NOTE:

 

DEPENDING ON GROUND CONDITIONS AND _ IF
REACTIVE SOIL IS FOUND ALL PENETRATIONS,
VERTICAL AND HORIZONTAL SHALL BE

DRAWING SCHEDULE

 

PROVIDED WITH SWIVEL JOINTS AND
EXPANSION JOINTS. ALL SUBSURFACE DRAINS

OPERATIONAL

WORKS

 

 

REQUIRE EXPANSION JOINTS AT 10m SPACING.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3105-1 COVER SHEET
STREET ADDRESS:
3105-2 STORMWATER DRAINAGE AND MANAGEMENT PLAN
5 1 CORSAIR CRESCENT 3105-3 EROSION AND SEDIMENT CONTROL PLAN (ESC)
D 3105-4 ESC NOTES
SUNRISE BEACH
REAL PROPERTY DESCRIPTION:
CLIENT NAME: obs ,
ie h <t
pgyoxvyuud
CONNECTIVITY P/L weer 3s
x ul 2 a =
g
u
os
oe
@)
' | a > +
| \ | | | | \ Cc
= ? \ | | | | | | | | oD)
= | ! | | | rT | | U
Ex ” | | by! )
ee \ | | | | | SI on]
mi iio Ee | | | i ;F CU
° = = 8 C
Oo < a a | | | | | | | | 2
A os) pmo | ! , | 1 | ° C)
”n por s
= 5 por | | | | &
5 bor g
= Eat sl | | § &
oO a 2 | i 7
PROPOSED DUPLEX OQ]. ae | | Ay S
5 S pose Ss | | | |
< aaa 2. : f 1 ; NY
Soc 2,
Z a 5 | I | | | ¢
m oO pee 5 ' / / ©
a wD Lee = ! I |
x m a 8 | | i CO
g Zz Soest 2 C)
e i i
q 7 ae E weme id = J
g So 8 lo o o @
D a pisos 3 N N “ “ “
a <
a Ss Poo ‘ =
mn Poors S 74
a w
Sores 9
A G >
Bee eee c Og
D> T
SoS Site 698 m?
SITE PLAN & EXISITNG SERVICES Roof 256. me
Driveway 95 m?
LOCALITY MAP Landscape 257 m?
SCALE NTIS. New impervious 351 m?
CATCHMENT AREAS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date
aw Ron Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE
Existing Water tos.  Cleanoat to surface 2. DONOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O.
s Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK
Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR.
HD Existing House drain cs Cleaners. sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES.
Sanitary Drainage Se Gold Woter  anel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER
Grey Water Bev Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20, ONE SIZE LARGER THAN SHOWN.
vent ripe Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED.
_—--—-- — fot water” Elev Dge zvevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN
. . 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY.
—_— —_—_ — We | I
ne ~ orm Water Drainage re Fre ayareng 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD
cot Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale
FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION
Rain Woter Ri fu Fixture units or t REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval
ain Water Riser GP Gully pt 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval x 1-05-16
Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender
Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction
Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. hs Constructed
Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT
@) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS
@) S) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS 8 FRA NES Os TO VEHICULAR TRAFFIC TO BE 0535 CAST IRON. MEDIUM DUTY UNO
®) ° Educt Vent IL Invert Level - No.
Induct Vent io Inspection opening SANITARY DRAINAGE 2. COVERS IN GRASSED OR CONC. AREAS TO BE 2535 CAST IRON, CONCRETE INFILL LIGHT DUTY. E
. ios nspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. .
(8) © Hot Water Riser Kec yore Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. Hyd raulic ya
TN? sCFire Dropper NRV Non return valve 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE.
Fire Riser PB Path box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE “COESPRENE" OR HDPE. Va
PLV Pressure limiting valve 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. . ; tng MigAust RPEQ No 7023
Vv Valve PO Planter outiet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH'NITRILE” RUBBER RINGS. GRATINGS . . contact: Reinhold Koenning Michus °
he Hose Cock Ree Real propery aoe, hn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. See OS SO COROT NON TER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551
RPZD Reduce Pressure Zone device BRASS CAPS, SEALED AND SCREWED. . email: [email protected]
———-_ een Eccentric Enlarger RWO Rai i tlet 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333
~--ce-— en Enlarcer RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS CLIENT :
g 8p Sanitary Drainage STORMWATER DRAINAGE CONNECTIVITY P/L
urrace Keve 1. UNDERGROUND PIPEWORK SHALL BE 2100 PVC CLASS SW MIN GRADE 1:100 U.N.O.
. S Si OT
ORG Overflow Relief Gully s/t Sate Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE
Wat Si) Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 1. ALL HYDRANT PIPEWORK TO BE IN ACCORDANCE WITH AS2419-2005 CLAUSE 6.8. DESIGNER:
[]o we Water td Tropped Tundish REQUIRED. 2. ALL HYDRANT PIPEWORK TO BE IDENTIFIED IN ACCORDANCE WITH AS1345. DES CRAWFORD
TC Test gate 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. y J
sk Sink td Tundish et , 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /proJEcT: 31 CORSAIR CRESCENT \
f ) rench grate transverse bar 51. TO BE RESPONSIBILITY OF BODY CORPORATE HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL. SUNRISE BEACH
LT Laundry Tub TG(1) Trench grate longitudinal bar 5 : 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP
y TMV. Thermostatic mixing valve 5.2. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP'S AND OTHER FILTERS. . , DUPLEX
ol wm — Washing V Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS.
Machine u/g Underground 5.4, TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS: 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE:
u/s Under slab ; 7 A FIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER
FWG Floor Waste Gull
6 y Ont Fed oth ‘AS TO MANUFACTURES SPECIFICATION
U.n.0. nless noted otherwise : IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING.
; ws Water supply MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON
os Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE J
5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY, :
CC) 8th Both Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: = <@100 Ohe a conor MOVE Soo uns IN GROUND. COVER SHEET )
SS mes ~ eee “210 FRGLTELG/ PE B COPPER SERS
La «= ME_—s Water Meter CS Cleaners Sk 9. DONOT USE GALVANISED FOR UNDERGROUND PIPE WORK.
Design Ae. Checked (Ch Dote 01-03-16 Dwg. No. AMD,
SCALE: 1 : 200 ON At UNO, 1 Of 4 3105-1 J

