Original source · versioned page text
Site Based Stormwater Management Plan
Original PDF page 28, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn6.6
6.4
116.2
6.0 1 5.
117.11 7.00 1
116.60
SW
RY
EXISTING BOUNDA
SW
c:\users\kurt\desktop\2123 taylor court cooroy\acad\2123 opw set.dwg
DRAINAGE
RESERVE
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED INDUSTRIAL DEVELOPMENT 2123
A 15-12-2021 FOR APPROVAL KE DB LOT 4 TAYLOR COURT, COOROY
DATUM AHD SHEET: 8 OF 10
0 5.0 10 15 20 25m MAROOLINGAR P/L ATF TWENTY20 UT
DESIGN KE
................. DRAWING TITLE: DRAWING NUMBER REV
DRAWN KE Director: CAMERON LANDRETH
SCALE 1:500 A3 Director: TONY SHELLEY
(RPEQ p 07 5443 8285 STORMWATER DRAINAGE CATCHMENTS R08 A
DESIGN CHECK CL (RPEQ19358)
7736)
This drawing is not to be copied or amended without written permission from e [email protected] w www.barlowshelley.com.au
DATE DEC-2021 Barlow Shelley Consulting Engineers a PO Box 899 Maroochydore 4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.