2017-11-13 General Committee Agenda
The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General Committee
Meeting
Monday, 13 November 2017
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 63 sections
Section 2
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE -
1 AMENDMENTS TO THE NOOSA PLAN 2006
(Planning & Environment Committee Agenda, 7 November 2017, Item 1, Page 3)
Reason for referral – For a further report (refer to item 4)
2 REC17/0011 – DEVELOPMENT PERMIT FOR RECONFIGURING A LOT (2 LOTS
INTO 21 LOTS) AT 29 AND 35A TAIT STREET AND 20 EAGLE DRIVE, TEWANTIN
(Planning & Environment Committee Agenda, 7 November 2017, Item 5, Page 25)
Reason for referral – For further consideration.
3 132005.220.05 & OPW12/0031.02 – APPLICATION FOR EXTENSION TO
CURRENCY PERIOD FOR A PRELIM. APPROVAL TO OVERRIDE PLANNING
SCHEME, DEVELOPMENT PERMIT TO RECONFIGURE A LOT & DEVELOPMENT
PERMIT FOR OPERATIONAL WORKS AT 70 CARPENTERS RD & 25 JARRAH ST,
COOROY
(Planning & Environment Committee Agenda, 7 November 2017, Item 7, Page 49)
Reason for referral – For further consideration.
ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE -
Nil.
REPORTS DIRECT TO GENERAL COMMITTEE 3
4 FURTHER REPORT - AMENDMENTS TO THE NOOSA PLAN 2006 3
5 MCU17/0054 - DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE OF
PREMISES - RETAIL BUSINESS TYPE 2 - SHOP, SALON & ENTERTAINMENT &
DINING BUSINESS TYPE 1 - FOOD & BEVERAGES AT 11 - 19 HILTON
TERRACE, TEWANTIN 6
6 ASSET MANAGEMENT AND DESIGN SERVICES TEAM RESOURCING
ARRANGEMENTS 48
7 FINANCIAL PERFORMANCE REPORT - OCTOBER 2017 56
CLOSED SESSION -
Page 2 of 64
Section 3
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
REPORTS DIRECT TO GENERAL COMMITTEE
4 FURTHER REPORT - AMENDMENTS TO THE NOOSA PLAN 2006
Author Planning Scheme Project Manager, Raul Weychardt
Environment and Sustainable Development Department
Index ECM/Subject/ Noosa Plan Amendments
Attachments Nil
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the reports by the Planning Scheme Project Manager to the Planning &
Environment Committee dated 7 November 2017 and the General Committee Meeting dated 13
November 2017, and:
A. Resolve under section 18 of the Planning Act 2016 to amend The Noosa Plan 2006 by
introducing new provisions for Multiple Housing Type 2 Duplex and correcting minor errors
and inconsistencies in accordance with Attachment 1 of the report by the Planning Scheme
Project Manager dated 7 November 2017;
B. Authorise the Chief Executive Officer to :
1. Forward the proposed amendments to the Minister for state interest review;
2. Undertake public consultation and review submissions; and
3. Subject to submissions not raising material issues, adopt the proposed amendments
and place a public notice in the government gazette; and
C. Resolve to amend The Noosa Plan 2006 under the Alignment Amendment Rules made by
the Planning Minister under section 293 of the Planning Act 2016, as outlined in
Attachment 2 of the report by the Planning Scheme Project Manager dated 7 November
2017, and authorise the Chief Executive Officer to effect the amendments.
REPORT
This is a supplementary report to an earlier report presented to the Environment & Planning
Committee meeting of 7 November 2017. That report proposed amendments to The Noosa Plan
including the addition of special provisions for Multiple Housing Type 2 Duplex to facilitate a small
and second dwelling to be erected on residential sites in conjunction with a detached house. This
part of the amendments was discussed and some issues raised.
At the Committee meeting, Councillors raised:
information about recent approvals for secondary dwellings,
an indication of how many existing urban house sites may be suitable for the additional
small dwelling, as proposed,
a preference for the small dwelling to be occupied by residents rather than by short term
visitors, in recognition of the housing need for additional small dwellings, and
the imposition of rates to account for the additional demands on Council infrastructure and
services as a consequence of the additional dwelling.
Page 3 of 64
Section 4
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Approvals for secondary dwellings
At the Environment & Planning Committee, staff advised that relative’s apartments had been
approved at approximately the rate of one per month prior to the introduction of the secondary
dwelling definition. Since then some 38 secondary dwellings have been approved over a period
of 13 months.
Existing urban house sites suitable for an additional small dwelling
Information will be provided at the General Committee meeting.
Residents occupying the small dwelling
The definition multiple housing specifies that the premises are to be occupied by permanent or
semi-permanent residents, with the occupants may share common facilities on the site. The
definition visitor accommodation includes resident guests stay protect free period of time typically
not exceeding three consecutive months.
Under the circumstances the type of multiple dwelling referred to in this report is not intended for
use by short term visitors. Councillors raised the prospect of a condition on a development permit
in regard to occupation. However, the amendments propose the land use is ‘accepted
development subject to requirements’ and is therefore assessed by the building certifier and no
development permit is issued by Council.
Imposition of particular rates on the site to offset charges that do not accrue as the site is not
divided.
Councillors noted that as the site is not divided, the property will continue to be rated as a single
lot notwithstanding that there are two dwellings situated thereon. Finance staff will further
investigate what options may be available and report to a future budget process.
Previous Council Consideration
See related report to the Planning & Environment Committee dated 7 November 2017.
Finance
The Director Corporate Services will consider whether special rating provisions should apply to
the particular type of Multiple Housing Type 2 Duplex referred to in the report.
Risks & Opportunities
See related report to the Planning & Environment Committee dated 7 November 2017.
Consultation
External Consultation - Community & Stakeholder
See related report to the Planning & Environment Committee dated 7 November 2017.
Internal Consultation
See related report to the Planning & Environment Committee dated 7 November 2017.
Page 4 of 64
Section 5
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Departments/Sections Consulted:
X Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
X Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 5 of 64
Section 6
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
5 MCU17/0054 - DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE OF
PREMISES - RETAIL BUSINESS TYPE 2 - SHOP, SALON & ENTERTAINMENT &
DINING BUSINESS TYPE 1 - FOOD & BEVERAGES AT 11 - 19 HILTON TERRACE,
TEWANTIN
DOCUMENT INFORM AT ION
Author Coordinator Planning, Patrick Murphy
Environment and Sustainable Development Department
Index ECM/ Application/ MCU17/0054
Attachments 1. Design and Landscaping Plans
2. Infrastructure Agreement
APPLICATION DETAILS
Applicant Tewantin Retail P/L
Proposal Development Permit for Material Change of Use of Premises -
Retail Business Type 2 - Shop & Entertainment & Dining
Business Type 1 - Food & Beverages
Properly Made Date 25 May 2017
Information Request Date 19 June 2017
Information Response Date 4 July 2017
Decision Due Date 16 November 2017
Number of Submissions 0
PROPERTY DETAILS
Property Address 11 – 19 Hilton Terrace Tewantin
RP Description Lot 2 RP 152351
Lot 3 RP 152351
Lot 4 SP 133160
Land Area 3662m²
Existing Use of Land Mixed use retail and industrial
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Tewantin & Doonan
Zone Neighbourhood Centre
Overlays Natural Hazards Overlay – Flood hazard
Natural Hazards Overlay – High Potential Acid Sulfate Soils
Assessment Type Code
Page 6 of 64
Section 7
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting
dated 13 November 2017, regarding Application No. MCU17/0054 for a Development Permit for
Material Change of Use of Premises - Retail Business Type 2 - Shop & Salon and Entertainment
& Dining Business Type 1 - Food & Beverages, situated at 11 – 19 Hilton Terrace, Tewantin and:
A. Approve the application subject to the following conditions
1. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
DA-07.1216.2D D Site Plan/Floor Plan prepared by Andrew 14.06.2017
McKellar Design
DA-07.1216.3D D Roof plan prepared by Andrew McKellar Design 14.06.2017
DA-07.1216.4D D Elevations prepared by Andrew McKellar Design 14.06.2017
DA-07.1216.5D D Sections prepared by Andrew McKellar Design June 2017
DA-07.1216.6D D Sections prepared by Andrew McKellar Design June
Nature and Extent of Approved Use
2. The approved use must not operate outside the hours of:
a. 6am to 10pm Monday to Thursday
b. 6am to 12pm Friday and Saturday
c. 6am to 10pm Sunday or any public holiday
The requirements of this condition must be included in the Community Management
Statement for any body corporate for the subject site.
3. The outdoor dining areas must not exceed 30m2 and 35m2 as shown on the
approved plans and must not be used after 10pm each night.
4. The approved uses must not cause nuisance as a result of noise emission.
5. Entertainers or speakers used to amplify noise must not be located in any outdoor,
verandah, patio, footpath or beer garden area of the premises.
Building Appearance
6. Ground floor shopfront glazing along the frontages must be fully transparent to a
minimum of 65% of the street frontage to allow passive surveillance and encourage
social interaction, and must be provided at full height (floor to ceiling).
7. The external finishes of the building must include a mix of materials, variation in roof
form and extensive eaves as shown on the Approved Plans.
8. All mechanical equipment and other service infrastructure located on the site must
be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street
frontages nor adjoining properties. Where screened by landscaping,
landscaping beds must be at least 1.5 metres wide.
Page 7 of 64
Section 8
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Soil Contamination
9. As part of any Operational Works application for the site a detailed site contamination
assessment report prepared by a suitably qualified and experienced person in
accordance with the procedures and practices detailed in the National Environment
Protection (Assessment of Site Contamination) Measure 1999 (NEPM) is
required. The report must conclude:
a. whether the site is suitable for the proposed new use/development (with and
without remediation and/or management);
b. whether any site contamination is causing, or is likely to cause, ‘environmental
harm’ (as defined under the Environmental Management and Pollution Control
Act 1994); and
c. whether any site contamination presents an occupational health and safety risk
to workers involved in redevelopment of the site.
10. If the site contamination assessment report concludes that remediation and/or
management strategies are necessary to avoid risks to human health or the
environment, a proposed remediation and/or management plan must be submitted to
Council prior to the commencement of building works. Any remediation or
management plan involving soil disturbance must include a detailed soil and water
management plan to prevent off-site transfer of potentially-contaminated soil or
stormwater.
NB: It is mandatory for any contaminated land investigation documents, including
investigation reports, validation reports and draft site management plans to be
certified by an approved auditor and must have approval from the Department of
Environment and Heritage and Protection (DEHP). DEHP have list of approved
auditors.
Site Access and Driveways
11. A sealed access driveway must be provided from Ernest Street and Earl Street to all
parking and manoeuvring areas of the development. The works must be undertaken
in accordance with an Operational Works approval and must include in particular:
a. driveway crossovers in accordance with Council’s standard drawing RS-051
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning signage
must be provided near the driveways to warn motorists of pedestrian movement
along the street frontages
12. All vehicles must enter and leave the site in a forward direction.
Car Parking
13. A minimum of 38 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. pedestrian routes in accordance with the approved plans
b. provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
c. 1 disabled parking space/s within the total
d. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities
Page 8 of 64
Section 9
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
14. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
15. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Service Vehicles
16. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. regular access for a Waste Collection Vehicle
17. Service vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 6am to 6pm Monday to Saturday and
not at all on Sundays or public holidays. The requirements of this condition must be
included in the Community Management Statement for any body corporate for the
subject site.
Pedestrian and Bicycle Facilities
18. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. Internal pedestrian footpaths in accordance with the approved plans
b. a total of 12 bicycle parking spaces
c. end of trip facilities involving 12 lockers, 1 male and female shower and change
rooms.
Public Safety
19. All ground floor shopfront glazing must be protected against vandalism by the use of
a form of safety glass such as toughened or laminated glass.
20. During operating hours, all parking areas, pedestrian areas and entrances/exits to all
stairwells, foyers and public toilets must be well lit with vandal resistant lighting and
with intensities to satisfy the requirements of Australian Standard AS1158 “Public
Lighting Code”. Lighting must be designed to reduce the contrast between shadows
and well lit areas. In particular, appropriate security lighting must be provided in the
location shown at the corridor servicing the toilets and change room.
Electricity and Telecommunication Services
21. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
22. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
23. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
Page 9 of 64
Section 10
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
24. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
25. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
26. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
27. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
28. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Landscaping Works
29. The development site must be landscaped prior to the commencement of use. The
works must be undertaken in accordance with an Operational Works approval and
the Noosa Plan for that specific area and must include in particular:
a. the landscape areas shown on the approved Site Plan/Floor Plan prepared by
Andrew McKellar Design dated 14.06.2017.
b. a minimum 2-metre-wide landscaping strip along the Ernest and Hilton road
frontage of the subject site, exclusive of the access driveway, generally
uncompromised by infrastructure items.
c. Any retaining walls must be setback from the front boundaries as shown on the
Approved Plans and screened with landscaping. Landscaping plans must
clearly show any retaining structure and adequately demonstrate how these
structures will be permanently screened with native vegetation.
d. all letterboxes located inside the development or in a position which does not
visually dominate the frontage.
e. details of the rendered wall finish on the Hilton terrace frontage, which can
include stone facing or other natural looking finishes and complement the
proposed landscaping.
f. sub-terrain tree planting area demonstrating at least 4m³ area of structured
soils per tree is available for root growth and is not subject to compaction.
g. Provision of 100L Melaleuca quinquenervia along the frontage.
