Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Site Based Stormwater Management Plan

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
What are the impacts? exam Bal J

Sol, sediment and litter rom building sites can be major
sources of stormwater polation, and can use:

Erosion and se

Controlling stormwater pollution
Na tees)

HEALTHY WATERWAYS =

 

 

  
   

negative impacts on recreational hing and
the seafood indusey

sediment buikép within waterways which

can leas to weed growth

loss of valuable topsoil

sigalicant public safety problems when washed
nto roads and intersections "Mut and dt on road ater rain dv 0 poor
blocked drains and water sensitive urban design

features leading 0 fooding ard inceased
maintenance cos to the community

 

significant harm tothe environment of freshwater
and marine systems through the loss of valuable
seagrass for marine creatures

  

public echt

 

1s rom increased algal blooms
reduced recreationel opportunities due te increased
uriiy

tough Jampinpin

 

ent control on residential bi

 

Peneples of effective stormaster pollution contol include

sonable te planning
diversion of upslope water where appropiate)
stabllzed se entry/ext point

minimisation of ste disturbance and duration of
diswroance

instalation of sediment contol along the lower
edge of the site

appropriate location and protection af stockpiles

‘early connection of roafuater downpines

 

trap on-site runefl from teal, paint and concrete
washing and brie, tle and conerete cutting
continual monitoring and maintenance of al
compaction of backed trenches

revegetation and stabilsaion of the site
development and implementation of Erosion
fre Sediment Cortrel Management Plans

when appropriate

 

Control measures in pce ona resident bulang ke

ro

CU) Introduction

These guidelines provide a practical uide to best
practice tecinigues to minimise stormaater pluton fram
bulding sites. They ae cesigned to help people involved
inthe bulling industy comply wth ther satutory
‘cvironmental utes and avo arg ‘nes.

The following fact sheets provide practical examples

cof recommenced contral measures. Inckided i 3 easy
tonfllow day ste checklist to gue te supervisors

 

 

Ce Holy '

@ Loven anc secant conta on rien
eee bulking ses

.ge of materials on hare surfaces H @ Erosion control

@ Sediment contol

@ Drainage cont

@ Baling operons

@ Storage of matorab on hard sroas

@ Grouped buteing ot

@ Erosion and Seciment Control Management Plans

CSE U UE er Lt BEST PRACTICE

Perea a ns Ben practise maragonant ofan acy. se
‘rvionrantl harm i minimised wing cosvafectve

roe measures. These practices are sisessed against naonal

Sr intemstonal andar

SAVE MONEY TIME AND ENERGY

Some of the benefits ta home owners, bulders anc
the bailing industry include:

eee eee

    

 

improved wet weather working conditions
sites 00 not get be

 

Tess mud ani oust problems
reduced stockpile leeee
ddearvup cos
ser puolic mage
more marketable sites
fewer puoic complaints
resiced risk of fines
beter fishing for everyone

eo

  

 
 

or waterways
1 itemational experience shows th
cost of atective pollution management on aulding ses
is gready reduced within the rst few years at builders,
become experianced wth the various techniques,

 

ea

 

‘of contol devices needed forthe sediment contol zone, and thir interference wih the bung process

wit a litle forward thinking. Suggastons ae te:

   
   

 

+ minimise the reshaping ofthe land
+ direct stormmater to flow around the busing area and any unstable ba
+ allow room fora sediment bares, eg, sediment fence, to be located al

  

+ design the home to sult the property type, eg. construct pole homes on steep properties

 

+ avoid the permanant use of long, steep and unetable driveways

avoid the use of exposed aggregate concrate surfaces in areas where the wash-off cannot be contained

peas

  

sediment fence, Pater rd tot
Stood outside Euidng st

Environmental law ex=e=p

Tho Environmental Protection Act 1994, Envionmental Protection Water) Policy 1997 and the Integrated Planing
‘Act 1997 ae mportant pieces of legislation that control the way in which sol erosion and sediment are required to
bbe dealt with on buleing and development sites

Greaches ofthe Environmental Protection (Water Policy
1997 may eau in

 
  

+ onthe spot fines under the Environmental Protection
(Water) Policy 1997 ranging from $300 to $400)

+ proseeutens under the Intagrated Planning Act
1997 or the Environmertal Protection Act 199%
(fires of thousands of collars or prison sentences
for serious ofonces)

 

  
 

“+ the prosecution of inchiduals and/or companies Cowal acer emplanng the Environmental Potectan
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.