Original source · versioned page text
Helitak MCU App - Planning Report
The site is affected by the Flood Hazard Overlay and the whole site is known to flood. In this regard, all hazardous chemicals and operational tools will be stored above the defined flood level which is 1.5m above the surrounding ground level. A flood emergency management plan is provided which provides a detailed plan in the event of flood. A flood warning system can be implemented to reduce the risk to people or property from flooding. The office building is on posts and sits above the ground level. Effluent disposal has been constructed and the land application area is located within the access handle, above the flood extent. The building near Lake Macdonald Drive will be used for the company CEO and family to reside in and the surrounding area used for an emergency evacuation area, being above the 1% AEP. Noise is contained with the existing shed and faces to the west, away from any of the rural residential lots. It is extremely important to note the fire fighting tanks are not made from steel but from vacuum moulded carbon fibre. There is a very limited use of noise generating tools for this process. RG Strategic Town Planning Report – Material Change of Use 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.