Original source · versioned page text
Site Based Stormwater Management Plan
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEXECUTIVE SUMMARY Barlow Shelley Consulting Engineers Pty Ltd has been commissioned by HM Developments Pty Ltd to undertake a Site Based Stormwater Management Plan (SBSMP) for the proposed Industrial Development on Lot 6 on SP197517, 4 Taylor Court Cooroy, Queensland. An assessment of the stormwater quantity and quality requirements has been carried out in accordance with the Noosa Plan (2020) & PSP6 Engineering Design Standards – Roads, drainage, and earthworks. Post-developed peak stormwater will discharge from the subject site will be directed to the underground detention basin situated under the bioretention basin in the lower reaches of the site at the south-western corner. The detention basin is 94.5m3 in volume and will ensure non-worsening of stormwater flows to downstream properties, as site discharge will be mitigated to pre-development characteristics in accordance with the Noosa Plan (2020). A bioretention basin is proposed to treat stormwater from the proposed development, and was sized in accordance with the deemed to comply stormwater quality outcome specified in the SPP (2017), where the bioretention filter area is 1.5% of the contributing catchment area. The contributing catchment area flowing to the basin is 5,508m2, which requires a bioretention basin with a filter area of 83m2. The deemed to comply outcome satisfies the requirements of the P06 of Stormwater quality and protection of receiving waters from the Noosa Plan (2020). The Lawful Point of Discharge will be the existing drainage reserve south of the site, where the site is already provided an existing stormwater drainage outlet to. The Lawful Point of Discharge meets the requirements of QUDM (2016).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.