Log in to see the plans as drawn CONCRETE: CONCRETE CONT.: ROOF FRAMING: ROOF TRUSSES:
CONCRETE - GENERALLY: STRUCTURAL CONCRETE AND REINFORCEMENT : ROOF FRAMING - ENGINEERED TRUSSES: Prefabricated roof trusses, their bracing and the connections
All conc work must comply with 3.2.3. of the BCA. and AS 2870. UNO in the Engineers drawings : Prefabricated MGP10 pine (JD4) Engineered roof between trusses and to the supporting members are to be
Refer to the Engineers DWGS and specifications for further trusses at 900 max. crs. to AS 1720 and fixed in designed and fabricated by an approved firm of the truss
detail. All concrete work shall be in accordance with AS 3600 accord AS 4440. All must be designed for the wind fabricators. The design of the truss system shall include
Concrete Structures. Cat noted on the drawings. Refer to truss allowance for the following items:
FOUNDATIONS - GENERALLY : manufact. for tie down connections at girders, hip
Refer to Geotechnical report.Foundations are defined at BCA Concrete specification shall be :- end girders and hips. Provide bracing in All trusses shall be designed for the loads set out in the design
Fig 1.1.2. Foundation material is to be verified during ELEMENT GRADE SLUMP MAX. AGG accordance with manuf. criteria and in accordance with AS1170, parts 1 and 2. All
excavation as consistent with the Geotechnical Engineers Site Corefill 200 CMB N30 230+/-30 10mm recommendations. Fit 75 x 38 F8 Tie binders top & trusses shown on the drawings together with any other trusses
Foundation report and the nominated soil classification. Interior RC refer ENG 100+/-15 20mm bot at 3000 max. crs. for all scissor trusses and needed to complete the roof profile. Fascia beams as
Foundation bearing capacity is to be inspected and approved Exterior RC refer ENG 100+/-15 20mm common truss spans in excess of 9000. required to provide support at corners. Truss to truss and truss
by the Certifier or a qualified practicing RPEQ Engineer before Elsewhere slump shall be in accord. sect 19 of A.S.3600 to fascia beams to support Connections, all permanent
placement of any concrete. and A.S.1012.3 Slump may be increased using approved The manufacturer is required to supply : temporary bracing and binders. Pre-camber trusses as
plasticiers extra water must NOT be added. a. An Engineered truss certificate of conformity, required such that the long term deflection in any horizontal
FOUNDATIONS - (STRIP FOOTINGS) : b. a truss assembly diagram significantly in plane does not exceed the lesser of span/360 or 10mm.The
Where Strip footings tied to the slabs are used, they shall be Cover to reinforcement shall be :- accordance with the ROOF FRAMING DWGS, truss manufacturer is to provide additional roof bracing in
founded on material with a min. bearing capacity of 50 kPa. · FOOTINGS - bot 75mm, and sides & top 65mm UNO c. a schedule showing uplift load and fastener accordance with AS4440. Web members in roof trusses are to
Strip footings, not tied to the slab, shall be founded on 100 · SLAB ON GROUND - top 30mm UNO selection for each individual truss. allow for the clear passage through the roof space for
k.p.a. bearing capacity material. Concrete grade to be a · SUSPENDED SLABS - top & bot 20mm UNO electrical, mechanical and hydraulic services and equipment
NOTE: Non compliance with the above will result in
minimum of 25mPa · Increase cover where surface is external by 10mm rejection of the framing by the Certifier or as shown on the relevant engineers drawings. Bottom chord
· Within CMB - 10mm Superintendent and removal from site at the cost bracing which is structurally adequate to transfer the wind
FOUNDATIONS - (PAD FOOTINGS) : of the manufacturer. Liquidated damages for loads from the roof trusses to the nominated bracing walls is
Comply with BCA 3.2.2.3(c). Isolated pad footings shall be Reinforcement shall be tied in position and supported on achieved either by plasterboard (or similar) ceiling fixed to
delay
founded in natural ground with a min. bearing capacity of 100 approved plastic tipped chairs to provide the required battens which are screwed to the bottom of the chord of the
may also apply.
kPa. Concrete grade to be a minimum of 25mPa cover truss or by a system of bracing members fixed to the bottom
and as follows : - NEVER cut, alter, drill, relocate or field modify any chord of the truss. All trusses shall be supported at node points
EXCAVATION FOR FOOTINGS: · Bars up to N12 and fabric - 800mm crs only. Fabrication and certification manufacture of roof trusses
truss. Errors in building lines or dimensions, uneven
Excavations for footings must comply with BCA 3.2.2.1. Footing · Bars N16 and larger - 1200 mm crs. shall not commence until : A design certificate stating that
bearing, walls not parallel etc, shall be corrected
steps must be in accord BCA Fig 3.2.2.2. Excavations for beams the trusses, the top and bottom chord bracing of the trusses,
BEFORE installation of trusses begins.
must not be undertaken during rain. Excavate only that work Site welding or bending is not allowed without the written the connections between trusses, and the connection to the
which can be completed for the day. Pour concrete only approval of the Engineer support structure have been designed to safely resist the
ROOF FRAMING - BRACING :
when directed by the Engineer. loads set out in the design criteria has been received by a
Provide temporary bracing of 70 x 35 F5 at 3M max
Laps unless noted otherwise (UNO) shall be :- crs to Top chords and 4M max crs to Bot chords. Fix RPEQ (Registered professional engineer )
SUB-BASE PREPARATION : · Fabric - 1 complete mesh + bar diameter. Tied at 900 crs using 2/75x3.75mm double headed nails. Provide
Comply with BCA 3.2.2.3. Use only imported approved sub- · N12 - 300mm. Tied at 100 crs. Note: Roof trusses and associated framing, bracing and tie
permanent bracing as indicated on the ROOF
base fill. Fill preparation is to reflect all beams, falls, recesses, · N16 - 450mm tied at 100 crs down are to the truss manufacturers design & detail.