Page 10 of 64
Section 11
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
h. Details and depths of all landscaping soils, especially where subject to
compaction relating to filling of the site.
i. Plant selection generally as shown on the landscape documentation.
j. Bio-basin landscape plants must include a mixture of at least five of the
following species for planting in the bio-retention basin extended detention
surface at a minimum density of 8 plants/m²:
i. Carex appressa
ii. Carex fascicularis
iii. Ficinia nodosa
iv. Juncus usitatis
v. Lomandra longifolia
vi. Ghania sieberiana
30. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
31. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and be generally in accordance with the submitted Stormwater
Management Plan - Revision A dated 19 April 2017, prepared by Switchback 48
Consulting.
33. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property. Plans submitted for the
Operational Works approval must include calculations in accordance with
Queensland Urban Drainage Manual for any overland flow discharge areas to confirm
that scour will not result from the development.
34. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
the Bio-retention Technical Design Guidelines (Water by Design, 2012), and must
include in particular:
a. stormwater quality treatment devices of a size and location of 30m2 plus 25m2
generally in accordance with those shown in section 2 of the of the Stormwater
Management Plan for 11-19 Hilton Terrace Tewantin by Switchback Consulting,
dated 19 April 2017.
b. Bio-retention devices which:
i. are designed generally in accordance with the Water by Design Technical
Design Guidelines for bio-retention basins
i. are provided with a free-draining outlet from the sub-soil drainage system
ii. swales which are designed in accordance with the Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland
iii. have batters around the entire perimeter, or where demonstrated that is
not feasible, have retaining structures only of the maximum size
recommended within the Water by Design Technical Design Guidelines
for bio-retention basins.
Page 11 of 64
Section 12
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
35. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a
detailed life cycle costing of the system attached as an addendum. Records of all
maintenance activities undertaken must be kept and made available to Council upon
request.
36. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
(Version 1) document and must include the full cost of maintaining the system in
accordance with that document.
37. The applicant must submit plans for approval with the operational works application
for the inclusion of educational signage or stencilling to be incorporated within the
development to ensure patrons are reminded to minimise waste and place it in bins.
Stormwater Harvesting
38. Operating underground stormwater harvesting tanks must be provided for the
development. The tanks must be provided in accordance with an Operational Works
approval and must include in particular:
a. a total tank capacity of a size suitable to maintain expected non-potable and
outdoor uses for a 2 month period without rain.
b. a minimum catchment of 50% of the building roof area.
c. re-use of harvested rainwater for internal non-potable uses and outdoor uses.
39. Certification must be submitted to Council from a qualified person which certifies that
the rainwater collection tank/s and associated reticulation has/have been installed in
accordance with the requirements of this Decision Notice.
Acid Sulfate Soils
40. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a suitably qualified
person and referenced in a Development Permit for Operational Works. The Acid
Sulfate Soil and Groundwater Management Plan submitted with the application for
Operational Works must detail:
a. Management necessary for the proposed filling to avoid any impacts of the
Potential Acid Sulfate Soils identified on the site – in particular impacts related
to compacting Acid Sulfate Soils into the groundwater table and releasing water
contaminants.
b. design measures necessary to prevent any oxidation of the potential acid
sulfate soils or transfer of acid sulfate soil leachates via dewatering of
groundwater through underground pipe bedding material.
c. Any other matters necessary to prevent the oxidation of potential acid sulfate
soils or release of Acid Sulfate Soil related water contaminants.
41. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
a. 50mg/L maximum total suspended solids concentration
b. 0.3mg/L maximum total iron concentration
c. 0.2mg/L maximum total aluminium concentration
d. no visible plume at either the point of release from the site or within a waterway
Page 12 of 64
Section 13
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
B. Enter into an Infrastructure Agreement with the applicant that provides for the acquisition of
part of the site, compensation for this land acquisition, frontage works being undertaken by
Council, demolishing of the existing building and car parking in lieu of 8 on-site car parking
spaces.
REPORT
1. PROPOSAL
This application seeks a Development Permit for a Material Change of Use for a 955m²
convenience shopping centre at 11, 15, 17-19 Hilton Terrace, Tewantin. Twelve separate
tenancies are proposed within a single storey retail building. The tenancies will range from 60m²
to 125m² in area. All existing buildings and accesses are to be removed as part of the
application.
The locality and site plans are included below, with design and landscaping plans included as
Attachment 1.
Figure 1 – Aerial of the site
Page 13 of 64
Section 14
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Figure 2 – Aerial of the site
Two of the tenancies are proposed to be used for the purpose of Entertainment and Dining
Business Type 1 (Food and Beverage), each with an associated outdoor dining area. The
remaining tenancies are proposed to be used for the purpose of Retail Business Type 2 (Shop
and Salon).
The proposed convenience centre will be accessed from Earl and Ernest Streets. 38 car spaces
are to be provided on site and will be situated between the building and the Hilton Terrace
frontage. 8 car spaces are to be developed on Hilton Terrace.
Due to the requirement for the floor level of the building to be above the flood level a gradual
change of grade from 1.1m AHD at the Hilton Terrace frontage to 2.5m AHD within the tenancies
is required.
A mix of materials is proposed for the building including:
DecoBlade wood grain vertical sun slats
Laser cut aluminium screens with powder coat finish
Colourbond trimdeck roofing with a 5 degree roof pitch
Decowood shadowline horizontal cladding
Horizontal fibre cement awning
Rendered and painted block work
Aluminium framed joinery windows
Landscaping is designed to incorporate on site stormwater treatment in bio-retention devices.
Pedestrian access ramps are located along all street frontages allowing for pedestrian access to
the tenancies in accordance with Disability Discrimination Act requirements.
Waste storage and maneuvering areas are located in the south eastern corner of the site.
Page 14 of 64
Section 15
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
The application is before Council due to the significance of the site and the requirement for an
Infrastructure Agreement to be entered into. The Infrastructure Agreement is required as Council
is upgrading the Hilton Terrace – Ernest Street intersection and these works necessitate the
acquisition of 135m² of land from the subject site. Furthermore, the Infrastructure Agreement is
required as the frontage works which are usually part of a development approval (kerb and
channeling, pedestrian footpath, crossovers etc) and additional works specific to this site and
application (on street car-parking bays on Hilton Terrace and relocation of Telstra services) are to
be undertaken by Council at the applicant’s expense.
The following images detail the site, elevation and perspectives of the proposed development:
Figure 3 – Proposed site plan
Figure 4 – Proposed elevations
Page 15 of 64
Section 16
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Figure 5 – Perspective of the development
2. SITE DETAILS
2.1. Background
Previous land use and encroachment
The most relevant history of the site relates to the existing building which is situated in the north-
eastern corner of the site at the Hilton Terrace and Ernest Street intersection. Historically the
building has been associated with a mechanical repairs workshop/service station with an
associated petrol tank situated underground in the road reserve. Approximately 22m² of the
existing building encroaches into the road reserve.
The underground petrol tank has been removed at which time BP undertook an investigation into
soil contamination within the road reserve. Due to the hardstand surface associated with subject
site no investigation was able to be undertaken within the site at the time. The investigation
identified the presence of some contamination in the soil.
Pre-lodgement meeting
The applicant and Council officers held a pre-lodgement meeting on the 12 January 2017.
Council requested that prior to lodgement of an application, a Council appointed architect and the
designer review the plans to ensure the best outcome for the site and locality given the
prominence of the site at the entrance to Tewantin.
The owner subsequently agreed to Council engaging an architect (nra-co-lab) to review the
design plans prior to lodgement and to pay Council for this cost. The peer review suggested
improvements to the overall layout and design.
The architect review included recommended improvements to the built form including the roof
form, landscaping, location of waste storage areas, pedestrian movement and bicycle parking
The applicant responded to the recommendations and the resultant design which forms the
current application has incorporated recommended design improvements.
The pre-lodgement meeting also raised issues about the site’s integration with Council’s capital
works plans for the Hilton Terrace and Ernest Street intersection.
2.2. Site Description
The site currently includes three separate titles known as 11, 15 and 17 - 19 Hilton Terrace
Tewantin.
885m² of shops are situated on 11 Hilton Terrace. A veterinary practice within a 200m² existing
timber building is situated at 15 Hilton Terrace and a caravan sales (approximately 500m²) and
boat repair workshop (approximately 360m²) are situated at 17 – 19 Hilton Terrace.
Page 16 of 64
Section 17
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
The combined area of the three lots is 3,665m². The site is located on a prominent corner
adjoining three roads, including Hilton Terrace for 81m to the north; Earl Street to the west for
40m; and Ernest Street to the east for 40m.
The site is relatively flat and is prone to flooding by the Noosa River. The north-western corner of
the site is 1.08m AHD and the highest point of the site has a finished floor level of 2.11m AHD in
the north western corner.
Existing power poles are located within the Ernest Street and Earl Street frontages.
Telecommunications and water are available within the existing road frontages. Stormwater,
parking, and kerb and channelling along the frontages are variable at present.
2.3. Surrounding Land Uses
North: Hilton Terrace and residential properties containing a mix of dwelling types.
South: Adjoining the site to the south is the United Synergies (not for profit support agency) and
Tait Duke House, all Council owned community buildings.
East: Ernest Street and residential properties containing a mix of dwelling types.
West: Earl Street is surfaced for approximately the first 50 metres and then becomes a dirt road
which terminates at the southern boundary of the Tait Duke House site
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
The application was submitted 25 May 2017 and accordingly, is to be assessed under the
Sustainable Planning Act 2009. Under the Sustainable Planning Act 2009, the application must
be assessed against each of the following statutory planning instruments to the extent they are
relevant to the development:
State Planning Policies;
the South East Queensland Regional Plan;
State Planning Regulatory Provisions;
any Structure Plan or Master Plan in place for declared areas;
any Preliminary Approval Overriding the Planning Scheme for the land;
the Planning Scheme for the local government area; and
any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy has been deemed by the Minister for Local Government and Planning
as appropriately reflected in the Planning Scheme and therefore does not warrant a separate
assessment.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions.
Page 17 of 64
Section 18
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against each of the following codes to the extent they are
relevant to the development:
Tewantin & Doonan Locality Code;
Natural Hazards Overlay Code (Flooding and Acid Sulphate Soils)
Business Uses Code;
Landscaping Code; and
Engineering Works Codes
Locality Provisions
The subject site is located in the Tewantin and Doonan Locality and is zoned Neighbourhood
Centre. The proposed use is identified as a consistent use within the zone and is required to
follow a code assessable application process.
The following provisions of the Tewantin and Doonan Locality Code are relevant to the
assessment of the application:
12.7.2 The overall outcomes sought for the Tewantin & Doonan Locality are the following
a) New uses and works are located, designed and managed to—
i be compatible with other uses and works;
ii maintain the safety of people and works;
iii avoid significant adverse impacts on the amenity enjoyed by users of other
premises including acoustic and visual qualities; and
iv avoid significant adverse effects on the natural environment, including native
habitat removal, fragmentation and attrition;
n) Tewantin is a vibrant riverside and lakeside urban area with a traditional town
character and identity within a vegetated, waterfront setting;
o) Tewantin maintains the atmosphere of a small country town with residents
enjoying high levels of convenience and accessibility to urban services;
qq) For the Neighbourhood Centre Zone—
i Neighbourhood Centres form focal points for the local community and
visitors, providing shops, offices and limited higher order services to support
the day-to-day needs of residents and visitors; and 12-35 The Noosa Plan
Including amendments to 3 July 2017
ii Business Uses offer local employment opportunities, encourage equitable
access to services and are of a scale and character consistent with the
locality and Noosa’s retail hierarchy;
The proposed development is aligned with the relevant provisions of the Locality Code.
The proposed uses are consistent uses within the Neighbourhood Centre zone and will provide
for the day-to-day needs of the local community and also contribute to local employment. The
inclusion of two food and dining premises with associated outdoor dining area will provide for an
active and vibrant street frontage. It is noted that some of the current uses of site, caravan sales
and a boat repair workshop, are inconsistent uses within the Neighbourhood Centre Zone.
The development provides for a significant improvement of built form when compared to the
existing development on the site which is situated at a prominent gateway to Tewantin. The new
development is respectful of the character of the area through the use of mixed materials, broken
roof form and provision of significant eaves to the Earl, Hilton and Ernest frontages.
Page 18 of 64
Section 19
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
The timing of the development allows for the design outcome to consider the design of Council’s
planned upgrade works to the Hilton Terrace-Ernest Street intersection. The resultant outcome
provides for a development which will integrate positively with the improved pedestrian
arrangement resulting from the intersection upgrade. Users of the new development will therefore
be able to safely navigate to and within the proposed development.
Compliance with key provisions of the planning scheme is detailed in the following table.
Planning Scheme Requirement Proposal Complies
Site cover
a) 0.8:1 for the first 2,000m² of site areas; 1,227m²
plus 34%
b) 0.3:1 for the balance of the site areas in
excess of 2,000m²
Site area = 3,662m².
Allowable site cover =
1,600m² + 498m² = 2,098m²
Landscaping - minimum 10% landscaping Proposal includes a minimum 10% of
area and landscaping
6m width from all other boundaries. 2.65 metre wide landscaping along X
Hilton Terrace, 1.5 metres to Earl Street
and 4-5 – 8 metres to Ernest Street
Roof form - 5 degree minimum pitch to 5 degree pitch to main roof
main roof
Eaves provided for 75% perimeter of Eaves provided to 60% of the building X
building
Boundary setbacks
• Frontage - 6.0m Hilton Terrace > 6 metres
• Other – 3.0m Ernest Street > 6 metres
Earl Street = 1.5 metres X
Rear = 3.4 metres
Building Height
• in storeys - 2 storeys max 1 storey
• in metres - 8 metres max 6.50 metres max to finished ground
levels, < 8 m to natural ground level.