 

 

 

 

 

 

RPD:— LOT 219 RP 135364

 

 
Full text of the other 7 pages

Page 2

 

 

/

1.22.050-|

@225uPVC TO EXISTING cave

POINT OF DISCHARGE:
IL22.650 STORMWATER MANHOLE
CORE DRILL EXISTING
MANHOLE AND SEAL WITH
NON SHRINK GROUT.

NOTE:
ALL EXISTING SERVICES HAVE BEEN PLOTTED
FROM AXIS SURVEY DRAWINGS.

 

9150 FROM ROOF CATCHMENT.
: Lo PROOF SCREENING
OO)

 

 

 

 

 

 

 

PROVIDE 450sq FIELD

INLET WITH GRATED LID

SL23.950
1L22.950

 

Q
Zz
<<
_t

PROVIDE 4506q FIELD ———— |
INLET WITH (GRATED LID
SL23.950 <<
1L23.150 4

 

@25 SLOW LEAK FOR PEAK
FLOW MITIGATION. DISCHARGE
TO OVERFLOW PIPE.

NOTE:

THE INSTALLATION OF THE
SLOW LEAK NEEDS TO BE A
FIXED, SEALED PIPE. NO
VALVE IS PERMITTED!

 

y z
D
‘S
2,500 LITRE RETENTION VOLUME—————= .
oo
£
=
D
3
2,500 LITRE HARVESTING VOLUME—————} ”
2
7 7S a = 5 + y 7a

< a 44 ¢ “ «

a, x « i wee as : <a’

 

 

 

 

 

 

150 OVERFLOW TO
STORMWATER
DRAINAGE SYSTEM

Approximate Sewer Line Location

“

“a

 

| Approx,

 

    
  
     
   
   
  

Approx,

Oo

D gy

et wy
pay awn
VoeUZ= 2s
oe’ str CO =
Kx & Cf =
Lj ©

NOTE:

A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.

FOR ALL DETAILS OF ROOF DESIGN,
GUTTERS AND DOWNPIPES REFER TO BA

 
       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 
  
 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9150 $150 SL28.100
DESIGN DRAWINGS 1L27.100
TIMBER SLEEPER RETAINING WALL garden
BUILDER TO DETERMINE EXTENT
OF RETAINING WALL, ON SITE |
| path |
Lv RETAINING WALL |
— 4 6150 8.100
ct ry GP3
| cp2 bed. 00
ed. 3 2s
| terrace & FFL28: -
| we
5 &s PROVIDE COMBINED 3
bed. 2 e° STORMWATER F ‘4
ci 82 RETENTION/HARVESTING LY
| 4 DS TANK AS PER
| 4 « DETAILED DESIGN
1800mm HIGH CEMENT
RENDERED BLOCK FENCE ts ee
GP1 ci
> ya ez z we
) 0 ~ 25 =
bed. 2 7 sate PO 25 ”\prowoe comainen 7
| (te By STORMWATER
| terrace f } Ren AORRVESTING
/ bed. 3 —— “AS PER
| RL.25.3 .3 5 bath DETAILED DESIGN
5 fy RL.25.306
| c S ior SLAB
utility roqm
) 1-9 150
se ‘i GP4
| hal I ( pool \ La 8.100
| \pump/ | fw Fri2! .
L_ TT
J pool é timber reta |
garden wal | RETAINI |
—_L 1 Nw
al ath ror? | path |
4150. s 26.425 }
imber retaining “) | |
S RIMUM OF 80% OF THE ROOF PROVIDE 450sq FIELD
/ CATCHMENT AREA SHALL BE DIRECTED TO INLET WITH HEAVY DUTY,
proximate. House THE TANK. BETTER IS IF 100% CAN BE cuss D GRATE
nnection Plotted DIRECTED TO THE TANK. iL27.100
Fi Record FOR ALL DETAILS OF ROOF DESIGN, :
rom eCoras GUTTERS AND DOWNPIPES REFER TO BA
Invert Level ee DESIGN DRAWINGS ee
23.49 m [NN 777)
0.69 deep \ 4
12 ——— NO RETENTION
oO
a WITH RETENTION
D 3 Zz ~
& 7
E =
5
= 4 ~N TOTAL PROPOSED TANK VOLUME:
8 Y — TANK FOR RETENTION:
ira
TANK FOR HARVESTING:
0 T T T TT
2 4 6 8 10 12 14 16 18 RUNOFF & DETENTION CALCULATIONS:
TIME (MINS.) MAXIMUM. EVENT:
TIME OF CONCENTRATION:
INTENSITY:
STORMWATER HYDROGRAPH THROUGH THEORETICAL SINGLE SITE TANK SITE AREA:
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK IMPERVIOUS AREA:
CALCULATIONS FOR TOTAL SITE USING PRE DEVELOPMENT PEAK RUNOFF:
ACCUMULATED CATCHMENT AREAS AND PEAK RUNOFF POST DEVELOPMENT:
ONE SINGLE TANK RETENTION VOLUME REQUIRED:
RETENTION VOLUME PROVIDED:
REDUCTION REQUIRED:
REDUCTION PROVIDED:
a 6 ——— NO RETENTION
oO
ud
WITH RETENTION
gQ YL ™~
4 4
ud
E NS
2
52 =
Z Zz =
—<—
0 pO
T T T T T T T TT T
2 4 6 8 10 12 14 16 18
TIME (MINS.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STORMWATER HYDROGRAPH THROUGH PROPOSED INDIVIDUAL TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK

