GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
Soil Contamination
9. As part of any Operational Works application for the site a detailed site contamination
assessment report prepared by a suitably qualified and experienced person in
accordance with the procedures and practices detailed in the National Environment
Protection (Assessment of Site Contamination) Measure 1999 (NEPM) is
required. The report must conclude:
a. whether the site is suitable for the proposed new use/development (with and
without remediation and/or management);
b. whether any site contamination is causing, or is likely to cause, ‘environmental
harm’ (as defined under the Environmental Management and Pollution Control
Act 1994); and
c. whether any site contamination presents an occupational health and safety risk
to workers involved in redevelopment of the site.
10. If the site contamination assessment report concludes that remediation and/or
management strategies are necessary to avoid risks to human health or the
environment, a proposed remediation and/or management plan must be submitted to
Council prior to the commencement of building works. Any remediation or
management plan involving soil disturbance must include a detailed soil and water
management plan to prevent off-site transfer of potentially-contaminated soil or
stormwater.
NB: It is mandatory for any contaminated land investigation documents, including
investigation reports, validation reports and draft site management plans to be
certified by an approved auditor and must have approval from the Department of
Environment and Heritage and Protection (DEHP). DEHP have list of approved
auditors.
Site Access and Driveways
11. A sealed access driveway must be provided from Ernest Street and Earl Street to all
parking and manoeuvring areas of the development. The works must be undertaken
in accordance with an Operational Works approval and must include in particular:
a. driveway crossovers in accordance with Council’s standard drawing RS-051
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning signage
must be provided near the driveways to warn motorists of pedestrian movement
along the street frontages
12. All vehicles must enter and leave the site in a forward direction.
Car Parking
13. A minimum of 38 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. pedestrian routes in accordance with the approved plans
b. provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
c. 1 disabled parking space/s within the total
d. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities
Page 8 of 64
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.