Carparking - 955m2 @ 1 space per 20m² 38 spaces on site and 8 on-road spaces X
(47.75 spaces) on Hilton Terrace = 46 spaces
Bicycle Parking – 1 per 50m²of Gross Floor Proposal requires 12 bicycle spaces, 6 X
Area for commercial & restaurant and 1 per lockers and 1 shower for the use areas.
50m² for shops. 8 bicycle spaces, 12 lockers, a shower
and a change room are provided
The pertinent issues arising out of the above table and the assessment against the codes are
discussed below:
Built form - Eaves
The building design incorporates wide awnings along the front of the building and includes large
outdoor dining areas in front of the tenancies along the northeast and southwest portion of the
building facing the street. These features compliment the character of the surrounding area and
provide for casual outdoor dining and meeting opportunities. The reduced extent of eaves is
associated with the southern elevation and is due to the sewer located along this boundary and is
acceptable.
Page 19 of 64
Section 20
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Setbacks
Specific Outcome 5 of the Tewantin and Doonan Locality Code states:
Buildings and other structures are appropriately designed and sited to—
a) provide amenity for users of the premises as well as preserve the visual and acoustic privacy
of adjoining and nearby land uses;
b) preserve any existing vegetation that will buffer the proposed building from adjoining uses;
c) allow for landscaping to be provided between buildings; and
d) maintain the visual continuity and pattern of buildings and landscape elements within the
street; and
e) help protect the natural character and visual amenity of the Noosa River system and other
watercourses and lakes
The proposed development complies with the setback requirements to all boundaries except for
the Earl Street frontage, proposing a 1.5 metre setback where a 3.0 metre setback is required.
Whilst a 1.5 metre variation is proposed the built form is substantially setback from the Earl
Street – Hilton Terrace corner of the property which therefore limits the impact of the setback on
the public domain. The works related to the setback extend approximately 50% of the boundary
length. The western wall of the development adjacent to the Earl Street frontage maintains visual
interest associated with the mixed materials, including glazing, and the outdoor dining area which
has a lightweight appearance due to it having a considerable opening between the rock wall and
the roof above.
A landscaping strip is to be provided between the building and the property boundary and planted
out with native shrubs.
It is considered that the reduced setback will not detract from the amenity of the area and that the
development demonstrates compliance with Specific Outcome regarding setbacks.
Car parking
The proposed car parking arrangement results in a shortfall of 1.75 car spaces, which equates to
35m² based on the planning schemes car parking rate of 1 space per 20m2 of use area. The car
parking assessment is based on the floor areas of the proposed new tenancies as shown on the
proposal plans. When calculating the car parking requirement for Entertainment & Dining
Business Type 1 - Food & Beverages kitchen and food storage areas are excluded from the
calculation by the planning scheme. The submitted plans do not detail kitchen and food storage
areas within the restaurant tenancies, however, it is reasonable to assume that when developed
the kitchen and food storage areas of the two restaurant tenancies will accommodate for most if
not all of the 35m² area.
The plans provide for 8 bicycle parking spaces when 12 are required. This can be rectified by a
condition requiring the provision of 12 bicycle parking spaces.
Infrastructure Agreement
Prior to the submission of the application Council’s Infrastructure Planning, Design & Delivery
team were designing a proposal to upgrade the Hilton Terrace-Ernest Street intersection to
improve the road network. The proposed intersection upgrade works require the resumption of
135m2 of the subject site.
To address the proposed land acquisition, the applicant proposed that an Infrastructure
Agreement be entered into to provide clarity and certainty for both parties around the land
acquisition, timing of road infrastructure works and demolishing the building which encroaches
partly into the road reserve. The Infrastructure Agreement would also acknowledge that 8 of the
development’s required car parking spaces, lost due to the land acquisition, would be provided in
the road reserve to the site’s frontage.
Page 20 of 64
Section 21
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Accordingly, an Infrastructure Agreement has been prepared and executed by the landowners. A
copy of this agreement is contained in Attachment 2 to this report.
The agreement details that:
The applicant has requested that in conjunction with Council’s upgrade of the Hilton
Terrace-Ernest Street intersection, Council carry out the upgrading works to the frontage of
Hilton Terrace, Ernest Street and Earl Street.
135m2 of Lot 4 on SP 133160 is required to allow for road widening and the construction of
a roundabout.
The 135m2 of land comes to Council on settlement being 90 days of the commencement of
the Infrastructure Agreement.
The compensation to be paid to the land owner for the acquisition of 135m2 of Lot 4
SP 133160 is $217,800 and is based on land valuations.
The owner will demolish the building which encroaches on the road reserve at their cost.
Council will carry out the external frontage works, including car parking spaces in the Hilton
Terrace frontage, for the development in-lieu of making the full compensation payments.
The estimated cost of the external works is $146,492.10.
Therefore, the total compensation payable to the owner in real terms is $71,307.90.
The intention of all parties is for the roadworks, frontage works and the development works
pursuant to a development approval be carried out together.
It is intended for the roadworks and the frontage works be completed within 18 months of
the final execution of the agreement and before the commencement of the use approved
by a development approval.
The car parking spaces in the Hilton Terrace frontage constructed by Council will be in lieu
of 8 required on-site car parking spaces for the development which were “lost” due to the
acquisition.
Other issues
As noted earlier in the report, the previous use of 17 – 19 Hilton Terrace for a service station has
resulted in investigations into contaminants within the soil in the road reserve. As no investigation
has been undertaken in relation on 17 – 19 Hilton Terrace, it is recommended that a condition be
included requiring investigative works and appropriate disposal of any contaminated soil from
within the subject site.
4. CONSULTATION
4.1. Referral Agencies
No referrals were required for this application.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
Infrastructure Services
Development Engineering
Environment Officers – landscaping and stormwater
Page 21 of 64
Section 22
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
5. CONCLUSION & REASONS FOR DECISION
The proposed uses are consistent within the zone and generally comply with the relevant
provisions within the Noosa Plan. Council’s proposed upgrade of the Hilton Terrace-Ernest Street
intersection, the encroachment of an existing building within the road reserve and frontage works
required as part of the development are proposed to be managed by an Infrastructure
Agreement. The proposed development will present positively at a significant entrance point to
Tewantin.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws X Property
X Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 22 of 64
Section 23
Page 23 of 64
ZONE: NEIGHBOURHOOD CENTRE
SHOPS .
no. date amendments OM AREA: 3527 SQM (3662 SQM original)
1 1 J HILTON et
A |30Jan 17 Changes to carparking & loading bay — PROPOSED USE: RETAIL BUSINESS- TYPE 1- LOCAL Za =
re ENTERTAINMENT AND DINING BUSINESS- FOOD & B RAGE ee
4 -
~ B_|4 April 17| Changes to Rooflines & Carpark ———
—~ C 21 Jun 17 Council RFI. Sections. Carpark amendments TOTAL USE AREA: /A_\\ — —
D 4 Jun 17 Site plan/Carpark amendments due
to proposed roadworks SHOPS: £20 SOM (36 cars @ 1 space per 20 SOM) _—
— FOOD ESTABLISHMENTS: 235 inc, outdoor dining (11.75 cars @°T per 20 SOMS a
= — 4 ‘
~ _ CARPARKING REQUIREMENT: 47.75 SPACES _-— ~~
~~ _ _— | : Se ee ee ee SCL) 89 SPACES PROVIDED ON SITE( inci credit on Hilton Tce
_ pylon sign / |
— ~ scale 1:50 “D> LANDSCAPING REQUIREMENT: 366.2 SQM (10% ) J! FY
~ ~ _— D>
_ — — — 615 SQM ACTU, —
_ 7 SS EETHILTON TERRACE)
— _ — : i \
_ ——_
~~ > axlating Rat tre ————_—__ a perdesttiann <\
_ . ~
~~ =~ rf =
- ~ proposed end ‘ cle lane = crossing point \
of Zr oOo OSS [So Up
* Cees [frre CUT GG VSS
% (a)
td q
me = } : + : 5 5 rendered ent) ‘ ¥ NS /
Oy See ves pogte rie caus footpath: Oo Beh eee ye “i pein footpath aor NS /
pufshas i ie Suan 28.795: Ni ads. —~ veal vas. 105°29'96 93 es 36.620 FS %
PLS Pe pnp Lauips Gramps baa | 3 \ Says,
BM S65 ooo od + ™n_
ft aS en fe ey Wat WA TY
ec Bf . 1 a Weep} . I Stes 1S Sal eT Te | — laa 2 Os a \ N -~- SS.
( eer el SL ats ee FPN Te TTT abe «| mepcmemtarm ue TE BGP Tehiee eT \
i Seer OOOO y BZ 5 Hy] » 2% | i i i ‘7* S b
PC EEy eoniun| amt carpe 1 te 28 a AH Met P=lamt ©! | carpe pyion aig iA. \ \ |
wt TA. Wpierretentio y 1S ‘ n =
. ay PRE >| 23 <c) i Ly 7 ok | 10 im! j o detail ai \
7 PSM oo eles | U7 (oy | Lt ce \ \
2 Dish eV |
. apron 17) TT} if , \
wa Ti45 ye a SL1.85 + CEs sp ; ! \ j
a eeicar | PONEYLT grade gs} c] see driveway : | progsing pedestiian
| week eee eo Ta eT 8 [ase : i oe 2A» hou} gm_, isis _,20m, SP"! \ =|
council SU eee lab SES 4 2:000_» 2 $28004 | Cf - s0tnstone stone \ |
eet Fe, Unt Sab es ht
detail BGP sas oe Leh NI a ! \ ,
BON pba d a aca es es 5: 9 i > = \
Fj a er \ A
7 ] pedestri FET rp abode a oN LN | 7 os WY 36 (3 ae \\! ‘ i
lestrian a r— [3 oe : \ | hort t at i A
ing poi ore - ) mt RY 7A | eudeor Re \
4] crossing point i 2& Pee 4 ly ay i) A et : IZ h | pURGoor Re, |
i Gy ates os ey ol iS - ey oe SKA a tinge ies , i
& tout (ail S cone Le Vy tm 4 one 8 iw (— Hd Sapte) El | \ \ om
i Heat — Kp b AL ib q NRA Li 1 B5Sgm o COREE \
e | ng Leap 2st ii A207 = ciate P| Hoe ese tee , \e \A Ww <
wy ISQRHR Sa es ES pe pee Lg H wath Were atea aa 4B) -qxe
| * EO Ses 3 EY : : SaaS Ta air we = gMdon eafpa T_T. Yo iB e
Wy he lg LAA aA of © 100g 4800-1009 Footpath. 2 Ba RB RAE 1109 ea A) tobe: ram: Som t Ae EY
wr VEEL LEE OOOO SOL te ' . : CS ee hoe .
4 MALE Oe. ok Pneer on seeks (a 100 5.400 10, tpe vs . 4 ws Yay) 4 *
7 Z A GEE LEE MEE ELLE ERIE . DEAR ears bes A AAS ‘ et MOAB AGA MOLLE ELL . Lg a \
Kb ef Boes 55) 4) CA ee ide 4 Lt a MOOG NOE SEEEELEEE YB a. -
GPEE 7: GELLETUGLT OME TAT GEL TOMGEI TALL ELLE NGEE TAGE EL TT de ‘ wt ao _ Ch a, COPE at: 00 WARS a
bo RY EE LENE OEE LEE LEE REEL CGE TINO KERR. Pestaurant i — a 3 \ “
” I Y LN ge ANE EE EEE EEE EEE PRESSE ODES IEEE EERE EEE EE BEE ES RO \\-
BI ROIAAGMEL A. SOON EE EIEIO IE/ REE EEE SEE LEEE Reba \
—_ ELON MUM ONO OOOON EEE CLEELEEENELEELEE EIEELE RUMEEEERCESITETEELEROEYLEEERERUL ELL ERE SELELLLLELTEEEE LEE EE) ODA NE
: I GOUT TEE EEE ERLE SOLE MELE Ge LZ NEM GE CLEGG E OEE GENO EEE NOTE SURE REE UGE NOME IG ERO GOCE NOG a pp gag TELE .