CALCULATIONS FOR "ONE HALF” PER

UNIT USING INDIVIDUAL CATCHMENT
AREAS AND INDIVIDUAL TANK
ASSEMBLEYS.

@25 SLOW LEAK REQUIRED.

 

 

5,000 LITRES
5,000 LITRES

Q100

Smin
326mm/hr
608sqm
351sqm

48L/s
52L/s (NO RETENTION)

2,640 LITRE
5,000 LITRE

4L/s
8L/s

CEN

LC ReS

in

Corsa

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

For Construction

As Constructed

‘Amd Description Date
Issue Notes Date

For Development Approval

For Building Approval x 01-03-16

For Tender

 

E Hydraulic 3:

 

\-

PO Box 181

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

CLIENT :
CONNECTIVITY P/L

DESIGNER:
iS DES CRAWFORD

contact: Reinhold Koenning MiEAust RPEQ No 7023

 

(PRouect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX

DRAWING TITLE:

STORMWATER
DRAINAGE AND
MANAGEMENT PLAN

iY

Dwg, No.

SCALE: 1: 100 3105-2
RPD:— LOT 219 RP 135364

Design HH. Checked

Cu

ON A1 U.N.O.

Date 01-03-16
2 of 4

 

A

AMD.

J

 

 

Page 3

 

 

TEMPORARY
SEDIMENT CONTROL
FENCE REFER DETAIL

 

 

LY

 

 

 

 

 

 

 

 

 

 

 

F42 Fabric to AS1304

Desturbed area | i,
Geotextile fabric

 

 

 

 

o;
1, Sox,
40, to,

 

Posts or steel pickets
driven 600mm into ground

 

  

100min vertical overlap of fabric

600max

 
 

 

Undisturbed area

Backfill Fix to top of stake with
shadecloth fastener or
tie to steel picket

200

  

Geotextile Fabric ry
and F42 |
| 50x50 HW stake or steel
| picket 1200min long
Overflow |
a
Backfill

 

PERIMETER SEDIMENT FENCE DETAIL

 

L)

Lt LI Lt ——! |
| ; |
| | | |
|
!
|
j |
O g ————
ow a Ee)
oS ‘0 00 ee
N N

  
  
  

Geotextile fabric,
Bidum U34 or similar.

Runoff from pad
directed to sediment
trap

TEMPORARY CONSTRUCTION ENTRY/EXIT
SEDIMENT TRAP

 

   

t

Corsair Cres

Berm (300mm min height)

TEMPORARY CONSTRUCTION
ENTRY/EXIT SEDIMENT TRAP.
REFER DETAIL.

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

Amd Description Date

 

Issue Notes Date

For Development Approval
For Building Approval
For Tender

x 01-03-16

For Construction

As Constructed

E Hydraulic 3:

\-
contact: Reinhold Koenning MiEAust RPEQ No 7023

PO Box 181

Moffat Beach, QLD, 4551

email: [email protected]

PH: (07) 5491 4333

CLIENT :

 

CONNECTIVITY P/L

DESIGNER:
iS DES CRAWFORD

(PRosect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX

DRAWING TITLE:

A

STORMWATER
DRAINAGE AND )
MANAGEMENT PLAN
Design He. Checked (Ch. Date 01-03-16 Dwg. No. AMD.
SCALE: 1 : 100 ON At UNO, 3 Of 4 3105-3 J

 

 

RPD:— LOT 219 RP 135364

 

 

Page 4

 

 

an

SEDIMENT & EROSION CONTROL NOTES

 

Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout
accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of
writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from
also be installed as necessary during construction. base of boxing during construction.

All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be
stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by
otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures
required at this point prior to the works proceeding. shall be removed at the completion of construction.

Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the
earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction.

possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to
Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site.

mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and

practical time.