FRAMING
etc. to ensure compliance with mesh cover. Provide · N30 - 650 Tied at 100 crs
thickenings below bracing walls. All fill is to be Controlled to · Horz. Bars with 300mm or more concrete under them
150mm max. layers and compacted to 98% R.D.D. 50 k.p.a. shall have laps 1.25 times greater than these lengths.
bearing capacity. TANKING: ROOF FRAMING:
Construction joints shall be scabbled and cleaned and
STARTER BARS : coated with a neat cement/water slurry immediately prior TANKING SYSTEMS - GENERALLY: SARKING - GENERALLY :
Strip footing tie bars (starters) are required to be cranked and to For clarity tanking systems are any membrane with the Use a Reflective Building Membrane under all roof
cast into footing beam 250mm min at 400mm max. crs. Turn concrete placement. primary purpose to prevent damp or moisture movement claddings. Sarking must comply with AS 1530.2 and
down into the slab 450mm min 35 clr cvr. within a structure. They include Waterproofing, DPC’s and have a flammability index equal to or less than 5
All concrete shall be mechanically vibrated avoiding Vapour Barriers. Systems must comply with AS/NZS 4200, and provide sarking below all roofed areas.
DRAINAGE PIPES: segregation. AS/NZS 4858, the BCA 3.8.1.4 and manufacturers literature. Provide Anti-ponding boards to tiled roofs.
Horizontal drainage pipe runs must not penetrate beams unless Allow to install tanking/waterproofing systems as noted on Terminate sarking 50mm into gutter. Fix sarking in
Concrete shall be cured for a minimum of 7 days by a the drawings, in accordance with section F1, & F2.2 of the accord. manuf. specifications between roof
method approved in writing by the engineer. BCA. framing and batten. (Ensure 40mm min. sag
SITE PREPARATION: between framing members). Fit additional Added
Conduits, Pipes, etc must not be placed in the location WATERPROOFING - WET AREAS: Insulation as required by the BCA.
NATURAL CONDITIONS : of concrete cover. Penetrations, holes, recesses, chases, Install 6.0mm “Hardies floor underlay system” over the
In accordance with QBCC policy for subsidence the builder is embedments or construction joints, other than those structural floor sheeting in wet areas to manuf. Written SARKING - METAL ROOF (FOIL) :
required to inspect the area surrounding the site to identify any shown on the spec. Waterproof the underlay using epoxy system to A.S. Use a Reflective Building Membrane in TRUSSED
natural conditions and features (drains, low points, gullies) that Engineering drawings, are NOT allowed unless approved in 3740. Provide mortar tile bed with fall/s 1:90 to C.P. floor AREAS ONLY. Allow to use “AIR-CELL Retrosheild"
may have potential for concentrating overland flow of surface writing waste where shown. roof sarking fixed between roof framing members
water. Any such potential must be conveyed to the Engineer for by the Engineer. and batten. Terminate 50mm into gutter. Fix in
further analysis. Prior to any excavation or construction the WATERPROOFING - SHOWER AREAS : accordance with the manufacturers specifications.
Principal Contractor is required to contact the relevant local Formwork shall comply with AS 3610 “Formwork of In shower cubicles provide copper or SS tray or class 1 WP
authority for flood information and possible minimum floor level Concrete” and all relevant Construction Safety membrane over floor underlay system. Waterproof shower
requirements. Legislation. Unless areas in accord. A.S.3740. Provide mortar tile bed. Ensure
noted otherwise finishes shall be Class 2. Generally fall 1:80 to 65mm Ø C.P. floor waste. Waterproof entire
QBCC HOME WARRANTY INSURANCE : Formwork for shower cubicle using epoxy system to A.S. 3740.
The Principal Contractor’s attention is drawn to the QBCC policy suspended slabs shall remain in position for 14 days after
on placement. Eased and back-propped for 28 days. In all VAPOUR BARRIER:
Subsidence which requires a RPEQ Engineer to be briefed by the cases Provide vapour barriers under all slabs in accord AS/NZ
builder to assess the site soil conditions for class 1 buildings. The minimum formwork stripping times shall be in accordance 4200.1. Vapour barrier/s (damp-proofing membrane) must
Principal Contractor is required to implement QBCC warranty with comply with 3.2.2.6 of the BCA and AS 2870. UNO use
insurance and comply with QBCC policy. The briefing form Table 5.4.1 of AS 3600. '0.2mm Visqueen' with 200mm min laps taking care to face
‘ENGINEER the laps away from the direction of conc. placement and
securely tape all laps and vertical service penetrations and
punctures. The membrane is to extend down the inside
face of the edge beams and across any strip footings to
the external perimeter of the building.
No. Description Date
A Approval Issue 10/10/2020 Project number Scale at A3
Project Client Drawing Drawn by
dennishillarchitect 27 Grant Street, Brown Rooster Pty STRUCTURAL DRH
B
C
Approval Issue C
Approval Issue D
18/11/2020
04/12/2020
049 1 : 100
mobile: 0438 20 55 66 | [email protected] Noosa Heads Ltd GENERAL NOTES
www.dennishillarchitect.com
D Approval Issue E 10/12/2020
BA.090
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright. 10/02/2021 8:05:29 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.