ao GW IN Mis, ME i NIM EL EEE MME EINE ENG LENE EL ER SE ORE ING SEL, ;
I ig GOL: CIS DEN A eM NO ACR OY AACE
| CM LEME. LE MAE A ANCE MRE ONC EEE ELIE TE EEE LE BEDE DDE EEE = i
uy lg LEE NMG: shop 2 shop 3) shop 4 SOD OWN NNN Bist te CO go eager ey \
bo RULE et MLE MI is Nii EN OSE HOOTNK ODEN MOB EL, FOI Beh Real
| 4 i Ne Pee YZ ge! 7 BEE 266 the BA te shop 6: SHOP. SHOR B: shop. MON MLL ee | et fs ee Steph | a
1G MUM SE MO A MOLLE NCEE SEE EEE ti EXE EE XE EEE SIM NGM EETIEE, Ay -g ee Santry B
LON Yi Ma aM IEEE ENE SEILER CEN E SPOONS OBE LSE EBA ee: le a entry z
fos Leggs gyi emanate NURS MOL MCL EEE ELE MU) CN INO NSS NEN OP NON NMG ELE ULEEE {birt stofe.---" S a z 5
NEEL OEE ENCE, REE ENE OEE REBEL ELE. itsipie "3 fess mominak sob P grea |
| RYZE Be VAY YOO ODN Ons Wa WOO ar era
| RM EE NOES Pa Ne o6 0 MO NC MCM ENE REECE EEKEEBEEE EE PP Bis So] posible slectieaty = fF NG | |
: ULE a | NE CE EEE LEE IMCL EERE EEE EERE EE > sieos ciety eo
{ ROVE AM PG CALM NCEE EM RR a a LL a aN aa CY VLG AN AD 4 Si substation it ved
NN ig Aa NE ANA OI LG EON EERE TONNE AEE BRAKE iv oe “8 of aa ooh
foo be se |-4 ZZ ea ee Ret [tm 27277 2 a a MN EN AC MM EE L-= aT “ > ee pe oR | LS
1 bao) gg ole eR sewer zone of Fifiisace 3 Bonen odd en Bae Baa § loadi Grossing pod Ah g ie
wef TE fe foe? TTT. toilets. oe Sonic path. Bro. Sewer zone of Inflsspoe:- po PIR CARCASS bin bai a7) | pot So sedosndn 4 \ | BH
paca | B27 fone ne ep ih \ "
pate i Oi os er oy i
U f <u Paling screen fence on He \ 37826 Nese dA ‘A 14. B3 78 r/ _ Palita fonco on retaining wall “335 939136)" 40.56 [3 i or
* = 4 3 ‘ ah oa 4 ! )
o rp }-—____8800_}, _s647__, LOTS2&3 || a
$ | 2
a “4811 ON RP152351) 3 a
oO oe LOT 4 ON SP193160. —
re) TEN PARISH OF TEWANTIN
o 0+ 2000 ~SQ00. 10000 20000 3662SQM (original) | | L
~ is
g le 7 set a oe Location Drawing Scale Drawn | \ <
> scale 1:200°~—», a — is L
o site plan ~ TEWANTIN RETAIL PTY LTD er pa 1:200 @ A2 BS
B & ~ OS : , 11-19 HILTON TERRACE | A\> |
floorplan SD ceca eee i: vewantn ne ne Peed )
LS ay noosaville (07) 5449 9066 PROPOSED COMMERCIAL DA-07.1216.2D DEC dois
© { LN info@: n.com.au QBS reg. 65073 DEVELOPMENT , . ,
. Ne ‘ v t 2Section 24
Page 24 of 64
[ne ate [amencinecie; = .
a0an 17 Changes 1 carparking & loading bay <—__— =
ine ———— Te rd
14 Jun 17 Site arpark amendments due
to roadworks i \
| | |
{ }
} | \
ron a ee
|
| | (( y
YC
° . |
/| s Ss | 28.795 * _405:2900" 14.937 | 5 36.62 aN foe |
py I | | \\\ ke | eS
| i \ | \gh
| : : | =
bi | ye c\| | #
Lu | : — | re
Es |» . cna] | | p /
Ble, a fit — \E al)
< | 2 mi LC i i | ! : | i i‘ / z\| /
; aes 7 a el
5) 7 oe SS | \ BI
| | Ly eT box pater in Reel ee bak gute ll [ [| il | {4 Heed i
PS a \ |
| Hl i =e) : MK
See Vet Wt
ih HI | | ee | AI | /
A AMA << ONS
i |] rn Wailing il | | ee \ /
| ANAS A a \
| | | ae - \/
" he " awe Zone OF ifluprics na ae a arn annnnn ny! oe “ " } |
v 2 ~ — 37.926 14.837 285°32'30" 40.56 Lors2 a3 .
. LOT 4 ON SP143160.
No PARISH OF TEWANTIN
B 0 2000 5000 10000 20000 3662SQM_ |
3 ener ai design ear Lm ls [og
PL
oO - Client Location Drawing Scale Drawn
=> scale 1:200 ROOF PLAN :
oor pan ——_ ie [a0 eeSection 25
Page 25 of 64
no. date amendments
A |80Jan 17| Changes to carparking & loading bay
B_ |4 April 17| Changes to Rooflines & Carpark
© |21 Jun 17| Council RFI. Sections. Carpark amendments:
D_ | 14 Jun 17| Site plan/Carpark amendments due
to proposed roadworks
DecaWond Shadowiine clang sonra mere out canner ae ae — --y
powedarcoat finish 3 Ff
earnest {2 = Se hae J TTT] __ fb _ Sea eee —
street c<2cags 224 TTA reread || ermal IT ee een TTT) |)
noo Coop.) pmmmmpcuml Et el f~ Se MeR ELL ee LC ELL aoe] CT IU, oat, es
Fe OE TS einige — aim tained py — -- nama OO Fee
feature stone over Yone-plinth feature signe over
Eco-stone or similar gal rhs beam Eoo-stone or similar
north elevation
to hilton terrace
stltbond nindek rocteg
oo mn : wun MH = ee
SPs uM Se i ooo ct AAA } tone ‘hg
FL2.50 bere KE Sees eo Ko dee KEK SRK eS a KP Khe 2K gee fey 2 na C5 50
A Be OE EEE er
‘natural ground line <———— aiiminium tramed joinery Tendered & painted blockwork
south elevation
boundary fence omitted for clarity
horizontal fibrecement
DecoWood Shadowline cladding awning DeooWood Shadowliine cladding
am ‘ = —_— seca
1 eT Ce a AA
= Tol] | Lelie & rT ee se
FL2.50 x ies Be cok | 4 be Math gaat Bp ee ee JM TTR TT | Tas Fl2.50
x_n A CS, © | ne oss ST ae a Se Se ae ie
wnat $ Toca silicon jointed aluminium framed joinery
commas cies rendered conc block bass
east elevation west elevation
to earnest street to earl street
U
®
a
oO
NO 0 2000 5000 10000 20000
o L_] Ld = Client Location Drawing Scale
° scale a design TEWANTIN RETAIL PTY LTD ELEVATIONS | 1:200 @ a2
© GErad uckelint deele aon 11-19 HILTON TERRACE
ro) Drawing no. Page DateSection 26
Page 26 of 64
y t
ae
ae Ne ;
gs q + BN ce «4
BS: rey iat || ees
ae ay 3 eh
= | pn Be. gx wes
Es Sco |e HN Pal a Ch CR
= ee Cm a ee
* 4 eS : ,
Pe Ce UR ee)
/ : ae Vee SD
Bi AI m8 te ial = =
om Se adh a rete tea ee oo a
Ee es =~ a
JS] o
MSO
ii
2 andrew mckellar design
r)
N
o
g.
pySection 27
ATTACHMENT 2
Page 27 of 64
ATTACHMENT 2
NOOSA COUNCIL
TEWANTIN RETAIL PTY LTD
INFRASTRUCTURE DEED IN RESPECT OF THE ROAD WIDENING AND
CONSTRUCTION WORKS AT HILTON TERRACE AND ERNEST STREET TEWANTIN
ASSOCIATED WITH A DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE
Page 1 of 21
Page 27 of 64Section 28
Page 28 of 64
CONTENTS
RECITALS-----------~---------------n-20nnnn annem nena ennnnnnnnnnnnnnnnnnnnnnnnnnnnnnnmnnacnmmanananaaannnmacnasnamnmnnncnnnn A
IT IS AGREED--------------------~-----------------------------00-0nnnnn nnn n nn nn nnn nnn nn nnn nnnn nnn nnnnnnnennnnnnnnncennannnnennne 5
1 ETE RPE RTO bn cessor erence nemmemnnenmmmmanemns
Lit Nature of Deed ----------------------------------------~----~------------n---n- nnn neon nnn nena nnn nn nnn nnn nnnnn 5
1.3 Interpretation----------------------------~-----------------------0--0n nena nnn nn nnn nnn nnn nnn nnn nn nnn nnn nnn 5
1.4 Definitions ------------------------------------------------------- 22-0 nnn nnn nnnnnnn annem nnn nnn nnn G
1.5 Other Expressions -------------------------------------------------- 22-22 ----- 22 nnn nnn nn nnn nnn mene nnn nnn naan
2.1 = Application of Act -----------------------------------------------~------------+------- 222-20 nnn nnn nnnnnnnn nnn
2.2 Deed to bind successors in title--------------------------------------------------------------------------=--8
2.3 Conditional upon approval of Development Application ----------------------------------------------8
2.4 Infrastructure Deed Terminates --------------------------------------------------------+-------------------8
2.5 Infrastructure Agreement overrides Development Permit. ------------------------------------------8
4 PAYMENT: OF COMPENSATION. ..cscsssscetsscsssosssscsssvicssvesssvscctsssscsssescssssessasssssasissessvsssesnssssavesene
4.1 Satisfaction of Valuation Amount -------------------------------------------------------- 222-20 ----------=-8
4.2 Plan of Survey -----------------------------------------------------n0nnnn nn nn nena nnn nn nnn n nnn enn ne nnn n nnn
4.3 Settlement----------------------------------------------- 22-02 2---------- nnn nnn nnn nen nnn nnn nnn Q
4.4 — Timing of Roadworks ---------------------------------------------------- 2-22 -nn nnn nn anna ence nnn nn enna nnn
4.5 Completion of Roadworks --------------------------------------------------------- 2 nnn nnn nnnnnnn naan naan 9
5.1 Demolition of Building ---------------------------------------------------------------+---------------------=--9
6 DEVELOPMENT APPLICATION. ........ssssscssssovessrosscessscesessnsssecsscsescscecsscessssceesesssecsssessessessnsessesD
6.1 Parking Provision ------------------------------------------------------------- 22-2 nnn nn nn nnn nnn nnn nnn
6.2 Notice of Commencement of Use ------------------------------------------------------------------------ 10
7. CONTINGENCY COSTS .......csccssssscssescrssssssccsscsccssessssssessseesessescesssersesssesssessssasssssesssseesersesees LO
8 RELOCATION OF SERVICES vccsssscscssssvsccsscessecesocscnessscousyesosasenssssessessssessessevsenissssassarssesaseeeeres LO
8.1 Acknowledgement ------------------------------------- 2-9 --- nnn nnn nn nnn ener nnn nn nnn nen nn enna a----- 10
8.2 Payment for Telstra Works -----------------------------~---------------------200-2ne2-nn----------2------- 10
8.3 Other Services ------------------------------------------------------------- 22-2 nnn nnnnnnn nnn enn nnnnennnenen-= 10
9.1 Provision of Bank Guarantees ----------------------------------------------------------------------------- 10
10 RELEASE. AND INDEMNITY scsessssssssessosssassensocsndsssanssnssevesassescsacsicccccssesssaconesssssvasssevesessvesseneee kl
11 GOODS AND SERVICES TAX .....cscesssesssssesscecseccensecsssnessecsscssssccescacesssossnesssssessasessssessssesessesere LL
11.1 Interpretation------------------------------------------------------------------------------------------------- 11
11.2 Consideration GST inclusive ------------------------------------------------------------------------------- 11
12 NOVATION OF DEED UPON SALE ..........sssssesscessscrsssseessoessrssseasscsessccsvessccseseccescnsassecasseeseesseese LL
Page 2 of 21
Page 28 of 64Section 29
Page 29 of 64
12.1 Sale of the Subject Site ------------------------------------------------------------ 2-0 -0----nnnnnnennneee== 11
12.2. Applicant to remain liable ----------------------------------------------~--------------0---0--------n----=- 1]
12.3. Release from Liability --------------------------------------------------------------------------------------- 11
14.1 Payment of costs -----------------~-------------------- 2-22-99 2a naan nnn nnn nnn ten enn nnn nnn nennnne= 12
14.2 — TiM@-----------~-------------- nnn n nnn nnn nnn nnn nnn nnn nnn nnn nena enn nn enn nn nnn nnnnnnnennennenne 12
14.3. Waiver-------------------------------------------------- 222-22 2n0 ne nnn nn nnn nnn nnn nnn nn nnn nnn nn nn enenennenene= 12
14.4 Laches and delay ---------------------------------~-------------------------- 2-02 ---2-n nnn nnn nn enna nnn nne nee 12
14.5 Se VeranCe---~--~--------~------------ennn nnn nnn nnn nnn nnn nnn nnn nnn nee nanan nnnnnnennnnnnnnnnnnnane 13
14.6 Warranty of authority--------------------------------------------------------------------------------------- 13
14.7. Further assurances ----------------------------~------------- 2-207-002-2202 nn nnn nn nnnnn nner nnnn nn nnnnenneen= 13
14.8 Force Majeure ------------------~---------------------9- 2200-02-00 22a 2 nnn nnn nnn nn enna nnn nnnnennnnnnnne= 13
14.9 Amendment of deed ------------------------------------ 2-2 --2n nn nanan nnn nn nme nnn n nn nnn enn nn nnn en nnenenen= 13
SCHEDULE 1 - Deed Details --------------------------------------------------------2--000nnnnenennnnnnnnnnnnnnnnnnnnnnnnnnnns 14
SCHEDULE 2A - Plan Showing Acquired Land.........s..ssscsscsssscesecseesscssssscccscsssenssccssessescsssseesssessssesessee LD
SCHEDULE 2B - Plan of Council Roadworks and Frontage WOrkKS......ccccccscssssssesssssscesssseecsessesessesesssees LO
SCHEDULE 3 - Frontage Works Costings .........ssssscocsssssssosscrccesssecesssscccccccessesscsscesersesssessssscssssseessceseses LZ
EXECUTED AS A DEED --------~---------~---~-----------a0-- nnn nnnnnnn nnn nnnn anna nnn enn nnn nnnnnn anna nnnnnannnnnnnnnnnnnnnn 2)
Page 3 of 21
Page 29 of 64Section 30
Page 30 of 64
THIS DEED is made on the date stated in item 1.