Turf shall be laid behind kerb and channel for full verge width.

construction period, to any waterway, or stormwater drain or drainage line
leading to a waterway or area of native vegetation, unless the level of total

In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre.

follow the following site protection principles:
- Install turf in permanent open drain;

14 An effective water quality self-monitoring program, including at least one
representative measurement of the total suspended solids quality of any flow

- Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be

- Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the
concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance

along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being
with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to

All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance.

seeding, hydromulching or mulching.
All batters 1 on 4 and steeper shall be tined to a depth of 200mm in

15. Sufficient stockpiles of mulch and/or other similar required erosion and
sediment control materials and stores must be maintained on site at all times

accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance.
matting installed over the mulch. all other disturbed areas shall be covered

with hydromulch.

LEGEND

 

 

agi
e FWG
a GP1
oa

Existing storm water
Storm Water Drainage

Agi Drain

Floor Waste
gully

Gully Pit

Sediment Fence

-—_—-o Boundary

@ Diameter

C.0.8. Cleanout to surface

Een Eccentric Enlarger

FFL Finished floor level

GP. Gully pit

GMH Gully Man Hole

IC Inspection Chamber

IL Invert Level

K&C Kerb & Channel

MH Manhole

PO Planter outlet

RPB Real Property Boundary
RPD Real Property description
RWO Rain water outlet

RWH Rain water head

SL Surface Level

Sq Square

SWD Storm water drain

Tat Trench grate transverse bar
TG(I) Trench grate longitudinal bar
u/g Underground

u/s Under slab

u.n.o. Unless noted otherwise

 

 

 

 

 

 

 

 

Task ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY
PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS
AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
OF SEDIMENT FROM THE SITE.
MANAGEMENT e INSTALL THE CONTROL DEVICES AND ¢ COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER)
STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING.
DESCRIBED ON PLANS. e CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN.
STAGE AREA PRESENTLY UNDER e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE
CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT
e ALL MUD AND SILT DEPOSITED ON THE OFF-SITE.
ADJACENT ROADWAY SHALL BE REMOVED e PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE
e¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE:
AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN
BEEN STABALIZED. — TEMPORARY SILT FENCE
e¢ WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS
CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS.
SHALL BE ALLOWED TO DRY THEN e PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
BEEN ACHIEVED.
MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN
TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE.
CORRECTLY INSTALLED AND ADEQUATELY
MAINTAINED, IN PARTICULAR PRIOR TO
FORECAST PERIODS OF RAIN OR STORMS.
CORRECTIVE e¢ EMPTY AND REPAIR TRAPS REGULARLY.
ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
e PLACE ADDITIONAL CONTROL DEVICES
WHERE EXISTING INSTALLATIONS ARE
INADEQUATE.
REPORTING WEEKLY REPORTS BY THE PRINCIPAL
CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN
AND THE PERFORMANCE OF CONTROL
MEASURES.

 

 

 

SEDIMENT & EROSION MANAGMENT PLAN

 

 

 

 

 

 

 

 

   

 

 

 

 

 

Prior to the commencment of any construction activities the following measures
shall be incorporated:
SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel
e Set up action plans as a precaution in case of disturbances occuring
© OBJECTIVE: especially after an unexpected strong rainfall event
To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
temporary structures.
¢ LEGISLATION: [Amd Description Date
Environment Protection Act 1994
Environmental Protection Water Policy 1997
The Integrated Planning Act 1997
e RESPONSIBILITY:
The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:
*the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of NOTES FOR STOcKeLING en THE CONTRACTOR SHALL PROVIDE A
these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
**the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
wend disposed of _ . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE.
installation and maintenance of the sediment control fences all around the perimeter as shown in plan ADVICE:
*“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event ° - LOCATE STOCK PILES ON LEVEL GROUND AWAY
*“control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date
and earthmoving vehicles OVERLAND FLOW. For Development Approval
Tsupervise other members of staff and lead by example | —- . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x 01-03-16
*“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL
butts and also building material cut off's. RUNOFF. For Tender
**“ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction
blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED
***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE As Constructed
measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS
TO AVOID RUNOFF PASSING THROUGH.
e ACTIONS:
In case of major rainfall events the following action plan shall be followed and responsibly looked after by the
CONTRACTOR: .
CUT—OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR nat
raulic =
***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. y V
be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF.
“check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V—
bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Rein ho | d Koe nn i n MiEAust RPEQ No 7023
**clean out sedimentation material as soon as the moisture content allows it. FLOW ~ BO Box 181 g
“check the receiving pit and improve the barriers if required. KG SS Moffat B h
wee . RRRRRRRRR A < . joffa each, QLD, 4551
REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! RRR, Via VOR 7 email: [email protected]
SES SWIG RINSE PH: (07) 5491 4333
Y CLIENT :
SEDIMENT FENCE AS SPECIFIED ALONG CONTUR
(EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L
DESIGNER:
STOCKPILES \ DES CRAWFORD J
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX
MOUNDS (2m max. HEIGHT.)
DRAWING TITLE:
STORMWATER J
DRAINAGE AND )
MANAGEMENT PLAN
Design Ae. Checked (Ch Dote 01-03-16 Dwg. No. AMD.
SCALE: 1 : 100 ON At UNO. 4 Of 4 3105-4 J
RPD:— LOT 219 RP 135364

  

 

 

 

 

 

 

 

 

 

 

 

Page 5

 

 

 

Dive &

 

