Site Based Stormwater Management Plan
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Node - Site to Detention Basin
ECN_63pct_15min_10[Max 114.993] ECN_0.5EY_15min_10[Max 115.254] ECN_0.2EY_15min_10[Max 115.523]
ECN_10pct_15min_10[Max 115.678] ECN_5pct_15min_10[Max 115.869] ECN_2pct_15min_10[Max 115.837]
ECN_1pct_15min_10[Max 115.994]
116.0
115.5
115.0
Stage
114.5
114.0
1 Mon 1AM 2AM 3AM 4AM
Jan 2018 Time
[OCR of page images]
ECN_63pct_15min_10[Max 114.993]
ECN_10pct_15min_10[Max 115.678]
ECN_1pct_15min_10[Max 115.994]
116.0
115.5
115.0
Stage
114.5
114.0
1 Mon
Jan 2018
Node - Site to Detention Basin
ECN_0.5EY_15min_10[Max 115.254]
1AM
fT
ECN_5pct_15min_10[Max 115.869]
2AM
Time
ECN_0.2EY_15min_10[Max 115.523]
ECN_2pct_15min_10[Max 115.837]
3AM
4AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.