BETWEEN The Council
AND the Applicant
AND Mortgagee 1
AND Mortgagee 2
RECITALS
A The Applicant is the owner of the Subject Site.
B Mortgagee 1 is the mortgagee under Mortgage Number 717895184 as tenant in common for
a 9221/10000 share and the mortgagee under Mortgage Number 717895206 registered
against the Subject Site.
C Mortgagee 2 is the mortgagee under Mortgage Number 717895184 as tenant in comment for
a 779/10000 share.
D The Applicant has lodged the Development Application.
E The Council intends to carry out certain roadworks at Hilton Terrace and Ernest Street in
Tewantin (“the Council Roadworks”) which will include road widening of approximately
135mz2 over the Subject Site as shown on the drawing in Schedule 2A hereto ("the Acquired
Land").
G The Applicant has agreed to dedicate the Acquired Land as road.
H The Applicant has requested that in conjunction with the Council Roadworks, the Council carry
out upgrading works to the frontage of Hilton Terrace, Ernest Street and Earl Street (“the
Frontage Works”).
| The Council Roadworks and the Frontage Works are shown on the drawing in Schedule 2B
hereto
J The Frontage works, the cost of which is estimated at $146,492.10 are more particularly
described in Schedule 3 hereto.
H The Applicant and the Council agree that the value of the Acquired Land is $217,800 (“the
Valuation Amount”).
I The Applicant and Mortgagee 1 and Mortgagee 2 are "affected persons" under Part 3 of the
Acquisition of Land Act 1967 as amended.
4 of 21
Page 30 of 64Section 31
Page 31 of 64
IT IS AGREED
a INTERPRETATION
1.1 Nature of Deed
This Deed may be referred to in accordance with Item 2.
1.2 Commencement
This Deed commences on the Commencement Date.
13 Interpretation
(a) In this Deed, unless a contrary intention appears, reference to:
(i) a clause is to a clause in this Deed; and
(ii) the singular includes the plural and vice versa; and
(iii) any gender includes all other genders; and
(iv) a person includes a firm, a corporation, an association and a body, whether
incorporated or not and a government or statutory body or authority; and
(v) legislation (including subordinate legislation) includes:
(A) statutory instruments under the legislation; and
(B) consolidations, amendments, re-enactments or replacements of the
legislation; and
(vi) writing includes any mode of representing or reproducing words in tangible
and permanently visible form and includes facsimile transmission; and
(vii) this or any other Deed includes the Deed as varied or replaced and is not
affected by any change in the identity of the parties; and
(viii) | aday is to a Calendar Day.
(b) The clause headings appearing in this Deed are inserted for convenience of reference
and do not affect the construction of the Deed.
(c) If any words are italicised or otherwise printed differently, this has been done for
convenience only and does not affect the construction of this Deed.
(d) Whenever more persons than one constitute a party all the covenants, deeds,
conditions, restrictions and provisos on the part of that party contained or implied in
this Deed bind those persons jointly and each of them severally.
(e) This Deed is in all respects to be interpreted in accordance with the laws of the State
of Queensland, and the parties irrevocably and unconditionally submit to the non-
exclusive jurisdiction of the courts of that state and any courts which have jurisdiction
5 of 21
Page 31 of 64Section 32
Page 32 of 64
to hear appeals from them, and waive any right to object to proceedings being
brought in those courts.
(f) Nothing contained in this Deed affects, prejudices or derogates from the
requirements of any statute or from the rights, powers and authorities of the Council
under the provision of any statute or under any declared policy of the Council.
(g) An inclusive definition, or an example or particularization of a provision, does not limit
but may extend that definition or provision.
(h) Where a word or expression is defined, other parts of speech and grammatical forms
of that word or expression have a corresponding definition.
(i) All schedules to this Deed form part of this Deed and a reference to an item is a
reference to an item in Schedule 1.
(j) Terms used in the Special Conditions which are not otherwise defined in Clause 1.4
(Definitions) shall have the meanings assigned to them in the Council’s Planning
Scheme.
1.4 Definitions
In this Deed:
“Act” means the Planning Act 2016.
“Appeal” refers to an appeal made under chapter 7 of the Repealed Act.
“Applicant” means the person described in and having its principal place of business at the
place described in item 4 and includes:
(a) successors and permitted assigns in the case of a corporation, association or other
body whether incorporated or not; and
(b) executors, administrators and permitted assigns in the case of a natural person.
“Calendar Day” means the period from one midnight to the following one.
“Chief Executive Officer’ means the Chief Executive Officer of the Council and includes the
person (if any) for the time being acting as Chief Executive Officer.
“Commencement Date” means the date when this Deed commences being the date when
the last party executes this Deed.
“Council” means the Local Government described in Item 3 and its predecessors, successors,
transferees and assigns.
“Development” has the meaning given in the Act or the Repealed Act as may apply.
“Development Application” has the meaning given in the Repealed Act and refers to the
Development Application identified in item 7.
“Development Permit” has the meaning given in the Repealed Act as it applies to the
Development Application and is identified in item 8.
6 of 21
Page 32 of 64Section 33
Page 33 of 64
“Force Majeure” means an event:
(a) being a decree of the Commonwealth Government or the state Government, an act
of God, industrial disturbance, act of public enemy, war, international blockade, public
riot, lightning, flood, earthquake, fire, storm or other event whether of a kind herein
specified or otherwise; and
(b) which is not within the control of the party claiming Force Majeure; and
(c) which could not have been prevented by the exercise by that person of a standard of
foresight, care and diligence consistent with that of a prudent and competent person
under the circumstances.
“Local Government” has the meaning given in the Local Government Act 2009.
“Local Government Area” has the meaning given in the Local Government Act 2009.
“Lot” has the meaning given in the Act.
"Mortgagee 1" means the person described in and having its principal place of business at the
place described in Item 5.1 of Schedule 1 and includes its successors and permitted assigns.
"Mortgagee 2" means the person described in and having its principal place of business at the
place described in Item 5.2 of Schedule 1 and includes its successors and permitted assigns.
“Notice” means any certificate, demand or notice to be made, given or served by a party under
this Deed.
“Owner” has the meaning given in the Act.
“Planning Scheme” means the planning scheme (The 2006 Noosa Plan as amended) of the
Council applicable for the subject site.
“Public Office” has the meaning given in the Local Government Act 2009.
“Purchaser” means the purchaser of the Subject Site from the Owner.
"Repealed Act" means the repealed Sustainable Planning Act 2009.
“road” is as defined under Section 59(2) of the Local Government Act 2009 as amended.
“Sell” includes transfer, dispose of and alienate and “Sale” has the corresponding meaning.
“Settlement Date” means the date identified in Item 9
“Subject Site” means the land described in Item 6 and includes:
(a) any interest or estate in, on, over or under the land; and
(b) the airspace above the surface of the land and any estate or interest in the land; and
(c) the subsoil of the land and any estate or interest in the subsoil; and
(d) any part or parts of the land; and
7 of 21
Page 33 of 64Section 34
Page 34 of 64
(e) any estate or interest created in respect of any of the above matters
“Use” has the meaning given in the Act.
1.5 Other Expressions
If a term is not defined in this Deed it shall unless the context otherwise requires, have the
meaning given to it by:
(a) the Act; or
(b) the Macquarie Dictionary in the absence of a definition in the Act.
2 INFRASTRUCTURE DEED
2.1 Application of Act
This Deed is intended to constitute an infrastructure agreement under the Act.
2.2 Deed to bind successors in title
The Applicant as Owner consents to the obligations of the Applicant under this Deed being
attached to the Subject Site and binding on the Applicant and the Applicant’s successors in
title in accordance with Section 155 of the Act.
2.3 Conditional upon approval of Development Application
This Deed is conditional upon the Development Permit taking effect in accordance with
Section 339 of the Repealed Act.
2.4 Infrastructure Deed Terminates
If the Development Permit does not take effect in accordance with Section 339 of the
Repealed Act, within 60 calendar days of the Commencement Date or if the decision notice
approving the Development Application is appealed, this Deed will automatically cease and
determine.
25 Infrastructure Agreement overrides Development Permit.
This Deed prevails to the extent of any inconsistency with the Development Permit.
4 PAYMENT OF COMPENSATION
4.1 Satisfaction of Valuation Amount
The Applicant and the Council agree that subject to any subsequent adjustments pursuant to
clauses 7 and 8, payment of the valuation amount by the Council is to be satisfied as follows:
(a) Construction by the Council of the Frontage Works.
(b) Payment to the Applicant of the sum of $71,307.90 (the balance compensation
amount).
8 of 21
Page 34 of 64Section 35
Page 35 of 64
4.2 Plan of Survey
The Council shall forthwith prepare a Plan of Survey of the Acquired Land and forward such
plan to the Applicant within 30 calendars days of the Commencement Date.
4.3 Settlement
Settlement shall take place on the Settlement Date. The balance compensation amount shall
be paid by the Council to the Applicant on the Settlement Date in exchange for:
(a) Vacant possession of the Acquired Land.
(b) The duly executed Plan of Survey capable of immediate registration in the appropriate
office free from encumbrances, together with any necessary document (including
Release of Mortgages 717895184 and 717895206) to allow registration of the
Acquired Land as road.
(c) Production of any instrument of title required for registration of the Acquired Land.
(d) The bank guarantees required pursuant to Clause 9.
4.4 Timing of Roadworks
The Applicant and the Council acknowledge that it is the intention of the parties that the
Council Roadworks will be carried out contemporaneously with the Frontage Works and the
Applicant's development works pursuant to the Development Permit.
4.5 Completion of Roadworks
The parties acknowledge that it is intended that Council will complete all road works (including
the Frontage Works) within 18 months of the Commencement Date and before
commencement of the use approved by the Development Permit. However, the Applicant
acknowledges and agrees that it shall have no right of action against the Council for damage
or loss occasioned to it as a result of delay by the Council in completing the road works.
5 APPLICANT'S WORKS
Del. Demolition of Building
The Applicant shall demolish the structures currently located on the Acquired Land with all
building materials, including all concrete slabs and foundations associated with the structures
removed and the area suitably graded to a free drainage state prior to settlement.
6 DEVELOPMENT APPLICATION
6.1 Parking Provision
The Council Roadworks include the provision of on-street parking bays at the Hilton Terrace
frontage to the Subject Site which the Council agrees replace 8 car parking spaces which would
otherwise be required as a condition of approval of the Development Application.
9 of 21
Page 35 of 64Section 36
Page 36 of 64
6.2 Notice of Commencement of Use
The Applicant shall provide the Council with 90 calendars days notice prior to commencing the
use approved by the Development Permit to ensure that the Council is able to take
appropriate measures with respect to traffic control as may be required.
% CONTINGENCY COSTS
The Applicant and the Council agree that in the event that the cost of the Frontage Works
exceeds the sum of $146,492.10, the Applicant shall be responsible for such excess up to an
amount of $17,106.79.
8 RELOCATION OF SERVICES
8.1 Acknowledgement
The parties acknowledge that the Frontage Works do not include an amount for the cost of
relocation of or modification to existing Telstra services as shown on the drawing in Schedule
2B hereto.
8.2 Payment for Telstra Works
It is agreed that such works are in addition to the Frontage Works in Schedule 3 and shall be
undertaken by the Council but shall be paid for by the Applicant.
8.3. Other Services
The Council shall meet the cost of relocation of other services as part of the Council
Roadworks.
9. BONDS
9.1 Provision of Bank Guarantees
The Applicant shall provide the following Bank Guarantees to the Council on settlement:
(a) A Bank Guarantee for the amount of $17,106.79 in respect of the Frontage Works to
secure to the Council the obligation of the Applicant under clause 7.
(b) A Bank Guarantee for the amount of $50,000 in respect of the Telstra Works to secure
to the Council the obligation of the Applicant under clause 8.2.
Such Bank Guarantees to provide for payment by the bank of the amount or any part
or parts of the amount to the Council upon the bank receiving an unconditional
written demand from the Council accompanied by the Bank Guarantee, without
reference to the Applicant and despite any notice given to the bank by the Applicant
not to pay the Council any amount payable under the Guarantee and without any
obligation on the bank to enquire as to the performance or non-performance of the
provisions of this Deed by the Applicant or the correctness or validity of any demand
made by the Council pursuant to the Bank Guarantee.
10 of 21
Page 36 of 64Section 37
Page 37 of 64
10 RELEASE AND INDEMNITY
The Applicant and Mortgagee 1 and Mortgagee 2 agree that the consideration provided by
the Council pursuant to this Deed is in full satisfaction of any entitlement to compensation to
them or any of them under the Acquisition of Land Act 1967 or Local Government Act 2009
with respect to the taking by the Council of the Acquired Land and wholly release and
indemnify the Council in respect of any such claim to compensation and furthermore agree
that this Deed may be pleaded as an absolute bar to any such claim.
11 GOODS AND SERVICES TAX
11.1 Interpretation
In this clause:
(a) "GST" means the goods and services tax under the GST Act.
(b) "GST Act" means A New Tax System (Goods and Services Tax) Act and includes other
GST related legislation.
