Log in to see the plans as drawn5.2 OPERATIONAL PHASE
The internal drainage system has been designed to include Stormwater Quality
Improvement Devices (SQIDs) in the water quality treatment train for the proposed
development.
Bioretention Basin
Bioretention basins are densely vegetated filtration devices, where runoff (for small/frequent
storm events) enters the basin and is filtered through a filter media layer (e.g. sandy loam)
as it percolates downwards. Bioretention basins often have an extended detention volume
above the filter media which increases the volume of runoff treated through the system. The
runoff is treated as it passes through the system through fine filtration, absorption, and some
biological uptake. Refer to Figure 5.1 below showing a typical cross section of a bio-
retention basin.
Figure 5.1 Typical cross section of a bio-retention basin
Bioretention for the development was sized according to Table B of Appendix 2 from the
SPP (2017) where the filter area is 1.5% of the contributing catchment area, therefore the
bioretention filter area required is 83m2. Refer to the Stormwater Drawings included in
Appendix A for the bioretention basin layout.
Site Based Stormwater Management Plan Page 14 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.