Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049

Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.

of 146

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa Spit Coastal Protection Environmental Assessment                                                                                                     B-13
State Codes


 Performance outcomes                                    Acceptable outcomes                            Code compliance
 PO2 Only those aspects of a development that            No acceptable outcome is prescribed.           Complies - Dredging works is necessarily tidal works and
 have a functional requirement to be located on                                                         cannot be located elsewhere. The full extent of
 tidal land create the requirement to remove,                                                           disturbance is descibed in Sections 6 and 7 of the main
 destroy or damage marine plants. Ancillary                                                             assessment report.
 elements (for example: car and trailer parks, rest
 rooms, offices) occur outside of tidal land.

 Note: Tidal land within the development site
 should be accurately identified on plans provided
 with the application, together with the location of
 highest astronomical tide, mean high water
 spring and mean low water spring tide heights.

 The extent, location, species and condition of
 marine plants that are proposed for removal,
 damage or destruction and retained have been
 clearly and accurately identified and mapped to
 enable risks and impacts to be properly
 assessed.
 PO3 Development impacting marine plants:                No acceptable outcome is prescribed.           Complies - Dredging is to provide improved amenity of
                                                                                                        Dog Beach while maintaining navigation.
     1. directly abuts land that has full riparian
        access rights; or
     2. provides a public facility.
 Note: Further guidance on rights in context of
 fisheries resources and fish habitats is provided
 in the operational policy provisions of
 Management and protection of marine plants
 and other tidal fish habitats (FHMOP 001),
 Department of Primary Industries and Fisheries,
 2007.

 The provision of owners consent to lodge the
 development application does not confer rights.




 G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental Assessment.docx

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.