b) A traffic management It is considered that a traffic The applicant has not provided
procedure to demonstrate management procedure is not the information required.
refuelling will not impact on necessary. As per the Traffic
traffic movements in Eumundi- Report prepared by QTraffic The applicant states that the
Noosa Road or the internal originally submitted, the site existing arrangements will still
traffic within the site. Also, access arrangements are apply, but they do not take into
advise if time restrictions will consistent with the existing consideration the low threshold
be implemented on refuelling arrangements, and are for queuing which exists once
operation schedules to address considered to be appropriate refuelling commences and
this issue. given the nature of the use and vehicles are dually utilising the
the existing road environment. easement for both
Section 4 of the report states development sites during the
that the level of traffic refuelling process, that is,
generation for the proposed existing arrangements are
development is low, and once insufficient.
distributed onto the
surrounding road network,
would be within the range of
typical fluctuations in traffic
volumes.
c) Assessment of the need for a It is considered that queuing in The applicant has not provided
no-queuing area to avoid the easement area will be the information required.
obstructions to traffic flows unlikely as a result of the
within the access easement proposed service station Any future development of the
area and to allow for the future development given the ample second lot will require to either
development of the balance lot. queuing space on site, as per co-utilise the easement
Drawing No 15193- D13. resulting in back-up or apply to
However, as mentioned in 7.a install a neighbouring
above, any future development easement. A second easement
application over the balance lot will present visibility difficulties
will also presumably be and associated risks to exiting
required to demonstrate no vehicles. It will also pose an
queuing into the easement unacceptable risk of further
area. compounding traffic congestion
on the Eumundi Noosa Road
81. Significantly, the applicant has not provided any solution to the Noosa Council’s
concerns with the potential for queuing in the road and traffic conflict in the shared
access area (easement area), as in its opinion, queuing in the easement area will be
unlikely as a result of the proposed service station development given the ample
queuing space on site. As the applicant has not allayed the Council’s concerns, this
clearly supports our position that the DA is inconsistent with the following objectives
of the Noosa Plan:
Use of land for a service station does not impair traffic flow or road safety
The safety of pedestrians and cyclists is protected
Vehicular access does not adversely impact on safety, capacity and
operations of the existing or planned road network, the proposed driveway,
cycleways or pedestrian pathway system
Access and egress points do not impact on the safety and operations of the
road system