Original source · versioned page text
Swmp
Rational Method Calculations
Job Number 2308 IFD NOOSA NEW IFD
Address 2 Bottlebrush Ave, Noosa Heads By JL
Existing Case Proposed Development Case
Catchment Details Catchment Details
Area 0.05464 ha Area 0.05464 ha
fi 0.79 fi 0.73
C10 0.858 C10 0.846
I10 74.2 mm/hr I10 74.2 mm/hr
Standard Inlet Time Standard Inlet Time
Time 5 mins Time 5 mins
Peak Discharge Calculations
Existing Case Proposed Development Case
Design
Frequency
Storm Area (ha) Cy Iy (mm/h) Qy (m3/s) Area (ha) Cy Iy (mm/h) Qy (m3/s)
Factor (Fy)
(AEP)
63% 1 0.05464 0.80 0.6864 125 0.013 0.05464 0.6768 125 0.013
39% 2 0.05464 0.85 0.7293 151 0.017 0.05464 0.7191 151 0.016
18% 5 0.05464 0.95 0.8151 188 0.023 0.05464 0.8037 188 0.023
10% 10 0.05464 1.00 0.858 226 0.029 0.05464 0.846 226 0.029
5% 20 0.05464 1.05 0.9009 258 0.035 0.05464 0.8883 258 0.035
2% 50 0.05464 1.15 0.9867 301 0.045 0.05464 0.9729 301 0.044
1% 100 0.05464 1.20 1 334 0.051 0.05464 1 334 0.051
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.