Site Based Stormwater Management Plan
Original PDF page 35, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFly contain concrete waste woshed from trucks ond mixer units on-site and stoe where it eannet be washed ffom the ste, harming the environmen + Builders need to demonstrate how they intend to prepare exposed aggregate surfaces without allowing cement resicue ta law into stormwater drains or waterways + Whore practicable, wash cement residue onto pervious surfaces or fuly contain it within temporary sediment dams created fom tightly stacked sand bags. + When suitably ory, shovel coment residue into 3 waste disposal bin + Ato tine should cement residue or wastewater run-off enter the roadside gutta This may make it impractical on seme sts for exposed aggregate driveways to be constructed, In such cases, an alternative drvemay nih must be used Storage of materials on hard surfaces ex===p Whenever posible, materials should be stockplld win the sadimant nial zone and, where necessary, covered with waterpry sheeting to nim se he potential for transport af sed ments in stormwater, Materials may be temporal stored on hard surfaces only whore necessary to piece erodible meterial on hard surfaces to uncertake work and no other reasonable options ae avaiable Dent store stockpiles on ard watace without sible protection Grouped building lots ex===p When one bulder controls more than one building lot, combined:-ot sediment contol structures may be place ddown-slope i + the combined zeciment control measures prove @ love of protection atleast equal t th ineivival lat protection rovided by ‘+The builder accepts responsiblity forthe ongoing monitoring and maintenance of sediment contol devices 1+ suitable drainage and eresion convo! measures ae applied to each bulding +a suitable sign is placed in prominent lecation ouside each lt and/or atthe entrance ofthe ‘estate indicating such controls are in place ames | HIA Creer cam ted Dene ecen rg HEALTHY WATERWAYS <2p,_ cee ar aa Erosion and Sediment Control Management Plans exza=p Where appropriate, discuss the submission of # management pian with the appropriate bulging control body ‘Those plans need to communicate to all - builders, subcontractors, private ceriers, home onmars and regulators, Involved in the building ~ how stormwater polation will be controled on the site Establish a single stabilised enty/ext point rumble pad. Install sediment fonts along the low sie ofthe site Divert up-alope water around the werk site and appropriately stabilise any drainage channels Clear only the areas necessary (maintaining vegetation on footpath Stockpile top| within the sediment cont Stabile ex sed carh banks (for example, with vagetation or erosion contol blankets waste receptacles (minskips, bins, wind: poof litter receptors. practicable 6 root lid Ensure that all contol measures ae maintained in good werking order 10, Revagetate or otherwise stabilise the site lctted bain th sdinant fence rckpls hae not been paced behind tho secant free Tr ecip wel mawtined
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.