STREET ADDRESS:

31

SUNRISE BEACH

REAL PROPERTY DESCRIPTION:

LOT 219 RP

CLIENT NAME:

CONNECTIVITY P/L

1593564

 

|

 

CORSAIR CRESCENT

 

 

PROPOSED DUPLEX

 

asia AGYSHLAN

INO YIVSYHOO
AVM MO1 GIAVG

Faq LNaIO

NOTE:

 

DEPENDING ON GROUND CONDITIONS AND _ IF
REACTIVE SOIL IS FOUND ALL PENETRATIONS,
VERTICAL AND HORIZONTAL SHALL BE

DRAWING SCHEDULE

 

PROVIDED WITH SWIVEL JOINTS AND
EXPANSION JOINTS. ALL SUBSURFACE DRAINS

OPERATIONAL

WORKS

 

 

REQUIRE EXPANSION JOINTS AT 10m SPACING.

 

STORMWATER DRAINAGE AND MANAGEMENT PLAN

 

EROSION AND SEDIMENT CONTROL PLAN (ESC)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25.5,
26.0
26.5 —
27.0
27.5

3105-1 COVER SHEET
3105-2
3105-3
3105-4 ESC NOTES
Phe 4
Byxuuc
NO YE 5
S Soe
«
u
ot
nw
(e)
(@)
— yy PP
| | | | —
1 i | | | | | wy
' U
J ] | | fy! VW)
| | PON : wu
| | T ®
a | | | | | | | g <
' ! | ° C)
po | vi bo 3
<2 | I | | 8 Cc
8 | Jt <
8 | ff ‘ o
gy ; | WY)
Bl | | ~
=
a) ti i O
BE) = J OO)
3 oo
a N
<

 

douse

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site 698 =m?
SITE PLAN & EXISITNG SERVICES Roof 256. me
Driveway 95 m?
LOCALITY MAP Landscape 257m?
SCALE NTIS. New impervious 351 m?
CATCHMENT AREAS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date
Ron Water 3 Diameter 1, DONOT SCALE FROM THESE DRAWINGS. 1, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE
Existing Water tos.  Cleanoat to surface 2. DONOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O.
S Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK
Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR.
HD Existing House drain cs Cleaners. sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES.
Sanitary Drainage Se Gold Woter  anel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER
—sw— Grey Water Bey Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20, ONE SIZE LARGER THAN SHOWN.
TTT fant oe Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED.
_ — fet Water Elev Dge evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN
. . 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY.
We I I
_ eee ~ orm Water Drainage re Fre ayareng 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD
Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale
FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION
; ; FU Fixture units REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval
(*" ° Rain Water Riser GIT Grease Interceptor trap Fe ildi A | Xx (01-03-16
' ep Gully pit 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. or Building Approva
Cs) ° Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender
Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction
Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. As Constructed
Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT
@) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS
@) S) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS 8 FRA NES Os TO VEHICULAR TRAFFIC TO BE 0535 CAST IRON. MEDIUM DUTY UNO
@)- Educt Vent IL Invert Level . - > NU.
Induet Vent io Inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 2535 CAST IRON, CONCRETE INFILL LIGHT DUTY.
. ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. .
(8) © Hot Water Riser Kec yore Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. Hyd raulic ya
(3) ° Fire Dropper NRV Non return valve 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE.
Fire Riser PB Path box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE “COESPRENE" OR HDPE. Va
PO. Planter outlet S TRADE WASTE PPEWORK 70 Ol SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH'"NITRILE” RUBBER RINGS. GRATINGS contact: Reinhold Koenning MicAust RPEQ No 7025
se Vv Vat . , . ee " " PO Box 181
he Hose Cock Ree Real propery aoe, hn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. See OS SO COROT NON TER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551
i BRASS CAPS, SEALED AND SCREWED. : email: [email protected]
een Eccentric Enlarger RWO. Rein water’ outlet Zone device 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333
RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS :
en Enlarger SD Sanitary Drainage STORMWATER DRAINAGE CoENT
oO / et Saoce ‘evel 1. UNDERGROUND PIPEWORK SHALL BE 2100 PVC CLASS SW MIN GRADE 1:00 U.N.O. CONNECTIVITY P/L
ORG Overflow Relief Gully s/t Safe Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE
I) Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 1, ALL HYDRANT PIPEWORK TO BE IN ACCORDANCE WITH AS2419-2005 CLAUSE 6.8. DESIGNER:
[]o we Water td Tropped Tundish REQUIRED. 2. ALL HYDRANT PIPEWORK TO BE IDENTIFIED IN ACCORDANCE WITH AS1345. DES CRAWFORD
1G Test gate 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. Ne J
sk Sink td Tundish 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /proJEcT: 31 CORSAIR CRESCENT \
Tat Trench grate transverse bar HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL
LT Laundry Tub rei, areneh, grate longitudinal bar FO ST ATL IN PLOW PIERO DEVISRe IKE 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP SUNRISE BEACH
y TMV. Thermostatic mixing valve 5.2. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP'S AND OTHER FILTERS. : , DUPLEX
ol wm — Washing Vv Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS.
Machine u/g Underground 5.4, TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS: 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE:
u/s Under slab A FIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER
6 FWG Floor Waste Gully Ont Ped otherwi -AS TO MANUFACTURES SPECIFICATION ,
Un.0. nless noted otherwise “MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING.
. Ss Water supply ,
os Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE J
5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY. AUTHORITY PUMP APPLIANCE HAS ACCESS.
CC) 8th Both Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: = <@100 Ohe a conor MOVE Soo uns IN GROUND. COVER SHEET )
SS mes ~ eee “210 FRGLTELG/ PE B COPPER SERS
La «= ME_—s Water Meter CS Cleaners Sk 9. DONOT USE GALVANISED FOR UNDERGROUND PIPE WORK.
Design | RK. | checked | Cro [Date 01-03-16 | Dwg, No. AMD.
SCALE: 1 : 200 on At uno.| 1 Of 4 3105-1 J

