Skip to the record
For the highest quality transcripts.

Council archive · source document

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049

Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.

of 146

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa Spit Coastal Protection Environmental Assessment                                                                                                           B-22
State Codes


 Performance outcomes                                    Acceptable outcomes                                  Code compliance
 Note: For further guidance refer to Restoration of
 fish habitats: Fisheries guidelines for marine
 areas (FHG 002), Department of Primary
 Industries, 1998.

 Restoration works authorised through an
 endorsed restoration plan under the code for
 self- assessable development MP06 – Minor
 impact works in a declared fish habitat area or
 involving the removal, destruction or damage of
 marine plants, Department of Agriculture,
 Fisheries and Forestry, 2013, do not require a
 development permit.
 PO30 Marine plants to be used for revegetation          PO30.1 Marine plants used in restoration works       Complies – any restoration works will source vegetation
 purposes have local provenance.                         are collected within a 100 kilometre radius of the   from local areas (no restoration works planned at
                                                         site.                                                present).
 Matters of state environmental significance
 PO31 Development:                                       No acceptable outcome is prescribed.                 Complies – design minimises significant impacts on
                                                                                                              MSES.
 1. avoids impacts on matters of state
    environmental significance; or
 2. minimises and mitigates impacts on matters
    of state environmental significance after
    demonstrating avoidance is not reasonably
    possible; and
 3. provides an offset if, after demonstrating all
    reasonable avoidance, minimisation and
    mitigation measures are undertaken, the
    development results in an acceptable
    significant residual impact on a matter of
    state environmental significance.


 Statutory note: For Brisbane core port land, an
 offset may only be applied to development on


 G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental Assessment.docx

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.