Original source · versioned page text
Site Based Stormwater Management Plan
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Rational Method Calculations
Job Number 2123 IFD NOOSA NEW IFD
Address Lot 1 Taylor Court, Cooroy By VV
Pre- Development Scenario Post- Development Scenario
Ref 1 Catchment Details Catchment Details
Area 0.5677 ha Area 0.5677 ha
fi 0.00 fi 0.95
C10 0.7 C10 0.89
I10 74.2 mm/hr I10 74.2 mm/hr
Ref 2 Standard Inlet Time
Time 8 mins
Ref 3 Overland Sheet Flow (Friend's Eqn)
Length 83 m
Slope 5.4 %
Surface 'n' poor grass 0.035
Time 12 mins
Time of Time of
12 mins 8 mins
Concentration Concentration
Peak Discharge Calculations
Pre-Developed Peak Discharges Post-Developed Peak Discharges
Design
Frequency
Storm Area (ha) Cy Iy (mm/h) Qy (m3/s) Area (ha) Cy Iy (mm/h) Qy (m3/s)
Factor (Fy)
(AEP)
63% 1 0.5677 0.80 0.56 101 0.089 0.5677 0.71 111 0.125
39% 2 0.5677 0.85 0.60 122 0.114 0.5677 0.76 134 0.160
18% 5 0.5677 0.95 0.67 151 0.158 0.5677 0.85 167 0.223
10% 10 0.5677 1.00 0.70 179 0.198 0.5677 0.89 199 0.279
5% 20 0.5677 1.05 0.74 204 0.236 0.5677 0.93 226 0.333
2% 50 0.5677 1.15 0.81 237 0.301 0.5677 1.00 262 0.413
1% 100 0.5677 1.20 0.84 261 0.346 0.5677 1.00 289 0.456
Ref 5 Advice on Selection of AEP design events for various scenarios
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.