Council archive · source document
08/1491 - MCU - Detached House [As Published] · 132008.1491
5 VALIDATION Validation testing is regarded as an essential component of the management plan. Due to the variable nature of mixing soil and fime, care must be exercise to obtain a representative sample for validation analysis. The engineer, project manager, geotechnical officer or other suitably qualified person must ensure the validation testing has been performed and the results are satisfactory. A copy of the test certificates is to be submitted to the local authority (or referral agency). 5.1 Validation Sampting ‘ The sub-samples must be representative of the treated soil volume. The location of the samples should span the depth as well as the horizontal area for placed soil. For stockpiled soil the samples should be evenly spaced through the soil mass. The distribution of lime in a lime treated soil mass is typically highly variable on a small scale. Whilst this mixing is adequate on a “landscape” scale it makes accurate sampling difficult. It can be expected to collect some sub-samples with no lime and others with a high lime content. it is necessary to collect a large number of sub-samples to form a composite sample that provides an “average” lime content. This process will take from one hour to one day per composite sample depending on the time required for sub-sample extraction. If sampling is biased towards samples with a high lime content the analysis results will be at odds with the known volume of lime that was applied. Use a sampling device to obtain a minimum of 20 and up to 40 approximately equal volumes of limed soil. The minimum sub-sample size should be in the range of 100-200 cc in volume. Mix these carefully on a plastic sheet or container taking care to avoid segregation of the fine and coarse fraction. Quarter down to retain a 200 gram composite sample. * The location of the sample area/depth is to be recorded. ‘ Perform validation testing at the following rates: * one test per 500 cubic metres for on-site placement * one test per 250 cubic metres for off-site placement . one test per 125 cubic metres for off-site placement within 50 metres of a drainage line, stream or other surface water or where the watertabie is within 2 metres of the surface or where the site is below the 50 year flood line. Validation testing should include chemical analysis (GPOCAS or chromium reducibie sulphur test suites) and calcium carbonate. * It is recommended the sampling and mixing method is carefully documented and performed according to plan. A proportion of samples will "fail". This is statistically predictable even though the correct rate of time has been applied. Adherence to rigorous sampling and mixing techniques makes it difficult to blame the sampling stage should a test fail. * Samples are regarded as successfully treated provided they meet the following criteria: a) oxidised pH >6.5 b) equivalent suiphur content below 0.03% * In the event of a validation test failure a re-test is required. if the subsequent test fails then the material must be re-timed to meet the test standard. 5.2 Scheduling of Validation Sampling Validation testing of lime treated samples will require time for sampling, sample transport to a laboratory, sample drying and analysis. This process can easily require 5-7 working days. Where soils are treated and then placed the schedule of placement should allow sufficient time for the validation process. In the event of sampies failing the validation test it will be necessary to add additional lime and re-test the treated material again. Bio-Track Pty Ltd 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1491 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.