Noosa Spit Coastal Protection Environmental Assessment B-17
State Codes
Performance outcomes Acceptable outcomes Code compliance
PO8 Works are undertaken to encourage fish No acceptable outcome is prescribed. NA
habitats and fisheries resource values to
naturally regenerate.
Note: Substitution of fish habitats is not
supported.
A condition of approval for any marine plant
restoration is likely to require a post-works
monitoring and maintenance program
appropriate for the scale of the restoration works.
PO9 Development likely to cause drainage or No acceptable outcome is prescribed. Dredging will only be undertaken to approximately -3m
disturbance to acid sulfate soils, prevents the AHD; previous testing has identified that acidic material is
release of contaminants and impacts on fisheries unlikely above this level. Additionally, regular testing of
resources and fish habitats. dredge material will be undertaken and material avoided
Note: Management of acid sulfate soil is where acidic material is present (i.e. material taken from
consistent with the current Queensland acid another location).
sulfate soil technical manual: Soil Management
Guidelines v4.0, Department of Science,
Information Technology, Innovation and the Arts,
2014
PO10 Tidal and freshwater inundation and For bridges: Beach nourishment will be below MHWS, and is not
drainage patterns, extent and timing are expected to prevent or change existing drainage to
maintained or restored such that ecological AO10.1 Bridges are designed with abutments marine plants present at the Spit (most inundation occurs
processes continue and associated fish habitat above the highest astronomical tide. from the south – from Noosa Sound, rather than from
values and condition are maintained. AND Noosa River).
For water, sewer or stormwater infrastructure:
AO10.2 Infrastructure is placed below the
existing natural substrate surface level, and
natural substrate, surface levels and habitat
condition and values are reinstated.
For any other development, no acceptable
outcome is prescribed.
G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdfRelated documentApplication case desk ↗
L.A10342.001.cover letter_lowres.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.