Skip to the record
The only place to find full transcripts.

Original source · versioned page text

20220089 Jirrima Cr SWMP

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Figure 3.2 – Flood modelling points of interest



Table 3.2 – Point of Interest Descriptions

      Point ID                                        Description
  1                 Eastern side of Crossing

  2                 Centre of Crossing

  3                 Western side of Crossing

  4                 Upstream Property Boundary

  5                 50m south of upstream property boundary

  6                 Downstream Property Boundary

  7                 50m north of downstream property boundary



A summary of the results is included in Table 3.3 and showing the pre and post conditions at the nominated
locations through the drainage feature. Refer to Appendix C TUFLOW Modelling Flood for the flood maps
resulting from the modelling.




Project number 20220089                                                                                  Page 13 of 23
File 20220089 Jirrima Cr SWMP.docx, 2023-05-09 Revision 0


P +61 7 5211 1003                  A 75 Noosa Drive, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

20220089 Jirrima Cr SWMP.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.