 

 

 

 

 

RPD:—

 

LOT 219 RP 135364

 

 

Page 6

 

 

@225uPVC TO EXISTING cave

POINT OF DISCHARGE:
IL22.650 STORMWATER MANHOLE
CORE DRILL EXISTING

MANHOLE AND SEAL WITH

NON SHRINK GROUT.

NOTE:
ALL EXISTING SERVICES HAVE BEEN
FROM AXIS SURVEY DRAWINGS.

PLOTTED

 

PROVIDE 450sq FIELD
INLET WITH GRATED LID \©@
SL23.950
1L22.950

/

1.22.050-”|

 

Q
Zz
<
_t

PROVIDE 4506q FIELD ———— |
INLET WITH (GRATED LID
SL23.950 <<
1L23.150 4

 

Approximate Sewer Line Location

 

App

| Approx,

 

9150 FROM ROOF CATCHMENT.
: Lo PROOF SCREENING
OO)

ay

25 SLOW LEAK FOR PEAK

 

FLOW MITIGATION. DISCHARGE
TO OVERFLOW PIPE.

 

 

 

THE INSTALLATION OF THE
SLOW LEAK NEEDS TO BE A
FIXED, SEALED PIPE. NO
VALVE IS PERMITTED!

 

 

 

 

 

 

=
D
3
2,500 LITRE RETENTION VOLUME—————=} .
3
£
NOTE:

=
Dp
3
2,500 LITRE HARVESTING VOLUME—————+} *
£

5 2 7 a 2 5 = = 7 4 4 «

. 4 44'4 ¢ « :

a, x . + “ea aa . oa, ot ‘a

 

 

 

—_———#150 OVERFLOW TO
STORMWATER
DRAINAGE SYSTEM

Oo

D gy

ct vy
pay auncd
NVoeUz= 2s
oY’ str Os
KX & © Ir
Lj ©

NOTE:

A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.

FOR ALL DETAILS OF ROOF DESIGN,

 
       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

   

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6150 GUTTERS AND DOWNPIPES REFER TO BA 9150. SL28.100
DESIGN DRAWINGS 1L27.100
" BOs Se a Boe
TIMBER SLEEPER RETAINING WALL garden
BUILDER TO DETERMINE EXTENT
OF RETAINING WALL, ON SITE |
path |
6150 \] RETAINING WALL |
ie_timber retain
wall l
I rere
25. Lie FFL a,
roy oe To? OF ifs @-# 150 ops 8.109
cl fy ape
utility roo ]
bed. 3 ° 200
terrace & Friz8 S
#150 NN
AL PROVIDE COMBINED x —_
10 B bed. 2 STORMWATER r ‘
ct f| RETENTION/HARVESTING Y
4 up || TANK AS PER <
; m 7 DETAILED DESIGN
1800mm HIGH CEMENT bs
RENDERED BLOCK FENCE } oo a ty ri28-500
oy
] a a
MM = ~
terrace bed. 2 PROVIDE COMBINED
: STORMWATER
#150 terrace RETENOR AMR veESTING
YO bed. 3 KAS PER
RL25.3 : DETAILED DESIGN ley
L150
oa ~~ a cP4
me Py ert
Z ht
|e ne!
pool é timber “| |
garden wal | RETAINI |
a x
al Gath roe? | path |
#150) 3 26.425 ||
i imber retaining iz | |

 

 

 

 

proximate. House
Plotted
From Records

NOTE:

A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.

FOR ALL DETAILS OF ROOF DESIGN,
GUTTERS AND DOWNPIPES REFER TO BA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rox, Invert Level ee DESIGN DRAWINGS
23.49 m KS*
0.69 deep
~ 12 ——— NO RETENTION
oO
a WITH RETENTION
gs L ~
E a XN
a ~
= 4
a 7 ~
0 T ! T T TT
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH THEORETICAL SINGLE SITE TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
CALCULATIONS FOR TOTAL SITE USING
ACCUMULATED CATCHMENT AREAS AND
ONE SINGLE TANK
~ 6 — —— NO RETENTION
oO
a WITH RETENTION
2 Z +
fe N
z 2 —
Z Z “N
pee
0 T I T TT
2 4 6 8 10 12 14 16 18
TIME. (MINS.)

STORMWATER HYDROGRAPH THROUGH PROPOSED INDIVIDUAL TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK

 

 

CALCULATIONS FOR "ONE HALF” PER

UNIT USING INDIVIDUAL CATCHMENT
AREAS AND INDIVIDUAL TANK
ASSEMBLEYS.

