20220089 Jirrima Cr SWMP

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 PROPOSED SUBDIVISION
 21 JIRRIMA CRESCENT COOROIBAH, QLD 4565
 CIVIL WORKS

GENERAL NOTES
1.     ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.
2.     ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
       CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY
       SETOUT THE WORKS.
3.     ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT
       SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE
       CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT
       GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED
       STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
4.     EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS
                                                                                                                                                                                                                   SUBJECT SITE
       SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS
       TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND
       COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE
       CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL
       EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY
       DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.
       CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING
       PROPOSED WORKS.
5.     THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
       SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
       ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES
       PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY
       REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION
       PRIOR TO COMMENCING CIVIL WORKS.
6.     ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
       BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,
       CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD
       PAVEMENTS.
7.     CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
       AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR
       REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION
       OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.
                                                                                                                                                                                                    LOCALITY PLAN
8.     ALL WORKS ARE TO BE UNDERTAKEN IN ACCORDANCE WITH ALL RELEVANT
       WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                                                                                                                    NOT TO SCALE
9.     WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE
       PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
       CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
       NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
       INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
       EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
10. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
    APPROVALS.
11. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
    CONSULTANTS/CONTRACTORS DRAWINGS:
                                                                                                                                                                                          DRAWING SCHEDULE
               SURVEYOR:     MAX WATTERSON AND ASSOCIATES
                                                                                                                                                                        DRAWING
               ARCHITECT:    TBA                                                                                                                                                                 DRAWING TITLE                    REVISION
                                                                                                                                                                        NUMBER
               HYDRAULICS:   TBA
                                                                                                                                                                          C01       COVER SHEET AND LOCALITY PLAN                    2
               STRUCTURAL:   TBA
                                                                                                                                                                          C30       PROPOSED DRIVEWAY CROSSOVER                      2
               LANDSCAPE:    TBA
                                                                                                                                                                                         LAYOUT AND DETAILS
12. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
    ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS                                                                                                           C31         DRIVEWAY LONGSECTION                         2
    WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
    ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
                                                                                                                                                                            C32          DRIVEWAY CROSS SECTIONS                     2
13. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL
    AUTHORITY APPROVALS RECEIVED FOR THE PROJECT
14. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW                                                                                                                C33          STORMWATER LONGSECTION                      2
    APPROVALS BY COUNCIL FOR THIS PROJECT.
15. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE
    BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
    THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD
    RESERVE, PARKS/OPENSPACE, EASEMENTS.




                                                                                                   SCALE:                                      CLIENT:                            APPROVED BY:                 PROJECT NAME:

                                                                                                                                                                                                               PROPOSED SUBDIVISION AT 21 JIRRIMA CRESCENT
                                                                                                                                 1:1                                                                           TITLE:                        STATUS:

                                                                                                                                                                                                               COVER SHEET AND               RFI RESPONSE
      © ABN 89 647 469 707                                                                                                                               IAN & JANIS ROWE                   BEN PARRY          LOCALITY PLAN
                                         2   15/05/23   RFI UPDATE               BP          BP
         37 MARY ST
                                                                                                        SCALE 1:1                                                                           RPEQ: 28084
                                         1   04/04/22   'RFI RESPONSE' ISSUE     JAC   BRP   BRP            10    20   30   40   10    100mm
     NOOSAVILLE, QLD 4566                                                                                                                                                                   CPEng NER          DRAWING NUMBER:               PROJECT NUMBER:            REV:
        +61 7 5211 1003                REV   DATE                 DESCRIPTION    DWN   CHK   APP                                                                                                                                                               SHEET
                                                                                                                                                                                           DATE: 15/05/23                                                       SIZE:
 RECORCONSULTING.COM                                                 REVISIONS                                                                                                                                 C01                           20220089          A1        2
Log in to download the original file

20220089 Jirrima Cr SWMP.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.