Original source · versioned page text
20220089 Jirrima Cr SWMP
Contents
Introduction..........................................................................................................................................4
Site Details ...........................................................................................................................................5
2.1. Existing Site Description ...................................................................................................................... 5
2.2. Existing Drainage Patterns .................................................................................................................. 6
2.3. Proposed Development Drainage Patterns........................................................................................ 7
Flood Assessment ...............................................................................................................................9
3.1. Available Data ...................................................................................................................................... 9
3.2. Catchment Hydrology .......................................................................................................................... 9
3.3. Catchment Hydraulics ....................................................................................................................... 10
3.1. Flood modelling results ..................................................................................................................... 12
3.1. Flood Hazard Overlay Code assessment ....................................................................................... 15
Stormwater Quality Management ...................................................................................................... 16
4.1. Construction Stormwater Management ........................................................................................... 16
4.1. Operational Stormwater Management ............................................................................................. 17
Conclusion ........................................................................................................................................ 18
Appendices
Appendix A
Proposed Concept Plans
Appendix B
DRAINS Modelling Results
Appendix C
TUFLOW Modelling Flood Maps
Appendix D
Ecosol Litter Basket Technical Specification
Appendix E
Bioretention Garden Maintenance Checklist
Project number 20220089
File 20220089 Jirrima Cr SWMP.docx, Revision 0 2023-05-09
recorconsulting.com
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.