@25 SLOW LEAK REQUIRED.

  

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
SL28.100

1L27.100

777

4

TOTAL PROPOSED TANK VOLUME:
TANK FOR RETENTION:
TANK FOR HARVESTING:

RUNOFF & DETENTION CALCULATIONS:

MAXIMUM EVENT:

TIME OF CONCENTRATION:
INTENSITY:

SITE AREA:

IMPERVIOUS AREA:

PRE DEVELOPMENT PEAK RUNOFF:
PEAK RUNOFF POST DEVELOPMENT:

RETENTION VOLUME REQUIRED:
RETENTION VOLUME PROVIDED:

REDUCTION REQUIRED:

REDUCTION PROVIDED:

 

5,000 LITRES
5,000 LITRES

Q100

Smin
326mm/hr
608sqm
351sqm

48L/s
52L/s (NO RETENTION)

2,640 LITRE
5,000 LITRE

4L/s
8L/s

CEN

LC ReS

a

Corsa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED

FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date

Issue Notes Date

For Development Approval
For Building Approval x [01-03-16
For Tender
For Construction
As Constructed

 

 

 

 

E Hydraulic 3:

 

\-

PO Box 181

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

contact: Reinhold Koenning MiEAust RPEQ No 7023

N

 

CLIENT :
CONNECTIVITY P/L

 

DESIGNER:
iS DES CRAWFORD

 

(PRouect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX

A

 

DRAWING TITLE:

STORMWATER
DRAINAGE AND
MANAGEMENT PLAN

iY

 

 

Design RH, Checked | Cro [Date 01-03-16 | Dwg. No.

 

2 of 4

: 100 ON At U.N.O.

 

 

XY SCALE : 1

3105-2 J

AMD.

 

 

 

RPD:— LOT 219 RP 135364

 

 

Page 7

 

TEMPORARY
SEDIMENT CONTROL
FENCE REFER DETAIL

 

 

TT

 

 

 

 

 

 

 

 

F42 Fabric to AS1304

Desturbed area | i,
Geotextile fabric

L)

 

a
%

Un
&
OK:
Oy “pn
oN or

 

 

 

 

 

 

 

posts or steel pickets

 

driven 600mm into ground

Ne vertical overlap of fabric

Undisturbed area

 
 
 
  
  
 
  
 
 
  

ROR

     

on
SO
OO 50509)

   

X

CX
x
Se

 
  
  
  
  

KOS
RO
S

xe
x

 

R
xe
<
oxY
Xe

<

       
 

of

600max
x

 

t Backfill Fix to top of stake with
shadecloth fastener or

[ to steel picket

1]
|

Geotextile Fabric
and F42 oN

  

50x50 HW stake or steel
picket 1200min long

   

|

|
Overflow |
ox $3 4

Backfill

PERIMETER SEDIMENT FENCE DETAIL

i io am

i__! | LJ jl LJ |

| |

|

j |

| |
| | | | :
j |
| | ”
®
| hed
' 1 =
©
| ¥
| 0
Oo
= a ——
& a ig
© tO co co
N N

  
   
  
  

Berm (300mm min height)

Geotextile fabric, TZ
Bidum U34 or similar.

Runoff from pad
directed to sediment
trap

TEMPORARY CONSTRUCTION ENTRY/EXIT
SEDIMENT TRAP

TEMPORARY CONSTRUCTION
ENTRY/EXIT SEDIMENT TRAP.
REFER DETAIL.

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description Date
Notes Date
For Development Approval
For Building Approval x [01-03-16

 

For Tender

 

For Construction

 

As Constructed

 

 

 

 

E Hydraulic 3:

 

Reinhold Koenning MiEAust RPEQ No 7023

PO Box 181

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

 

CONNECTIVITY P/L

 

DES CRAWFORD

31 CORSAIR CRESCENT

SUNRISE BEACH
DUPLEX

DRAWING TITLE:

STORMWATER
DRAINAGE AND
MANAGEMENT PLAN

iY

A

 

Design| RK. | checked | Cro [Date 01-03-16

 

 

: 100 ON At U.N.O.

3 of 4

 

Dwg. No. AMD.

3105-3 J

 

 

 

LOT 219 RP 135364

 

 

Page 8

 

Oo

 

SEDIMENT & EROSION CONTROL NOTES

 

 

 

 

 

 

 

 

 

 

 

 

Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout
accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of TASK AES | FROSION & SEDIMENT CONTROL STORMWATER QUALITY
writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
also be installed as necessary during construction. base of boxing during construction. AND AT ALL "INES PREVENT THE TRANSPORT | AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be —_ eee
stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by Siratecy |” FOLLOW THE STABILZATON PRoceDURES | ALL CONTROL MEASURES. SHALL. BE IN. PLAGE. PRIOR TO COMMENCING SITE STRPPING. Yn
otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures . Pear THE ESTENT OF STRIPPING 40 THE . OND PROSE OID AS SHOWN STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
required at this point prior to the works proceeding. shall be removed at the completion of construction. CONSTRUCTION. * COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO S0 AS TO LIMIT THE POTENTIAL FOR IMPACT
Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the * ADJACENT ROADWAY SHALL. BE. REMOVED «PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction. «PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS. REQUIRED AND MAY INCLUDE: ne ROS ON CONTROL PLAN BUT MAY BE
possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to BEEN STABLE NTE SITE BAS 7 TEMPORARY, RETARDATION BASIN
Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site. * CONCRETING SHALL BE WHOLLY «IN AREAS WHERE_RUNOFF. TURBIDITY IS 10 BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and SHALL BE ALLOWED 10 DRY THEN. «PERMANENT CONTROL. MEASURES WILL BS IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
practical time. construction period, to any waterway, or stormwater drain or drainage line REMOVED FROM SITE. BAN ACHIEVED” BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
Turf shall be laid behind kerb and channel for full verge width. leading to a waterway or area of native vegetation, unless the level of total MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE. VISIBLE. IN
In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre. CORRECTLY INSTALLED AND ADEQUATELY SURFACE RONOFE TENING THE STE:
follow the following site protection principles: 14 Aneffective water quality self-monitoring program, including at least one FORECAST PERIODS OF RAIN OR STORMS.
- Install turf in permanent open drain; representative measurement of the total suspended solids quality of any flow
- Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be ACTIONS. + REPAIR OR REPLACE. DAMAGED CONTROL + REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
- Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the «PLAGE ADDITIONAL CONTROL. DEVICES * INSTALL ADDITIONAL SEDIMENTS. TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance INADEQUATE, NOTATIONS ARE
along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being
with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to REPORTING CONTRACTOR 10 THE CONSULTANT. DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance. AND THE PERFORMANCE OF CONTROL MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAEN

. . . noe . oo : : MEASURES.
seeding, hydromulching or mulching. 15. Sufficient stockpiles of mulch and/or other similar required erosion and
All batters 1 on 4 and steeper shall be tined to a depth of 200mm in sediment control materials and stores must be maintained on site at all times
accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance. SEDIMENT & EROSION MANAGMENT PLAN

 

matting installed over the mulch. all other disturbed areas shall be covered
with hydromulch.

 

Prior to the commencment of any construction activities the following measures
shall be incorporated:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel
e Set up action plans as a precaution in case of disturbances occuring
© OBJECTIVE: especially after an unexpected strong rainfall event
To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
temporary structures.
LEGEND * LEGISLATION: (Amd Description Date
a Environment Protection Act 1994
Existing storm water Environmental Protection Water Policy 1997
The Integrated Planning Act 1997
Storm Water Drainage
e RESPONSIBILITY:
Agi Drain The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:
Floor Waste .
° FWG gully ***the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of BOOS TS SONS SbUGtOn THE CONTRACTOR SHALL PROVIDE A
—- these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
[| GP1 Gully Pit nb depoaedet down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
***installation and maintenance of the sediment control fences all around the perimeter as shown in plan aioe VISIBLEY PLACED IN THE SITE OFFICE.
—1-—_1+———_. Sediment Fence **“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event . - LOCATE STOCK PILES ON LEVEL GROUND AWAY
*“*control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date
a Boundary eid earthmoving vehicles OVERLAND FLOW. For Development Approval
. Supervise other members of staff and lead by example / oo . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x (01-03-16
@ Diameter **“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL
C.0.8. Cleanout to surface butts and also building material cut off's. RUNOEF. For Tender
Een Eccentric Enlarger ***ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction
inisned Tloor level blocking drain paths and kept neat and clean.
GP Gully pit ***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other Ore He PILE TRAP SEDIMENTS BEING WASHED [As Constructed
a pully Man Hole er measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS
nm Invert Level TO AVOID RUNOFF PASSING THROUGH.
K&C Kerb & Channel * ACTIONS: . a |
MH Manhole In case of major rainfall events the following action plan shall be followed and responsibly looked after by the
PO Planter outlet CONTRACTOR: T-OFF DRAIN A NT TERM .
RPB Real Property Boundary CUT-OFF DRAIN ALONG CONTOUR — LONG TE PLASTIC SHEET WHEN RAIN OR H d raulic Wh
RPD Real Property description ***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. V
RWO Rain water outlet be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF.
RWH Rain water head *check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V—
SL Surface Level bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Reinhold Koenning MIEAust RPEQ No 7023
Sq Square **clean out sedimentation material as soon as the moisture content allows it. Flow PO Box 181
SWD Storm water drain “check the receiving pit and improve the barriers if required. _<———— Moffat Beach, QLD, 4551
ste Trench grate transverse bar “REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! WrOrwrwnr AA een 7 email: [email protected]
TG(I) Trench grate longitudinal bar SES SWIG RINSE PH: (07) 5491 4333
u/g Underground
u/s Under slab CLIENT
u.n.o. Unless noted otherwise SEDIMENT FENCE AS SPECIFIED ALONG CONTUR
(EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L
DESIGNER:
STOCKPILES \ DES CRAWFORD J
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX
MOUNDS (2m max. HEIGHT.)
DRAWING TITLE:
STORMWATER /
DRAINAGE AND )
MANAGEMENT PLAN
Design| RK. | checked | Ch [Date 01-03-16 | Dwg. No. AMD.
SCALE: 1 : 100 on At u.no.| 4 Of 4 3105-4 J
RPD:— LOT 219 RP 135364

 

 

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20150426 - Stormwater Drainage and Management Plan.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.