11.2 Consideration GST inclusive
All amounts or other sums payable or consideration to be provided under this Deed are
inclusive of GST and the recipient of the supply is not required to pay any additional amount
to the supplier.
12 NOVATION OF DEED UPON SALE
12.1 Sale of the Subject Site
The Applicant must not sell or transfer the Subject Site prior to the performance and fulfilment
of its obligations under this Deed or any of them except subject to the condition that the
purchaser (in this clause called “the Purchaser”) shall enter into a deed of novation of this
Deed or a replacement deed with the Council, whereby the Purchaser becomes contractually
bound to the Council to perform and comply with the conditions of this Deed, or such of them
as remain unperformed or unfulfilled by the Applicant at the time of such sale.
12.2 Applicant to remain liable
In the event that the Applicant sells or transfers the Subject Site otherwise than in compliance
with Clause 12.1 the Applicant must perform and fulfil the conditions of this Deed at such time
or times as the Council stipulates, even if the time or times otherwise appointed for such
performance and fulfilment have not then arrived.
12.3 Release from Liability
In the event that the Purchaser enters into a deed of novation or such further deed or
agreement which contractually obliges the Purchaser to the Council to perform the conditions
of this Agreement, the Applicant shall be forever released from any further liability pursuant
to this Agreement or any further liability pursuant to this Deed or otherwise arising from its
11 of 21
Page 37 of 64Section 38
Page 38 of 64
subject matter and the provisions of this clause may be pleaded as a bar to any proceedings
brought by the Council.
13 SERVICE
All notices given under this Agreement:
(a) may be signed by an authorised officer of the party giving the notice;
(b) must be in writing;
(c) may be given by being delivered, sent by facsimile transmission, sent by email, or sent
by prepaid post to the address for service of the party to whom the notice is
addressed;
(d) if sent by mail, are deemed to be given on the third day after mailing, and if sent by
facsimile or email, are deemed to be given on the day after they are dispatched;
(e) The address for service of each party is specified in Schedule 1.
14 MISCELLANEOUS
14.1 Payment of costs
Each party shall pay its own costs of and incidental to the preparation and execution of this
Deed but the Council shall pay the cost of :
(a) Preparation of the Plan of Survey referred to in Clause 4.2.
(b) Any stamp duty payable on this Deed.
(c) Preparation of any documents or declarations necessary to effect registration of the
Plan of Survey in the Department of Natural Resources & Mines and dedication of the
Acquired Land as road.
14.2. Time
Time is, in all cases, of the essence.
14.3. Waiver
No waiver by the Council of any breach by the Owner of any of the provisions of this Deed
shall be implied against the Council or be otherwise effective unless it is in writing under the
hand of the relevant Chief Executive Officer.
14.4 Laches and delay
No laches or delay by the Council at any time or times in enforcing any of its rights, powers
and the like under this Deed prejudice or affect those rights or powers.
12 of 21
Page 38 of 64Section 39
Page 39 of 64
14.5 Severance
If any provision of this Deed cannot be given effect or full force and effect by reason of
statutory invalidity that provision shall be served or read down but so as to maintain and
uphold so far as possible the remaining provisions of this Deed.
14.6 Warranty of authority
Any person signing this Deed:
(a) as attorney of any party warrants to the other parties that at the date of execution
that person has not received any notice or information of the revocation of the power
of attorney appointing that persons; and
(b) as an authorised officer, agent or trustee of any party warrants to the other parties
that at the date of execution that person has full authority to execute this Deed in
that capacity.
14.7. Further assurances
Each party agrees at its cost to do everything reasonably necessary to give effect to this deed.
14.8 Force Majeure
(a) If a party is unable by reason of an event of Force Majeure to carry out its obligations
under this Deed, that party must give a Notice to the other party advising of the event
of the Force Majeure as soon as it is reasonably practicable after the event of a Force
Majeure.
(b) If a party gives a Notice advising of an event of Force Majeure, that party’s obligations
will be suspended during the period for which the event of Force Majeure or its effect
extends.
(c) Where the obligations of the Council are dependent upon the occurrence of specified
circumstances, then the Council will be relieved of its obligations for so long as there
is a change or deviation or non-occurrence of those circumstances arising from a
matter beyond the Council’s Control.
14.9 Amendment of deed
(a) Despite any provision of this Deed, the parties may at any time agree to vary the terms
of this Deed
(b) No modification, variation or amendment of this Deed is of any force or effect unless:
(i) itis in the form of an amendment Deed and has been signed by the parties; and
(ii) | where relevant the amendment Deed complies with the requirements of the
Act.
13 of 21
Page 39 of 64Section 40
Page 40 of 64
SCHEDULE 1 - Deed Details
ITEM 1 Date Commencement Date in accordance with Clause 1.4 - Definitions
ITEM 2 Name of Deed Infrastructure Deed in respect of the road widening and
construction works at Hilton Terrace, Ernest and Earl Streets
Tewantin associated with a Development Permit for Material
Change of Use.
ITEM 3 Council Noosa Shire Council
9 Pelican Street, Tewantin in the State of Queensland
PO Box 141, Tewantin QLD 4565
ITEM 4 Applicant Tewantin Retail Pty Ltd ACN 611 453 331
Suit 301, 685 Burke Road, Camberwell VIC 3124
ITEM5.1 Mortgagee 1 Equity-One Mortgage Fund Limited ACN 106 720 941
Level 13, 256 Queen Street, Melbourne VIC 3000
ITEM5.2 Mortgagee2 Burness Consulting Pty Ltd ACN 080 877 881
Level 1, 110 Church Street, Hawthorn VIC 3122 __
ITEM 6 Subject Site Lot 4 on SP133160
ITEM 7 Development MCU 17/0054
Application Number
ITEM 8 Development Permit Development Permit for Material Change of Use for Retail
Business Type 2- Shop & Salon and Entertainment and Dining
Business Type 1-Food & Beverages.
ITEM 9 Settlement Date 90 calendar days from the Commencement Date.
14 of 21
Page 40 of 64Section 41
Page 41 of 64
' ye SCHEDULE 2A - Plan Showing Acquired Land
\\t \\e ii
YA A VARA | a
A Hes sad
\ \ \ Wy \ ij 14
\ } 1 — at 2%
NAY YAS pag a
\\ \ fared 6
it | ha << y ris : S al
LL Vea f lh
ee | C i?
ETM. \ \ \ f 5
| | i | tt t | | 2.
Hal) ee Ne aE
hl a —— | i
CC eS ih
HW | i oy _ ——— - : Pl
Sa a or ot :
7h, i ee Se : \ + fk
bY Lut Ae ‘ | Ai rf
rh | Ae zi
| z f 6 | 5
Thats i
: f | j 2
NY | | i iS
Fe “| Hi Be ee ia joc
Pa | Wt i \2
PEN |3 ie |S
a 2 | °
AE Hy b
A :
15 of 21
Page 41 of 64Section 42
Page 42 of 64
SCHEDULE 2B - Plan of Council Roadworks and Frontage Works
Hal tea sisi
ey » We & He
ipl | “Tes | de yo
ANS !
Mey Oey ea ee ey .[
‘7 fs ee ee
‘On |
? : ‘ , ha 134415 1S3N83 yi — :
, -
i 4. 5 | a = 8} i : af E 3
td SANS itis g
VO) to IBM EGE ped surhaté
Lp lee IGA bE DEE
if of Bae ; ty a & 4 -_=
i i| | SEES PPP) Pinan
if ‘es RG HaTit! gf
ee agg 2
Ph 9 ; Bsn Tisi ii
th a SOOO .
He i i [SSS ee
rt i 8 TE =
ie \ q 2 ~@
al RES SS
oa mel REVe
=e \ bir: . © ~ a
n | | | ' § “ i,
TAN NG SS i .
i | | 8 s . ,
i] iL 4 Sal | 3
4 a .
hd 7 re
fi im “A s] i Se 5
AL NY CAA Ft a } | 2
} iy Pp | ee
f oo t n 7 a — A } ‘ oO
| He a f wc
FN tng gs SS tt} /P 4 Oo
NY Gey Prone eT |
Lo | ove... lo
Pl ANS | ca Mf =.
16 of 21
Page 42 of 64Section 43
Page 43 of 64
SCHEDULE 3 - Frontage Works Costings
Tem DESCRIPTION a a
Site establishment and disestablishment
including but not limited to, mandatory permits On $5,000.00
and fees.
Provision of traffic management during
joonatruction as approved by the Superiniendant $10,000.00 $10,000.00
including all drawings, signs, barrens, warning
lights, sandbag kerbs etc
Stripping of topsoil and vegetation from all $1.70 $170.00
earthworks areas to stockpile on site for re-use. . ’
Respreading of stockpiled topsoil to all $3.24 $324.00
earthworks areas, ’
pO 88 00
Saw cut edge of Hilton Terrace bitumen and
removal of existing seal, pavement, kerb and an $5,035.80
channel and concrete invert channel including . _——
refuse fees and charges.
To wend
Removal of existing concerete pathway $8,442.50 ,
including refuse fees and charges. ’ .
| a es es ee ee
Trim and compact road pavement subgrade to
300mm behind back of new kerb & chanmel to
new parking bays on Hilton Terrace
Supply, place and compact sub base (bottom
course) gravel - Type 2.3. Provisional
‘Quantity.
= Te Ce
Supply, place and compact base (top course)
gravel - Type 2.1 Provisional Quantity.
[aaa __| 75mm thick (assumed CBR 5) Pome fi Siemon
‘Supply and install to Noosa Council Standard
Barrier Kerb & Channel including all materials. $48.1 $7,707.20
and work,
17 of 21
Page 43 of 64Section 44
Page 44 of 64
‘Supply and install to Noosa Council Standard
5.2 ‘Concrete Invert Channel including all materials m 63 $76.00 $4,080.4
and work.
‘Construction of 100dia. sub surface stormwater
drain under Kerb including supply and laying of
crushed rock surround, sand, perforated pvc O0 0
pipe and cleanout points complete, outlet
stormwater pit.
a BP So po So " _—
|S | Road Pavement Surfacing pe
‘Supply, place and compact 30mm thick
Asphaltic
‘Concrete (AC) surfacing to new carparking bays.
lon Hilton Terrace including preparation and
prime sealing under AC.
eames ~ —A— ei pe psn _—
(Construction of 2.0m wide reinforced concrete
74 Construction of 2.0m wide pedestrian pram $1,178.16 nl
ramps including all materials and work.
oo tating
| TEM DESCRIPTION punt | quantity fare | AMOUNT
‘Construction of Stonmwater Drainage pipe
including supply, excavation, lay, sand bed and
backfill all pipes socketed, rubber ring jointed.
Provisional Quantity.
[ata _[a75 a RC. Pipes Clase 2 Tm | | saa —_—istasinoo
‘Supply and install precast concrete stormwater
quily pits complete including lintels, chambers,
all matenals and work. Provisional Quantity.
2.4m Lintel a $3,000.00] $3,000.00
‘Supply and install new Class "D" stormwater
gully pit grates on existing stormnvwater pits. $2,000.00) $6,000.00
including all modifications, materials and work.
8881.00
| 9.1 Topsoll and Turt a a ee
2310.00
P| |||
Removal and relocation of existing street signs $1,000.00
including new posts and concrete foundations. , .
18 of 21
Page 44 of 64Section 45
Page 45 of 64
Sub Total
Sub Total Plus 10% Contingency
GST
TOTAL COST OF FRONTAGE WORKS.
19 of 21
Page 45 of 64Section 46
Page 46 of 64
EXECUTED AS A DEED
This deed dated this day of 2017.
BETWEEN NOOSA SHIRE COUNCIL a Local Government duly constituted under the provisions of
the Local Government Act 2009
(“Council”)
AND TEWANTIN RETAIL PTY LTD ACN 611 453 331 of Suit 301, 685 Burke Road, Camberwell,
Victoria
(“the Applicant”)
AND EQUITY-ONE MORTGAGE FUND LIMITED ACN 106 720 941 of Level 13, 256 Queen
Street, Melbourne, Victoria
(“the Mortgagee 1”)
AND BURNESS CONSULTING PTY LTD ACN 080 877 881 of Level 1, 110 Church Street,
Hawthorn, Victoria
(“the Mortgagee 2”)
SIGNED on behalf of the NOOSA SHIRE )
COUNCIL by a delegated officer inthe presence )
of: yo
Signature
0
Solicitor/Justice of the Peace
EXECUTED by TEWANTIN RETAIL PTY LTD ACN )
611 453 331 in accordance with s.127 of the ) | = of] ff pe
Corporations Act 2001 ae] Seer 321)
—_ a ee
Dirdctor/Sgcretary
or
EXECUTED by EQUITY-ONE MORTGAGE FUND ) =e
LIMITED ACN 106 720 941 in accordance with ) ee _
s.127 of the Corporations Act 2001 ) Director
)
yo
Director/Secretary
20 of 21
Page 46 of 64Section 47
Page 47 of 64
EXECUTED by BURNESS CONSULTING PTY LTD ) _
ACN 080 877 881 in accordance with s.127 of ) sstasacessapce isbn Nice
the Corporations Act 2001 ) Director
)
a
Director/Secretary
21 of 21
Page 47 of 64Section 48
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
6 ASSET MANAGEMENT AND DESIGN SERVICES TEAM RESOURCING
ARRANGEMENTS
DOCUMENT INFORM AT ION
Author Asset Planning Manager, Bryan O’Connor and
Infrastructure Planning, Design and Delivery Manager, Craig Eldridge
Infrastructure Services Department
Index ECM / Subject / Staff Management / Organisational Structures
ECM / Branch Management / Infrastructure Services
Attachments 1. Asset Management Organisation Structure – current & proposed
2. Infrastructure Planning, Design & Delivery Organisation Structure –
current & proposed
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Asset Planning Manager and Infrastructure Planning, Design
and Delivery Manager to the General Committee Meeting dated 13 November 2017 and approve
changes to Council’s organisational structure as detailed in the report.
