Original source · versioned page text
Site Based Stormwater Management Plan
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn8.0 LIMITATIONS OF THIS REPORT This Site Based Stormwater Management Plan (SBSMP) has been tailored to report on issues in the areas of interest, as detailed above. The information in this report is not to be used outside of the subject area. We consider that this SBSMP accurately considers conditions at the area of interest at the time the SBSMP was developed and based on information supplied to us by second and third parties. This SBSMP is to be reviewed if site conditions change in the future. This SBSMP has been undertaken for the specific purposes of HM Developments Pty Ltd, as detailed in our correspondence to them, and is solely for their use. This SBSMP should only be used in full and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Barlow Shelley Consulting Engineers. Barlow Shelley Consulting Engineers accept no liability with respect to the accuracy of information supplied by second and third parties. Site Based Stormwater Management Plan Page 17 of 19 2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.