DTMR Conditions for Prescribed tidal works - OPW11/0301
6. You or your agent must supply, install and maintain any navigation lights, buoys, marks or signs
the Harbour Master considers necessary. Any lights, buoys, marks and signs must accord with
Maritime Safety Queensland's requirements.
7. You must adequately light the structure. The contractor must position all lighting so it does not
cause a risk to the safe navigation of other vessels. Any freestanding piles must have retro-
reflective tape fitted.
8. You, or your agent, must remove any obstructions and debris encountered during construction,
and dispose of them, as the Harbour Master requires.
9. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
10. Any ships using this facility must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
11. The contractor must complete construction within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
A copy of this letter has been sent to the assessment manager.
Yours sincerely
/ Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DTMR Conditions for Prescribed tidal works - OPW11/0301Related documentApplication case desk ↗
About this file
- File size
- 797 KB (small file)
- File type
No other editions are linked here.