Rational Method v Post-Developed XPSTORM Peak Stormwater Discharge
From Table 4.3 the proposed development will increase peak flows discharging from the
site, therefore stormwater mitigation will be required to demonstrate post-developed
stormwater discharge is consistent with pre-development characteristics in accordance with
the Noosa Plan (2020).
Site Based Stormwater Management Plan Page 7 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.