Council archive · source document
05/0699 - Change to Development Approval [As Published] · 132005.699.02
NOOSA COUNCIL IDAS Development Application Decision Notice 123. ~3//8 DA 2efobfoy. Prior to the endorsement of the Pian of Survey, the Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles Office forms or requisitions requiring the consent of Council being attended to forthwith. Pedestrian Paths / Bike Paths 424 125. 126. 127. 128. 129. 130. 131, 432. . A 1.5 metre wide meandering concrete path shall be constructed within the footpath to the frontages of the development. This path shall commence from the end of the existing 1.5 metre wide path at the boundary between Lot 2 & 3 on SP100064 and continue down the northern side of Serenity Close before wrapping around the cul-de-sac and heading back along the southern side of Serenity Close until it meets with Banksia Avenue. From the intersection with Banksia Avenue a 1.5 metre wide path shall head south along the Banksia Avenue frontage of the development, past the proposed cul-de-sac / turning facility at the Grant Street intersection, until it links with the proposed 3 metre wide Multi Purpose Pathway to be provided near Council's Sewerage Pump Station (as defined below). A 2 metre wide path shall be provided around the back of the proposed cul-de-sac / tuming facility at the Grant Street intersection linking the 3 metre wide Multi Purpose Pathway with the 2 metre wide pathway to be provided along the eastern side of Banksia Avenue (and linking with Grant Street). The 3 metre wide Multi Purpose Pathway (as briefly mentioned above) shall be constructed from concrete, generally around the perimeter of the Residential High Density development utilising the existing cleared areas over Council's sewer main. The path shall be designed and constructed as a Multi Purpose Pathway for fire fighting purposes (fire break / fire access) and for pedestrians and cyclists to use. To this extent the path shall commence from the 2 metre wide path (around the back of the proposed cul-de-sac / turning facility at the Grant Street intersection) and shall wrap around the bottom of the Residential High Density allotments to link with the future boardwalk (which will link with the future Jetty to be provided by the applicant in Noosa Inlet) or unless otherwise approved by the Manager of Land Development. The actual alignment of the pathway shall be chosen in consultation with Council's Land Development Section and Council's Water Supply & Sewerage Section to avoid the risk of any damage occurring to Council's infrastructure. In this regard an on-site meeting with the approved contractor and representatives from both the Land Development and Water Supply & Sewerage sections of Council shall be arranged by the applicant after the alignment of Council's sewer main has been accurately surveyed and located on site. As this pathway will also be used for fire access the applicant shall ensure that appropriate cover is maintained to the sewer main to allow for vehicle loads. A 1.5 metre wide link path shall be provided between proposed Lots 9 & 10 within a 4 metre wide road reserve — linking the cul-de-sac in Serenity Close with the 3 metre wide Multi Purpose Pathway around the perimeter of the Residential High Density development. In addition to this a 1.5 metre wide link path shall be provided between proposed Lots 10 & 11 within the existing sewer easement linking the future development within Lots 10 & 11 with the 3 metre wide Multi Purpose Pathway around the perimeter of the Residential High Density development. In choosing the alignment of all these paths care shall“be taken to protect any significant vegetation or any underground services. - Pram ramps shall be installed at intersections (and wherever else required) in accordance with Council's Standard Drawing 9006. All paths and pram ramps shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. A Development Permit for Operational Works shall be obtained prior to the commencement of any works. Where footpaths are located in cut or where site conditions indicate the presence of groundwater in proximity of the natural ground level, subsoil drains shall be constructed between the back of path and the property boundary. Ho.\database\onestop\decision.doc 6)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05/0699 - Change to Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 440 KB (small file)
- File type
No other editions are linked here.