REPORT
The purpose of this report is to seek Council’s approval of the following changes to the
organisation structure:
Asset Management Branch
One additional permanent fulltime equivalent (FTE) Technical Officer, Level 5
The conversion of two temporary Technical Officer, Level 5 positions to permanent, and
The redesign of the Technical Support Officer’s position from a Level 2 to a banded Level
3 to 4.
Infrastructure Planning, Design & Delivery Branch
Two additional FTE contract positions for a duration of three years each – one Designer
Capital Works and one Project Officer
One temporary Designer Capital Works and one temporary Project Officer position to be
made permanent
Redesign the Technical Officer Coastal & Foreshores, Level 5 to Project Coordinator
Flooding, Coastal & Foreshores, Level 6
1. Asset Management
With the ongoing development of Council’s 5 year Capital Works Program to a 10 year Capital
Works Program and the continued implementation of the Asset Management Roadmap, along
with the team’s business as usual activities, a need has been identified to increase the current
resources delivering these functions for Council. The current resourcing of the Asset
Management Branch is insufficient to deliver these functions within the timeframes and to a
desired level of service set out in the endorsed Asset Management Roadmap.
Page 48 of 64
Section 49
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Currently, Asset Management is delivered through a combination of in-house technical staff and
supplemented by the use of external consultants/contractors to assist with the delivery of asset
management objectives across the organisation. The current resourcing does not have capacity
or resourcing to undertake the function of asset inventory within the Asset Management Branch.
The asset inventory function is one of the most critical functions within the Branch and cannot be
outsourced as a service as it has a strong interactive role with asset stakeholders across Council.
Good asset data is critical to the decisions we make as an organisation. Not having good data
will result in assumptions and eventually poor decisions will be made. The creation and updating
of asset information within our systems ensures that asset data reflects the assets in the field and
as a result a true and accurate account of our assets is reflected within our asset register. In
addition, the outputs of the asset information forms the foundations of our budget processes for
establishing depreciation levels for our asset classes, updating of asset renewal programs and
updates changes in our asset base.
Over the past 6 months an officer has been taken off-line to undertake the asset inventory
function. It has become evident that whilst the backlog of work has been considerably reduced
there is an ongoing need for resourcing to support capitalisation, contributed assets, discovered
assets and support the cyclic asset revaluation activities delivered by the Asset Management
Branch. The table below details the proposed additions and changes to the positions within the
Asset Management Branch. In addition to this table, the current and proposed organisational
structures for the Asset Management Branch are provided at Attachment 1 to this report.
Position Title Broad Role Current Status Recommended Level
(in respect to project delivery) Status
Technical Officer Undertake functions that include New position Permanent FTE Level
Asset Inventory asset inventory updates, 5
reconciliation of asset data sets,
asset data creation (including
contributed assets) and asset
capitalisation processes within the
Asset Management Branch
Technical Officer Undertake functions including: 2-year Fixed Permanent FTE Level
Asset Planning Stormwater condition assessments & Term position. 5
inspections, facilitate condition (Position currently
assessments, manage customer occupied)
requests, and develop asset specific
renewal programs. Assist in the
development and updating of
detailed asset management plans.
Technical Officer Undertake functions including the 2-year Fixed Permanent FTE Level
Capital Planning development of the 10-year capital Term position. 5
works program, the initial (Position currently
assessment and prioritisation of Vacant)
project initiations, investigations into
proposed projects, alignment of
renewal programs within the capital
works program.
Asset Undertake asset assessments, Technical Permanent FTE Level
Management develop inspection routines, facilitate Support Officer 3-4
Officer traffic count assets, and reconcile Permanent FTE
asset data with field assets. Level 2
Page 49 of 64
Section 50
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
2. Design
The capacity of the Design Services section is not keeping pace and delivering designs for the
Capital Works Program. This is impacting on Council’s ability to deliver the current Capital
Works Program and to provide ‘shovel ready’ designs in a timely manner for future years.
With the ongoing development of Council’s 10 year Capital Works Program and Asset
Management Plans, the demand for additional design resources continues to increase. The
resourcing of the Design Services section is critical to the delivery of identified and emerging
projects in the Capital Works Program.
Currently, Design Services are delivered through a combination of four in-house designers and
two project coordinators, supplemented by the use of external design consultants. Under the
current delivery model, a large volume of design work is outsourced to consultants, however, this
approach to delivery comes at a cost; managing and checking the design to ensure that Noosa’s
quality and design standards are being met.
A report was presented to Council on 8 November 2016 which recommended an increase of two
fulltime equivalent (FTE) staff, in the Infrastructure Planning, Design and Delivery Branch.
Following a review of current workloads 12 months on, and considering the future demands on
the team, it has been identified that additional resources will be required to provide support in
delivering Council’s ongoing Capital Works Program.
The Design Services review considered how resources can be employed to assist with the
delivery of designs for the current program and to meet delivery targets for future years. It
concluded that one Designer Capital Works and one Project Coordinator would be required, as a
minimum, to assist with delivering designs and create greater in-house expertise and flexibility.
These additional technical positions would be allocated to the Infrastructure Planning, Design
and Delivery Branch in order to increase the volume of outsourced design work and to project
manage external design consultants. It is considered that these two fulltime equivalent positions
(2 FTE), should be three year fixed term positions to assist with creating a build-up of ‘shovel
ready’ design projects ahead of the Capital Works Program. The table below details the
proposed additions and changes to the positions within the Infrastructure Planning, Design and
Delivery Branch. In addition to this table the current and proposed organisational structure for the
Infrastructure Planning, Design and Delivery Branch is provided at Attachment 2 to this report.
Position Title Broad Role Current Status Recommended Level
(in respect to project delivery) Status
Designer Capital Provide planning and design New position 3 year contract Level 5
Works services within the Infrastructure position
Planning, Design & Delivery Branch
Project Officer Provide project management New position 3 year contract Level 5
services and guidance across position
Council departments
Designer Capital Provide planning and design 3-year Fixed Permanent FTE Level 5
Works services within the Infrastructure Term position.
Planning, Design and Delivery (Position currently
Branch occupied)
Project Officer Provide project management 3-year Fixed Permanent FTE Level 6
services and guidance across Term position.
Council departments (Position currently
occupied)
Project Coordinator Manage flooding projects, coastal Technical Permanent FTE Level 6
Flooding, Coastal foreshores, rivers, canals and Officer Coastal Level 6
and Foreshore associated Council infrastructure and Foreshores
Permanent FTE
Level 5
Page 50 of 64
Section 51
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
It is recommended to advertise externally for both positions in order to ensure that the roles are
filled with individuals who have direct civil design and construction project experience.
Previous Council Consideration
Ordinary Meeting, 17 November 2016, Item 6, Page 8
That Council note the report by the Design Services Coordinator to the Services & Organisation
Committee Meeting dated 8 November 2016 and endorse changes to Council’s organisational
structure that includes an increase of two fulltime equivalent (FTE) staff, one a permanent FTE
and one a three year fixed term position in the Infrastructure Planning & Design Branch.
Finance
The Asset Management Branch operational fund is currently below year to date budget and can
utilise current funds for the position of Asset Inventory Technical Officer until the end of the
2017/2018 financial year. There will be a requirement for the Asset Management Branch to
increase the future year’s annual operational budget for staffing by $130,000 for funding the
additional level 5 position and the redesigned position.
The Infrastructure Planning, Design and Delivery Branch is currently below year to date
operational budget and funds from the position of Technical Officer Coastal & Foreshores can be
utilised until the end of the 2017/2018 financial year. Funding of the additional positions have
been discussed with the Chief Executive Officer, Director Infrastructure Services and Director
Corporate Services and will be funded from capitalised staff budgets already provided for in the
2017/18 Capital Works Program. There will be a requirement for the Infrastructure Planning,
Design and Delivery Branch to increase the future year’s annual operational budget for staffing
by $5,000 for funding the redesigned Technical Officer Coastal & Foreshore position.
Risks & Opportunities
Council’s strategic risk register identifies poor workforce planning as a moderate risk which can
result in loss of corporate knowledge, financial risk, decreased service delivery, decreased staff
morale, decreased productivity, and have significant training implications.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Departments/Sections Consulted:
X Chief Executive Officer Community Services X Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Community Engagement Building & Plumbing Services X Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
X People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 51 of 64
Section 52
Page 52 of 64
> November 2017
INFRASTRUCTURE SERVICES DEPARTMENT Attachment 1
CURRENT ASSET MANAGEMENT
Director
Infra structure Services
10002
Car! Billingham
Asset Planning
Manager
10084
Bryan O'Connor
: Technical Officer — : Asset Systems
i Asset Planning* } Project Officer
; 10556 ; 10105
} CraigSmit = Benjamin Parry
i LGOA 5 i LGOA 5
nee nest
{Fecha Giloee Systems Officer
‘Asset Manage ment**: 10488
10557 es
i ar aat : (Penny Smith acting to
{ ; 04/12/2018)
Technical
Support Officer
10090
Vacant
LGOA2
Temporary/Casual positions
* Position 10556, Technical Officer —
\ Asset Planning is an additional fixed term i
\ position of 2 years concluding 04/12/2018 i
| ** Position 10557, Technical Officer- |
Asset Management is an additional fixed |
| term position of 2 years concluding |
' 98/02/2019 |
LeeLee LLL!
Total EFT: 4
Page 1 of 1
Prepared by People and Culture
Page 52 of 64Section 53
Page 53 of 64
> Novem
lovember 2017
INFRASTRUCTURE SERVICES DEPARTMENT
PROPOSED ASSET MANAGEMENT
Director
Infrastructure Services
10002
Carl Billingham
Asset Planning
Manager
10084
Bryan O'Connor
Technical Officer - Technical Officer -— Technical Officer — Technical Officer -
Asset Planning Capital Planning Asset Inventory Asset Systems
10556 10557 TBA 10105
Craig Smit Vacant Vacant Benjamin Parry
LGOA5 LGOA5 (Proposed new LGOAS
position)
LGOAS5
Asset Manage ment Asset Systems
Officer Officer
10090 10488
Vacant Craig Smit
(Proposed re-design (Penny Smith acting to
of position) 04/12/2018)
LGOA3-LGOA4 LGOA 4
(Banded)
Total EFT: 7
Not Counted
Page 1 of 1
Prepared by People and Culture
Page 53 of 64Section 54
Page 54 of 64
—_ November 2017
INFRASTRUCTURE SERVICES DEPARTMENT Director Attachment 2
CURRENT INFRASTRUCTURE PLANNING aT
T 10002
DESIGN AND DELIVERY Sart silingham
Infra structure
Planning, Design and
Delivery Manager
10088
Craig Eldridge
Technical Officer — Design Coordinator
Transport & Traffic 10086 eal
10103 Vacant Adam Britton
Scott Morgan LGOAT
LGOA6 LGOAT
Technical Officer - Project Officer Project
Traffic 10560 Coordinator
10463 Paul Brennan 10545
Kris Henricksen LGOA6 Jaro Bauleka
LGOA 4 Tenner eee erees LGOA 6
: Project Officer** Project
{ 10561 : Officer
: Daniel Wishaw : 10099
i LGOA6 i Dallas Bickley
nnn ereeteeee LGOAS
Designer -
Capital Works Project
10094 Officer
Ben L’Huillier 10101
LGOAS5 Joanna Ferris
(0.60 EFT)
Designer - LGOA6
Capital Works
10464 Technical Officer -
Steve Simpson Coastal &
(Danny Kang acting to Foreshores —----------------—
04/06/2018) | |
LGOAS 10091 | Temporary/Casual positions |
Vacant ie Project Manager, 10524, Ross |
Designer - mncabh ! Sanderson !
Capital Works * Position 10555, Designer — Capital
. 10100 \ Works is an additional fixed term position |
~_— ~~ ks | of 3 years concluding 09/10/2020.
rvsrsarssensensnessenseasezens | ne Position 10561, Project Officer is an |
: Designer - Capital : | additional fixed term position of 3 years |
i Works* i ' concluding 05/03/2020. !
t 10555 i an |
{ Samantha Carr :
beaetGOAS. | Total EFT: 13.6
Surveyor
10093
Allen Crampton Page 1 of 1
LGOAS5 Prepared by People and Culture
Page 54 of 64Section 55
Page 55 of 64
> N
lovember 2017
INFRASTRUCTURE SERVICES DEPARTMENT pr
PROPOSED INFRASTRUCTURE iene
10002
PLANNING, DESIGN AND DELIVERY 2
Car! Billingham
Infra structure
Planning, Design and
Delivery Manager
10088
Craig Eldridge
Technical Officer - Design Coordinator Project Manager
Transport & Traffic 10086 40098
10103 Mitch Turner Adam Britton
Scott Morgan LGOA7 LGOA7
LGOA6
Designer - ~
Technical Officer - Capital Works Project Project Officer
Traffic 40094 Coordinator 10560
10463 Ben L'Huillier = Paul Brennan
Kris Henricksen LGOA5 Jaro Bauleka LGOA6
LGOA4 LGOA6
Designer - -
Ca anes pra Project Officer
10561
Steve Simpson 10099 Daniel Wishaw
(Danny Kang acting to Dallas Bickley LGOAG
04/06/2018 LGOAS5
LGOAS
5 : Project i Project Officers
esigner Officer t TBA |
Capital Works 10101 ' :
i Vacant :
_ 10100 Joanna Ferris i LGOA5 i
Timothy Sparks (0.60 EFT) $llussussssdsdssussasssecsssssel
LGOAS5 LGOA6
Desi - Capital ae
See vorks apita Project Coordinator — ! Casual position |
40555 Flooding, Coastal ; - Project Manager, 10524, Ross
Samantha Carr and Foreshores \ Sanderson \
LGOA5 10091
Vacant Temporary positions
Sanaaaaemaaetacaaataaaaiaasaas LGOA6 * Position TBA, Project Officer is an i
i Designer - Capital : I additional fixed term position of 3 years i
; Works** i concluding TBA
TBA i f ’
} Vacant i | +» Position TBA, Designer — Capital Works!
