RFI - 20220156 Kauri St OPW REV B
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \
\ \ \ \ \ \ \
\ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \
N
W
\ \
\ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \
W
\ \ \ \
\ \ \ \ \ \
\ \ \ \ \ \ \
\
W
\
\ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
STREET
8.0
// // // // // // // // // // // // // // // // // // // //
11
W
7 .5
11
|S|
W
.0 . 5 . 0
.5
0
.5 13 12 12 111
7.
3 1 1 1
11
11
5
6.
|S|
5 0 .5
W
.
0
.
0
11
15 15 4
6.
4.
1 1 11
11
11
0
1.
11
|S|
\ \ \ \ \ \ \ \ \ \ \ \ \
W
\ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \
KAURI
|S|
5
0.
SW
11
|S|
\ \ \
SW
\ \ \ \ \ \ \ \ \ \ \ \
|S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S| |S|
// // // // // // // // // // // // // // // // // // // //
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
T
\ \ \ \ \ \ \ \
\ \ \ \ \ \ \
\ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
T
\ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \
T
\ \ \
\ \ \ \ \ \ \ \
TT
SEDIMENT CONTROL TEMPORARY CONSTRUCTION ENTRY/EXIT
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING
1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL EROSION CONTROL ASSOCIATION ESC-01, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
(IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING
1. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
T
INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL
BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS. REVEGETATION
3. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED 12. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA)
AND EFFECTIVE PRIOR TO: BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION GENERAL.
a. STRIPPING OF TOPSOIL AND GRASS.
b. BULK EARTHWORKS TO THE SITE. OPERATION AND MAINTENANCE
c. SERVICES INSTALLATION. 13. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:
d. PAVEMENT CONSTRUCTION · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE SEDIMENT AND EROSION CONTROL:
· WITHIN 24 HOURS OF EXPECTED RAIN; AND CONTRACTOR TO ALLOW FOR PROVISION OF ALL
SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS. · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE). REQUIRED SEDIMENT AND EROSION CONTROL
6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWINGS. 16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING DEVICES IN ACCORDANCE WITH NOOSA SHIRE
7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF TABLE: COUNCIL POLICIES AND GUIDELINES
THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS MAINTENANCE SCHEDULE
TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL TIMEFRAME FOR COMPLETION LEGEND
ESC MEASURES MAINTENANCE TRIGGER
PLANS. SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT. OF MAINTENANCE
|S| SEDIMENT FENCE
WHEN SETTLED SEDIMENT
9. OVERALL SEDIMENT BASIN WITHIN 7 DAYS OF THE
EXCEEDS THE VOLUME OF THE
a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE WHERE POSSIBLE. (WHERE UTILISED) INSPECTION
SEDIMENT STORAGE ZONE
CONSTRUCTION ENTRY
b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE OTHER ESC 1/3 OF THE CAPACITY OF ESC
EARTHWORKS. BY THE END OF THE DAY
MEASURES MEASURES IS EXCEEDED
c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER MULCHED, COVERED WITH
EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS. REPORTING STOCKPILE LOCATION
17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR APPROVAL
SEDIMENT FENCE BY THE SUPERINTENDENT.
10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING ESC-04 AND
ESC-05, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED RESIDENTIAL DEVELOPMENT
SUNSHINE GROVE PTY LTD TITLE: STATUS:
9 KAURI STREET EROSION AND SEDIMENT MATERIAL CHANGE OF USE
© ABN 89 647 469 707
B 28/10/22 RFI ISSUE BRP BRP
COOROY, QLD, 4563 BEN PARRY CONTROL LAYOUT PLAN AND
RPEQ: 28084
37 MARY ST
NOOSAVILLE, QLD 4566
A 10/08/22 COMBINED MCU AND OP WORKS ISSUE JAC BRP JB SCALE:
CPEng NER
AND DETAILS OPERATIONAL WORKS
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:200 DATE: 28/10/22
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C20 20220156 A1 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.