Skip to the record
For the highest quality transcripts.

Council archive · source document

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049

Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.

of 146

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Marine Plant Assessment Dogs Beach, Noosa Spit Recreation Reserve                                             12
 Discussion




4.2.1.2 Vegetation and Substrate Disturbance
        Vegetation clearing limits should be detailed in site drawings and pegged out on site prior to
        construction. This should include locations of vegetation protection zones, side-tracks and, if
        required, locations for the stockpiling of site materials. No activities should occur within the
        vegetation protection zones. Techniques for substrate handling and storage should be detailed in a
        Construction Management Plan.

4.2.1.3 Restoration
        Natural recruitment is the preferred and most cost-effective method of revegetating zones. On
        completion of construction, substrate should be reprofiled where feasible to create conditions suitable
        for natural recruitment of the dominant mangrove and saltmarsh species.

4.2.1.4 Signage and Access
        Interpretive signage should be installed at the location of works to inform the public of construction
        and to discourage access during restoration.

4.2.1.5 Maintenance and Monitoring
        Maintenance and monitoring will be required to enhance restoration following construction. Regular
        monitoring should be undertaken to assess the following:

        • Restoration progress, assessment of substrate profile and marine plant recruitment; and

        • Identify site management issues, such as low natural recruitment and weed invasion.

        Site record sheets and permanent photo monitoring points should be used for recording and
        monitoring restoration progress. Depending on the level of site disturbance, the monitoring schedule
        may consist of weekly site visits for the first month, fortnightly visits for months 2-4, and monthly visits
        thereafter.




 G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\R.A10342.001.00.marine plants.docx

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.