; LGOA5 ; ' is anadditional fixed term position of 3 |
decescccccscccccccccccesscncceed | years concluding TBA |
LLL LLL LLL d
Surveyor
10093 Total EFT: 13.6
Allen Crampton
LGOA5 Not Counted
Page 1 of 1
Prepared by People and Culture
Page 55 of 64Section 56
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
7 FINANCIAL PERFORMANCE REPORT - OCTOBER 2017
DOCUMENT INFORM AT ION
Author Manager Financial Services, Trent Grauf
Corporate Services Department
Index ECM/ Subject/ 22.09 – Monthly Financial Performance Report
Attachments 1. Statement of Comprehensive Income
2. Statement of Financial Position
3. Statement of Cash Flows
EXECUTIVE SUMMARY
Overall year to date financial performance to October 2017 aligns with budget at this stage of the
financial year. The budget position reflected in this report and attachments does not include any
budget review 2 adjustments to be provided in a separate report to Council.
YTD Financial Performance Summary to October 2017
Budget Actual Variance Variance Status
$m $m $m %
Recurrent Revenue $41.9 $43.1 $1.2 2.8% On Track
Recurrent Expense $29.0 $28.9 $0.1 0.5% On Track
Operating Position $12.9 $14.2 $1.3 10.4%
Capital Revenue $0.8 $0.7 ($0.1) (7.1%) On Track
Capital Expenditure $5.0 $6.2 ($1.2) (24.8%) On Track
Financial statements including Statement of Comprehensive Income (profit & loss), Statement of
Financial Position (balance sheet), and Statement of Cash Flows are included as attachments for
information of Council.
Figure 1: Actual Performance Compared to 2017/18 Budget
$50
$45
$40
$35
$30
$25
$20
$15
$10
$5
$-
YTD Budget ($m) YTD Actual ($m)
Operating Revenue Operating Expenditure
Page 56 of 64
Section 57
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 13 November 2017 outlining the October year to date financial performance
against budget.
REPORT
Operating Revenue (YTD Benchmark 33.3%)
Council has received 46.7% ($43.1 million) of its operating revenue budget ($92.2 million).
Commentary on each revenue category is provided below:
Rates and Levies – $31.9 million (50.0%) of the annual budget of $63.8m has been earned.
General rates are slightly above budget, offset by waste utility charges and the Tourism
and Economic Levy being slightly below budget.
Fees and Charges – $2.1 million (44.7%) of the $5.1 million annual budget has been
earned. Search fees, change of ownership, local laws, development applications building
and pool compliance fees as well as caravan park shower fees are all slightly above YTD
budget. This is partially offset by waste temporary services, plumbing application fees and
cemetery fees being slightly below budget.
Sale of Goods and Services - $2.9 million (34.6%) of the $8.3 million budget has been
received. Holiday parks, Noosa Aquatic Centre and landfill disposal sales are all above
YTD budget.
Interest Received – $1.3 million (30.3%) of the $4.4 million annual budget has been earned
and is slightly ahead of YTD budget.
Dividend and Tax – Unitywater distributions are in line with budget.
Other Revenue – Building and Plumbing, The J, Local Laws, Waste Management,
Community Properties, Quarry Operations and Fleet revenues slightly ahead of budget.
Operating Grants, Subsidies and Contributions – Operational grants of $2.2 million (42.9%)
are tracking above YTD budget. This includes funding received to reimburse 2016/17 costs
relating to the ex TC Debbie clean-up of $342k (not budgeted), Community Development
grant for the Sport and Active Recreation Plan of $66k (not budgeted), Library grants of
$36k (maker space Cooroy and tech savvy seniors programs not budgeted), Local Laws
trainee subsidy of $13k (not budgeted) and Noosa Community Support funding is also $22k
ahead of budget.
Page 57 of 64
Section 58
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Figure 2: Operating Revenue Position by Type (Excluding Rates)
$4.5
YTD Budget ($m)
$4.0
YTD Actual ($m)
$3.5
$3.0
$2.5
$2.0
$1.5
$1.0
$0.5
$0.0
Other
Grants
Fees
Dividend
Tax
Interest
Operating Expenditure (YTD Benchmark 33.3%)
Actual operating expenditure is currently 31.3% ($28.9 million) of full year budget ($92.2 million).
Detailed commentary for each expenditure category is provided below:
Employee Costs – $8.9 million (29.5%) of the annual budget of $30.3 million has been
spent, which is in line with YTD budget.
Materials and Services – $12.9m (31.6%) of the $40.7 million annual budget has been
spent. Contract services are below YTD budget ($330k) across a range of areas including
Libraries, Waste Management, Economic Development, Community Development as well
as Infrastructure Planning and Design.
Finance Costs – in accordance with YTD budget.
Depreciation Expense – in accordance with YTD budget.
Other Expenses – $7k ahead of YTD budget (additional emergency management levies on
Council properties).
Figure 3: Operating Expenditure Position by Type
$14
$12
YTD Budget ($m)
$10
YTD Actual ($m)
$8
$6
$4
$2
$0
Finance Costs
Materials
Depreciation
Employees
Other
Page 58 of 64
Section 59
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Capital Revenue
YTD capital revenue of $750k received comprises cash contributions from developers ($408k)
and capital grants ($342k). Note that the timing of capital grant receipts are generally dependent
on the timing of associated capital expenditure, and that the timing of the receipt of developer
contributions (both cash and contributed) is unpredictable.
Figure 4: Capital Revenue by Type
$0.7
YTD Budget ($m)
$0.6
YTD Actual ($m)
$0.5
$0.4
$0.3
$0.2
$0.1
$0.0
Contributed assets
Cash contributions
Grants / subsidies
Capital Program
Actual capital expenditure (excluding commitments) is $6.7 million (YTD budget $5.0 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate report by the Asset Planning Manager.
Figure 5: Capital Program Delivery Performance
$7.0
$6.0
$5.0
$4.0
$3.0
$2.0
$1.0
$0.0
YTD Budget ($m) YTD Actual / Committed ($m)
Capital works Other capital
Page 59 of 64
Section 60
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Cash Management and Investment Performance
Total cash on hand at the end of October was $77.6 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds) and monies
committed for funding capital projects during the year.
The pie charts on the following page present the mix of cash held at October 2017 by agency
(graph on the left) and by credit risk rating (graph on the right).
Figure 6: Closing Cash Held by Agency and Credit Rating
Bendigo A3
5% 5%
Westpac
10%
A1 +
NAB
(Other)
10%
31%
A1 +
CBA QTC (QTC)
11% 64% 64%
The following chart monitors the year-to-date trend on total cash and the agencies invested.
Figure 7: Year to Date Trend of Cash Invested by Agency
100,000,000.00
90,000,000.00
80,000,000.00
70,000,000.00
60,000,000.00
50,000,000.00
40,000,000.00
30,000,000.00
20,000,000.00
10,000,000.00
-
Jul-17 Aug-17 Sep-17 Oct-17
Bendigo Suncorp Westpac NAB QTC CBA
Actual interest revenue for October was $156k with a weighted average yield of 2.29%, which
reflects a positive return compared to the industry benchmark (Bloomberg AusBond Bank Bill
Index) of 1.72%.
Page 60 of 64
Section 61
GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:
X Chief Executive Officer X Community Services X Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
X Executive Services X Environment & Sustainable Development X Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 61 of 64
Section 62
Page 62 of 64
Noosa Council ATTACHMENT 1
Statement of Comprehensive Income
For the Year Ended 30 June 2018
As at 31 October 2017
Current Current
Budget Budget Actual Variance Annual
2018 YTD YTD YTD Budget
($'000) ($"000) ($'000) ($'000) %
Revenue
Recurrent Revenue
Rates, levies and charges 63,848 31,924 31,915 (9) 50%
Fees and charges 5,080 2,115 2,271 156 45%
Dividend income 1,860 925 925 - 50%
Interest received 4,390 1,256 1,330 74 30%
Tax equivalents 1,200 400 400 - 33%
Sale of Goods and major services 8,312 2,642 2,878 236 35%
Sale of contract and recoverable works 16 1 12 11 13%
Rental & lease income 1,322 497 524 27 40%
Other income 1,110 469 649 179 58%
Grants, subsidies, contributions and donations 5,063 1,672 2,174 502 43%
92,201 41,901 43,078 1,176 47%
Expenses
Recurrent Expenses
Employee benefits 30,338 8,992 8,935 (57) 29%
Materials and services 40,696 12,978 12,875 (103) 32%
Finance costs 2,464 825 819 (5) 33%
Depreciation and amortisation 18,577 6,192 6,192 0 33%
Other expenses 112 42 48 7 43%
92,187 29,029 28,870 (159) 31%
Operating Result 15 12,873 14,208 1,335
Capital Revenue
Capital contributions and donations 1,867 622 408 (215) 22%
Grants, subsidies, contributions and donations 4,009 185 342 157 9%
Other capital revenue - - - -
Total Capital Revenue 5,876 807 750 (57)
Page 62 of 64Section 63
Page 63 of 64
Noosa Council ATTACHMENT 2
Statement of Financial Position
For the Year Ended 30 June 2018
As at 31 October 2017
Current Actual Actual
Budget YTD Full Year
2018 2018 2017
($'000) ($000) ($000)
Current Assets
Cash and cash equivalents 48,418 74,191 65,463
Trade and other receivables 8,381 7,363 7,101
Inventories 156 335 330
Other current assets 468 2,660 2,796
57,424 84,550 75,690
Non Current Assets held for sale - - -
Total Current Assets 57,424 84,550 75,690
Non Current Assets
Trade and other receivables 49,218 49,218 49,218
Other non current Assets - - -
Investments 69,141 60,978 60,978
Investment property 4,150 4,405 4,405
Property, plant and equipment 935,214 918,910 913,152
Intangible assets 3,837 4,009 3,497
Total Non Current Assets 1,061,560 1,037,519 1,031,249
Total Assets 1,118,984 1,122,069 1,106,939
Current Liabilities
Trade and other payables 4,501 15,408 11,819
Borrowings 3,040 1,904 3,745
Provisions 4,394 2,291 4,076
Other 548 802 645
Total Current Liabilities 12,483 20,406 20,285
Non Current Liabilities
Trade and other payables - - -
Borrowings 35,005 34,291 34,291
Provisions 9,305 9,879 9,843
Total Non Current Liabilities 44,310 44,169 44,133
Total Liabilities 56,793 64,575 64,418
Net Community Assets 1,062,191 1,057,494 1,042,521
Community Equity
Asset Revaluation Surplus 46 961 26,892 26,892
Retained Surplus / (Defeciency) - - -
Shire Capital 1,015,230 1,015,629 1,000,677
Current Year Net Earnings - 14,973 14,951
Total Community Equity 1,062,191 1,057,494 1,042,521
Page 63 of 64Section 64
Page 64 of 64
Noosa Council ATTACHMENT 3
Statement of Cash Flows
For the Year Ended 30 June 2018
As at 31 October 2017 Actual Actual
YTD Full Year
2018 2017
($'000) ($'000)
Cash flows from operating activities
Cash Flows from Operating Activities
Receipts from Customers 39,573 81,498
Payments to Suppliers and Employees (21,904) (67,789)
17,669 13,709
Receipts:
Investment and Interest Revenue Received 1,330 4 831
Rental Income 524 1,337
Non Capital Grants and Contributions 2,174 6,287
Income Tax Equivalent Received 400 1,456
Income from Equity Investments 925 1,568
Payments:
Borrowing Costs - -
Interest Expense (90) (122)
Net Cash Inflow/(Outflow) from Operating Activities 22,932 29,066
Cash Flows from Investing Activities
Receipts:
Proceeds of Sale of Property, Plant and Equipment - 259
Grants, Subsidies, Contributions and Donations 750 6,314
Payments:
Payments of Property, Plant and Equipment (11,777) (19,317)
Payments for Intangible Assets (670) (1,176)
Net Cash Inflow/(Outflow) from Investing Activities (11,697) (13,920)
Cash Flows from Financing Activities
Receipts:
Proceeds from Borrowings - 2,697
Payments:
Repayment of Borrowings (2,569) (4,966)
Net Cash Inflow/(Outflow) from Financing Activities (2,569) (2,269)
Net Increase/(Decrease) in Cash and Cash Equivalents held 8,666 12,877
Cash and Cash Equivalents at the beginning of the financial year 68,835 55,958
Cash and Cash Equivalents at the end of the financial year 77,501 68,835
Page 64 of 64